BLD-Final | 1/3/2007 | 1/4/2007 | 1/3/2007 | P | FAIL |
Jim Sly
|
|
|
340- 5500 darby kelly C/N posted. Egress ladder/ grate Temp glass, access panels
|
Telephone call | | | 8/10/2006 | | DONE |
|
|
|
Called Applicant and left a message. I reminded him that new Plan Review is Pending New plan submittals with corrections. (SRZ)
|
BLD-Framing/Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 | A | PASS |
Mike Jordan
|
|
|
darby - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. All framing issues have been resolved.
|
BLD-Energy code compliance | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Mike Jordan
|
|
|
darby - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | FAIL |
Dave Hannah
|
|
|
darby -reinsp -it is ready; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | FAIL |
Mike Jordan
|
|
|
darby; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Repairs not yet completed.
|
BLD-Framing/Rough-in | 7/7/2006 | 7/7/2006 | 7/7/2006 | P | FAIL |
Mike Jordan
|
|
|
darby ###-#### cell--late pm if possible. Install hangars on floorjoist in hallway, complete fireblocking. c/n posted.
|
BLD-Framing/Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 | P | FAIL |
Jim Sly
|
|
|
dane- call 1/2 hr prior so he can be there for the insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley C/N
|
Plan Reviewer's activity | | | 6/23/2006 | | PEND |
|
|
|
Builder lost Approved plans and requested new plan review. New plan review pending Tall Wall Engineering, Roof framing plans, New res-check..
|
Plan resubmittals requested | | | 6/23/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/19/2006 at 12:50:45 PM. Contact: ###-####. Need plans, truss Eng, and foam/seal
|
BLD-Foundation | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Jim Sly
|
|
|
rebar//cliff; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Mike Jordan
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Issue PAID IN FULL permit | | | 6/15/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 3/25/2005 | 3/25/2005 | 5/19/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/4/2005 | 2/4/2005 | 5/19/2005 | | PASS |
|
|
|
5/19/2005 09:22:31 SRZ - activity updated through activity BLDA022 from case BLD05-00274.
|
Case Summary (BLD) | | | 5/19/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2005 | | DONE |
|
|
|
One set red-lined.
|
Inspection Record Card- Bld | | | 5/19/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2005 | | DONE |
|
|
|
lft vm with matthew ###-#### that permit and fees are ready to be picked up
|
Routing - PLAN CHECK | 3/11/2005 | | 5/19/2005 | | PASS |
|
|
|
Plan needs Code references changed to 2003 IRC, Tall wall Engineering, and a Roof Framing Plan submitted for Plan Review.
I called JS Design on 3-25-05 and left a message for Justin.
Justin called me back on 3-29-05 and said he's working on getting me the above materials in order to complete Plan Review. (SRZ)
Recieved materials. 05-18-05
|
Routing - PUBLIC WORKS | 3/10/2005 | | 3/11/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 3/10/2005 | | 3/10/2005 | | PASS |
|
|
|
plans resubmitted with corrections.eeg called applicant to confirm passed to next review step
|
Application received | | | 2/4/2005 | | |
|
|
|
|
Routing - PLANNING | 2/4/2005 | | 2/4/2005 | | FAIL |
|
|
|
driveway to wide, 40'+?, plan scale incorrect. eeg.
|