BLD-Final | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | PASS |
Mike Jordan
|
|
|
lon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | FAIL |
Jim Storey
|
|
|
lon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Wall cover | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | DONE |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 10:08:53 PM. no phone # to call,, but this has been covered,, also 1210 is not a posted address,,,,, ??????????
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | PART |
Jim Storey
|
|
|
courtland; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa front porch post in conctrete isue not none.
|
BLD-Energy code compliance | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | PASS |
Jim Storey
|
|
|
courtland; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | NR |
Jim Storey
|
|
|
cortland; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mech insp. failed no insp.bld.
|
BLD-Footing | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | PART |
Dave Hannah
|
|
|
cortland =garage only; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | FAIL |
Dave Hannah
|
|
|
cortland; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs seal package installed and mec r/i
|
BLD-Footing | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | FAIL |
Dave Hannah
|
|
|
garage only///cortland; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ftgs not dug per plans 4/19/2005 1:08:18 PM
|
BLD-Footing | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | PASS |
Jim Storey
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Issue PAID IN FULL permit | | | 3/21/2005 | | |
|
|
|
|
(F) Reprint permit | | | 3/21/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/3/2005 | | |
|
|
|
|
Telephone call | | | 3/3/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 2/4/2005 | 2/4/2005 | 3/2/2005 | | PASS |
|
|
|
3/2/2005 14:10:19 SRZ - activity updated through activity BLDA022 from case BLD05-00278.
|
Routing - PLAN CHECK | 2/8/2005 | | 3/2/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/2/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2005 | | DONE |
|
|
|
ONE SET RED-LINED DUE TO EXCESSIVE RED-LINING..
(SRZ)
|
Inspection Record Card- Bld | | | 3/2/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/28/2005 | | PEND |
|
|
|
I met with Steve Brown(Boise Rep.) and did not get a solution to the 2nd floor cantilever problem. I then called Amanda at AJ's drafting and design and spoke with her and CW construction about cantilever problem again and requested Engineering and/or redesign. He said he would get an addendum to me as soon as possible.(SRZ) 3:55
|
Plan Reviewer's activity | | | 2/25/2005 | | PEND |
|
|
|
Called AJ's drafting and Design on 2/25/05 at 9:15 AM and asked Amanda for Cantilever details from Franklin Building Supply or Engineering equiv. for rear 2nd floor cantilever.
|
Routing - PUBLIC WORKS | 2/7/2005 | | 2/8/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 2/7/2005 | | 2/7/2005 | | PASS |
|
|
|
The first floor bump-out indicated on the site plan is approved ONLY AS A CHIMNEY W/ ASSOCIATED FIREPLACE, as indicated w/ redlines at direction of applicant.
|
Routing - PLANNING Land Div | 2/4/2005 | | 2/7/2005 | | PASS |
|
|
|
Lot 20, Block 2 of Orchard Park Addition. Parcel hold on until a demolition permit is issued for existing residence.
|
Application received | | | 2/4/2005 | | |
|
|
|
|