BLD-Final | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Dave Hannah
|
|
|
herschel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/28/2006 | 3/1/2006 | 3/2/2006 | P | FAIL |
Dave Hannah
|
|
|
Herschol; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong temp glass at master bath fire doors at garage post address handrail front steps
|
BLD-Grading Inspection | 3/1/2006 | 3/1/2006 | 3/1/2006 | | BOND |
|
|
|
The grading and drainage is complete. However, revegetation has not been completed and for this a $500.00 bond is recommended. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 | P | NR |
Dave Hannah
|
|
|
hershal or diane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs terrys sign off
|
BLD-Energy code compliance | 8/24/2005 | 8/25/2005 | 8/25/2005 | A | PASS |
Dave Hannah
|
|
|
nordhaus; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/21/2005 | 8/22/2005 | 8/22/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2005 at 8:09:04 PM. Contact: ###-####.
|
BLD-Conference | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | DONE |
Dave Hannah
|
|
|
herschol; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PASS |
Jim Storey
|
|
|
herschol--shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieexter brace panels ok
|
BLD-Foundation | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Troy James
|
|
|
darin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/30/2005 | 3/31/2005 | 3/31/2005 | P | PART |
Troy James
|
|
|
darin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
wip 3/31/2005 2:17:11 PM
|
BLD-Grading Inspection | 3/31/2005 | 3/31/2005 | 3/31/2005 | | DONE |
Jim Storey
|
|
|
Footing subgrade was approved by the geotechnical engineer on 3/22/05
|
BLD-Grading Inspection | 3/22/2005 | 3/22/2005 | 3/22/2005 | | CANC |
Troy James
|
|
|
Footing subgrade approved by the geotech
|
PubWorks Subgrade Approval | 2/7/2005 | 2/7/2005 | 3/22/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
Plan assigned to (SAM) | 3/10/2005 | | 3/14/2005 | | PASS |
|
|
|
3/14/2005 14:09:07 SAM - activity updated through activity BLDA022 from case BLD05-00285.
|
Case Summary (BLD) | | | 3/14/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/14/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2005 | | |
|
|
|
|
Print Occupancy Form | | | 3/14/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/14/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 3/3/2005 | | 3/14/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 3/1/2005 | | 3/3/2005 | | PASS |
|
|
|
Plans comply with CFH approval.
|
Routing - PUBLIC WORKS GRADING | 3/1/2005 | | 3/1/2005 | | PASS |
|
|
|
Revised grading plan approved.
|
Routing - FIRE | 2/11/2005 | | 2/14/2005 | | PASS |
|
|
|
No fire sprinklers required (Nativa Terra, Lot 2 block 4)
|
Routing - Erosion and Sediment | 2/10/2005 | | 2/11/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions. No RP listed.
|
Routing - PLANNING | 2/8/2005 | | 2/10/2005 | | FAIL |
|
|
|
CFH05-00005 application received but not yet approved.
|
Routing - PUBLIC WORKS | 2/7/2005 | | 2/8/2005 | | PASS |
|
|
|
|
Application received | | | 2/7/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 2/7/2005 | | 2/7/2005 | | PASS |
|
|
|
Approved as Category 1. CFH05-00005
|