Third Notice BLD | 12/6/2005 | 12/6/2005 | 3/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Telephone call | | | 8/27/2005 | | DONE |
|
|
|
fax over for all final values depts
|
First Notice | | 6/3/2005 | 7/13/2005 | | DONE |
|
|
|
|
BLD-Final | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/13/2005 | | DONE |
|
|
|
no final passed, ok to reissue per jim sly 3/13/05 LEM
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Temp.... OK to Perm after Fire Final for Perm.
|
Permanent Occupancy | | 6/3/2005 | 6/3/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/3/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10620 issued 6-3-05 to G. E. Supply.
|
Temporary occupancy | | | 6/1/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5247 issued 6-1-05 to GE Supply.
|
BLD-Final | 5/26/2005 | 5/26/2005 | 5/27/2005 | P | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Temp Occ. Obtain Perm Occ status within 90 days of this notice.
|
FIRE-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | NR |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 5/18/2005 | 5/25/2005 | 5/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Can sign temp occupancy until the manual releases are provided for the smoke heat vents when the southeast exit sign is fixed.
|
FIRE-Final Inspection | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lighting (if this is the only item left I can sign a temp per Sam Rogers), repair the two office exit lights, provide manual operation for the smoke vents per IFC 910.3.1
|
BLD-Framing/Rough-in | 5/16/2005 | 5/17/2005 | 5/17/2005 | P | PASS |
Tom Arcoraci
|
|
|
jim --ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PASS |
Jim Sly
|
|
|
jimmy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
joist hangers ok,, will be covered w/ plywood sheating,, all 6 holes filled on tops,, 4/8/2005 9:57:05 AM
|
BLD-Footing | 3/30/2005 | 3/30/2005 | 3/30/2005 | P | FAIL |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie placed with out city insp.
|
Issue PAID IN FULL permit | | | 3/22/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/21/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2005 | | |
|
|
|
|
Print Occupancy Form | | | 3/21/2005 | | |
|
|
|
|
Telephone call | | | 3/21/2005 | | DONE |
|
|
|
called gayle jensen at ###-#### permit is ready
|
Routing - PLAN CHECK | 3/4/2005 | | 3/19/2005 | | PASS |
|
|
|
(3-16-05) Completed the resubmittal review. Items are still unresolved. Waiting for resubmittals.
(3-19-05) Drawings approved after resubmittal review.
|
Plan assigned to (CJW) | 2/11/2005 | | 3/19/2005 | | PASS |
|
|
|
3/19/2005 12:30:26 CJW - activity updated through activity BLDA022 from case BLD05-00288.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/18/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheets A-2,A-3, & M0.3 Taken to Carl W.
|
Plan resubmittals received | | | 3/9/2005 | | DONE |
|
|
|
Received Transmittal Letter, 2 Letters ,2 GE Supply Mezzanine calcs, & 2 Copys of sheets A-2,A-3 Taken to Carl W.
|
1st review completed | | | 3/4/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - FIRE | 2/28/2005 | | 3/4/2005 | | PASS |
|
|
|
Review comments faxed to architects due to delayed submittal requirements.
|
Routing - PLANNING | 2/25/2005 | | 2/28/2005 | | PASS |
|
|
|
Approved per DRH03-00099
|
Routing - PLUMBING | 2/23/2005 | | 2/24/2005 | | PASS |
|
|
|
provide a water supply at the mop sink for automatic soap dispensor, if used. 120 deg. max hot water to public lavs. provide temp. limiting stops on valve or tempering valves.
|
Routing - PLAN CHECK | 2/16/2005 | | 2/23/2005 | | FAIL |
|
|
|
The IBC plan review was started February 18, 2005 and was finished on February 23, 2003. The Architect was required to resubmit drawings. See the plan review report.
|
Routing - PUBLIC WORKS | 2/11/2005 | | 2/16/2005 | | PASS |
|
|
|
|
Application received | | | 2/7/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2005 | | |
|
|
|
|
Fee Review-notes | 2/7/2005 | 2/7/2005 | | | |
|
|
|
|