BLD-Final | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/14/2005 at 9:34:39 AM. Contact: ###-####.
|
DOC - Permit Finaled | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | NR |
Dave Hannah
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs terrys final for hill side
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/10/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 4:09:20 PM. Contact: ###-####.
|
BLD-Grading Inspection | 3/23/2005 | 3/23/2005 | 3/23/2005 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical enigneer
|
BLD-Footing | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Troy James
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PubWorks Subgrade Approval | 2/11/2005 | 2/11/2005 | 3/23/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Boise Public Works prior to scheduling a footing inspection. Call Terry
Records at ###-####.
|
Override - Activity Holds | | | 2/15/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/15/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 2/14/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 2/14/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 2/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2005 | | DONE |
|
|
|
called builder let him know permit is ready to pick up JRR
|
Plan assigned to (PEP) | 2/7/2005 | | 2/11/2005 | | PASS |
|
|
|
2/11/2005 16:05:18 PEP - activity updated through activity BLDA022 from case BLD05-00292.
|
Routing - PUBLIC WORKS GRADING | 2/7/2005 | | 2/11/2005 | | PASS |
|
|
|
Footing subgrade must be approved by geotechnical engineer prior to scheduling a footing inspection.
|
Case Summary (BLD) | | | 2/11/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/7/2005 | | 2/8/2005 | | PASS |
|
|
|
To SGW for ESC hillside plan review. Plan approved with attached conditions.
|
Application received | | | 2/7/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 2/11/2005 | | | | |
|
|
|
|