Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD05-00311
StatusFinaled
Name HORIZON RETAIL CONSTRUCTION INC
Site Address 380 S 8TH ST
Project NameJOS A BANK CLOTHIERS BODO 7
Customer Number 
ePlanReviewNo
Description
(JOS. A BANK CLOTHIERS - BODO BLDG #7) This building is fire sprinklered for fire area and for the future multitheater complex. To create a new 4,324 square foot retail sales tenant space within a new 135,950 square foot building. This space is located on the 1st story, near the Southwest corner. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, millwork, suspended ceilings, and finishes. All work shall comply with the approved drawings, plan review report, and all applicable codes and ordinances. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/25/2016 DONE
Third Notice BLD1/8/20071/8/20074/13/2007 DONE
Second Notice has not been responded to.
Telephone call  3/22/2007 DONE
call to lisa w/ ymc she will call the gc and verify and call back today to verify FV for YMC
Telephone call  3/22/2007 DONE
call to Horizon, left msg on jennifer in accounting ans mach. need to now why the difference btwn what YMC claims and what the Mec FV is.
Telephone call  3/22/2007 DONE
call from lisa w/ YMC, she states that her FV is $27,000 that is what the GC paid YMC for this job.
Third Notice BLD1/8/20071/8/20072/22/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/18/200612/27/2006 DONE
First Notice 10/17/200612/27/2006 DONE
Permanent occupancy  10/18/2006 DONE
Perm. Occ. Cert. # 11260 issued 10-18-06 to Jos. A. Bank Clothiers.
Permanent Occupancy 4/5/20064/5/2006 DONE
Details
BLD-Other2/9/20062/9/20062/9/2006 DONE
Temp. Occ. Cert. # 5299 extended for 90 days per Jenifer until 5-2-06.
BLD-Final11/1/200511/3/200511/3/2005APASS
DetailsDave Hannah
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ ok for perm occ after shell and core gets its c.c
Temporary occupancy  11/3/2005  
Temp. Occ. Cert. # 5299 issued 11-3-05 to Jos. A. Bank Clothiers.
FIRE-Final Inspection11/1/200511/2/200511/2/2005PPASS
DetailsForrest France
Fire life safety passed inspection.
FIRE-Final Inspection10/28/200510/31/200510/31/2005AFAIL
DetailsForrest France
Install emergency lights in the tailoring area as shown on approved plans, provide permanent suite address numbers, final pending shell permit approvals.
BLD-Framing/Rough-in9/30/200510/3/200510/3/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2005 at 12:35:30 PM. Contact: ###-####.framing for back area ok to cover
BLD-Other9/20/20059/21/20059/21/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2005 at 1:19:45 PM. Contact: ###-####. fire proofing on columns ok to cover and fire rated ply wood stripes ok
BLD-Framing/Rough-in9/7/20059/8/20059/9/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/7/2005 at 3:36:16 PM. Contact: ###-####. ok to cover walls and soffits in main area in front
Issue PAID IN FULL permit  8/24/2005 DONE
Telephone call  6/29/2005 DONE
eft mess for mario valdez at ###-#### is ready
Inspection Record Card- Bld  5/27/2005  
Print Occupancy Form  5/27/2005  
Permit Ready to Issue  5/27/2005  
Telephone call  5/27/2005 DONE
left mess for mario valdez at ###-#### is ready
Plan assigned to (CJW)2/11/2005 5/26/2005 PASS
5/26/2005 15:09:29 CJW - activity updated through activity BLDA022 from case BLD05-00311.
Routing - PLANNING5/25/2005 5/26/2005 PASS
Approved per DRH03-00062
PLANS/APPL TAKEN TO FRONT DESK  5/26/2005 DONE
Routing - PLAN CHECK3/11/2005 5/25/2005 PASS
(4-15-05) Finished the resubmittal review. Item #15 is not resolved. Waiting for the redesign of the mechanical system.

(5-18-05) Resubmitted drawings were reviewed. Item #15 was resolved. Drawings approved by the IBC Plans Examiner. Waiting untill called for by Planning.
Plan resubmittals received  5/16/2005 DONE
Received Transmittal , 1 Letter, & 1 Copys of sheets P101,M401,E101 Taken to Carl W.
Plan resubmittals received  4/8/2005 DONE
Received Transmittal 1 8/12 X 11 Lighting comp, 1 Letter & 2 Copys of sheets A001,A002,A004,A101,A201,A202,A302,A401,A801,A802,M401,M701,E401,E801 Taken to Carl W.
1st review completed  3/11/2005 FAIL
failed plan check and planning.
Routing - FIRE3/7/2005 3/11/2005 PASS
review comments faxed to architect due to special conditions relative to fire alarms in buildings with nonseparated uses.
Routing - PLUMBING3/1/2005 3/7/2005 PASS
approved per plan and 2003 UPC
Routing - PLAN CHECK2/22/2005 3/1/2005 FAIL
The IBC plan review was started Feb. 25, 2005 and was finished on March 1, 2005. Resubmitted drawings were required. See the plan review report.
Routing - PLANNING2/22/2005 2/22/2005 FAIL
Sarah - Applicant will need to process a zoning certificate application for Design Review approval per DRH03-00061 condition 1b. I am contacting Mr. Valdez re: this requirement. There do not look to be any problems with the Design it is just a matter of processing the paper work to get the requirements of the original design review satisfied.
Routing - PUBLIC WORKS2/11/2005 2/22/2005 PASS
Application received  2/9/2005  
Recd Pcfee & Taken To Pln CK  2/9/2005 DONE
Plans ACCEPTED BY PLAN TECH  2/9/2005 DONE
Called Mario Valdez ( 1-###-#### ) to remind him that we need the Lighting/Mechanical Comp on the 2003 Code and they need to be full sheets ( Received Check and rest of application to start plans through 2-8-05) Ok to take in per Tempra W. & Sara S. 2-11-05 Received MEC & LIGHTING Comp inserted into plans.///DLD