Case Summary (BLD) | | | 3/26/2013 | | DONE |
|
|
|
|
Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/17/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/28/2007 | 10/17/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 9/28/2007 | | DONE |
Carol Montgomery
|
|
|
Signed off - Final - All requirements have been met.
|
Permanent Occupancy | | | 9/28/2007 | | DONE |
|
|
|
|
BLD-Final | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All issues have been resolved. Will be ok for perm occ. once code enforcement finals.
|
Temporary occupancy | | | 5/31/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5600 issued 5-31-07 to Internet Auto.
|
BLD-Final | 5/29/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for temp occ. Stairway issue to managers office. Not wide enough. Agreed to temp if office was not used until stairs are fixed.
|
FIRE-Final Inspection | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. There is no storage of hazardous materials at this time for verification.
|
Code Occupancy Approval Temp | | | 5/24/2007 | | FAIL |
|
|
|
TEMPORARY APPROVED. BOND IN PLACE.
|
FIRE-Conference | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | DONE |
Troy Cobbley
|
|
|
I went over fire extinguisher placement, door hardware and exit sign placement
|
FIRE-Final Inspection | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | CANC |
Troy Cobbley
|
|
|
After my conversation with John this inspection is to be canceled.
|
BLD-Other | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PASS |
Mike Jordan
|
|
|
john - ceiling cover; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ceiling grid ok. Received new details from architect to reflect cicsca standards. Plan was submitted. ok to cover.
|
Plan resubmittals received | | | 5/8/2007 | | |
|
|
|
received transmittal letter from patrick mckeegan & (4) sheets of ceiling details & (2) sheets each f A1.O-Sara Schaffer took one of the A1.O sheets.--per Mike Jordan plans taken to his box
|
BLD-Framing/Rough-in | 4/30/2007 | 5/1/2007 | 5/1/2007 | P | FAIL |
Mike Jordan
|
|
|
john Note: ceiling cover ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ceiling grid not per plan.
|
Plan resubmittals received | | | 4/30/2007 | | |
|
|
|
Received transmittal, letter from architect Patrick McKeegan, and 2 copies of pages T1.0, A3.2, A3.4, A3.5; per Mike Phillips give to building inspector; put plans in Mike Jordan's box and called Mike to tell him they are in there.
|
FIRE-Conference | 4/5/2007 | 4/6/2007 | 4/9/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over the review comments pertaining to the storage of the motor oil
|
BLD-Conference | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | CANC |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needed fire inspector for conference. Contractor to call back and rechedule.
|
BLD-Framing/Rough-in | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PASS |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Conference | 1/5/2007 | 1/5/2007 | 1/5/2007 | P | DONE |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Issue with headroom clearance at egress stairway to mezz and with mezz above. contractor to contact architect for possible solutions.
|
BLD-Framing/Rough-in | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior non load bearing walls at south end of store under new mezz.
|
BLD-Framing/Rough-in | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior framing and shearnailing on back offices.
|
BLD-Energy code compliance | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. North wall, eastwall 2nd floor, southwall.
|
BLD-Framing/Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | PASS |
Mike Jordan
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. After meeting with contractor, architect and plan review, it was determined that fire barrier wall is not required under the 2003 non seperated uses condition and buliding will be fire sprinkled. Architect will submit asi to plan review reflecting the changes. Also inspected framing above bowling alley.
|
BLD-Framing/Rough-in | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N....Arch of record to provide method of firestopping for through penitrations @ 2hr fire barrier wall....of wood truss chords and glue lam beams....Sect 712 2003 IBC
|
BLD-Footing | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | PASS |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. New interior footings and column pad footings for new mezz. Also reinspected added blocxking at shear wall at bowling alley. Verified that putty pads were installed at 2hr seperation wall.
|
FIRE-Conference | 9/26/2006 | 9/26/2006 | 9/26/2006 | P | DONE |
Forrest France
|
|
|
On site confrence to discuss exit signage and door hardware at two locations in the sw corner of the building.
|
BLD-Framing/Rough-in | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PART |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing ast bowling alley(needs to add blocking at shearwall) Interior steel stud framed walls for offices at nw corner of bldg.(ok to insul and rock thisn area) Inspected 2hr seperation wall. Wall is one sided. Contractor needs to provide UL listings for penetrations and ele. needs to install putty pads\ were applkicable.
|
(F) Reprint permit | | | 7/28/2006 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/27/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/27/2006 | | DONE |
|
|
|
|
BLD-Footing | 7/26/2006 | 7/26/2006 | 7/26/2006 | P | PASS |
Mike Jordan
|
|
|
john - ###-####. Canopy foundations in north parking lot per supplied engineering. Noted to contractor to double check with planning and zonning to ensure that tent canopies would be allowed in front parkinglot.
|
Plan assigned to (M_P) | 1/26/2006 | 1/26/2006 | 7/26/2006 | | PASS |
|
|
|
7/26/2006 09:23:05 M_P - activity updated through activity BLDA022 from case BLD05-00317.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2006 | | DONE |
|
|
|
tlk to cricket langworthy ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 7/26/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 7/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/26/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 7/21/2006 | | 7/25/2006 | | PASS |
|
|
|
PLAN MODIFICATION *
|
Case Summary (BLD) | | | 7/25/2006 | | |
|
|
|
|
Routing - FIRE | 7/13/2006 | | 7/21/2006 | | PASS |
|
|
|
No additional review comments. Original review dated 7/15/05 remains as is.
|
Routing - PLAN CHECK | 6/26/2006 | | 7/13/2006 | | PEND |
|
|
|
PLAN MODIFICATION * Waiting for others to approve prior to issuing permit.
|
Case Summary (BLD) | | | 7/13/2006 | | |
|
|
|
|
Routing - PLANNING | 6/23/2006 | | 6/26/2006 | | PASS |
|
|
|
PLAN MODIFICATION * Adding new stair to the exterior of the building on the east facing wall.
Exterior staircase okay w/ revised plans. No other exterior changes allowed or approved.
|
Routing - PLAN CHECK | 3/7/2006 | | 6/23/2006 | | |
|
|
|
PLAN MODIFICATION * Routing to Planning because of new exterior stair.
Waiting for additional information to be submitted about requirements for an elevator.
|
Plan resubmittals received | | | 6/21/2006 | | DONE |
|
|
|
Received 3 structural calcs, & 3 copys of sheets A1.3,A1.4,A3.1 taken to Mike P.
|
BLD-Framing/Rough-in | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Mike Jordan
|
|
|
john walker ###-#### Exterior framing for popout panel. As per RFI.
|
Override - Parcel Holds | | | 5/30/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | PASS |
Mike Jordan
|
|
|
###-#### - framing steel. exterior stell stud framing at upper portion of bldg. for stucco system.
|
Override - Parcel Holds | | | 5/25/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/12/2006 | 5/15/2006 | 5/15/2006 | P | PASS |
Mike Jordan
|
|
|
###-#### - john Roof framing at new entry. Ok to cover.
|
Override - Parcel Holds | | | 5/12/2006 | | |
|
|
|
|
BLD-Conference | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | DONE |
Mike Jordan
|
|
|
conf only ###-#### John. Meet with John on job site and went over plans, pecial insp reports and reveiwed some of the work done to date and work to be done. Did note that architectual plans did note match with work being done on new roof. Noted to cointractor that he will need to get some as builts and have them approved.
|
Override - Parcel Holds | | | 5/5/2006 | | |
|
|
|
|
Plan Modification Accepted | | | 3/29/2006 | | |
|
|
|
Letter for Plan Mod from Pat McKeegan dated 3/24/06, taken to Mike P.
|
Routing - PLAN CHECK | 2/10/2006 | | 3/7/2006 | | FAIL |
|
|
|
PLAN MODIFICATION Waiting for information from architect about second floor or mezzaine and if an elevator is required.
|
Routing - PLAN CHECK | 1/26/2006 | | 2/10/2006 | | |
|
|
|
Requested plans from Archives. 1/26/06
Received plans back from archives on 2/10/06.
|
Plan resubmittals received | | | 1/31/2006 | | DONE |
|
|
|
received 3 copys of structural calcs taken to Mike P.
|
Plan Modification Accepted | | | 1/26/2006 | | |
|
|
|
Plan modification excepted for BLD05-00317 for the redesign of an addition of a 2,363 sq ft mezzanine on sheets A-1, A-2, A-3, S0.1, S1.01, S1.02, S5.01, S5.02, S5.03, S5.04, S6.01, M1.D, M3.0, E1.D, E2.D, E4.D, E6.0, EC.2. Routed to Mike Phillips.
|
Issue PAID IN FULL permit | | | 8/16/2005 | | |
|
|
|
|
(F) Reprint permit | | | 8/15/2005 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 2/14/2005 | 2/14/2005 | 7/18/2005 | | PASS |
|
|
|
7/18/2005 08:14:20 M_P - activity updated through activity BLDA022 from case BLD05-00317.
|
Routing - PLAN CHECK | 7/15/2005 | | 7/18/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/18/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/18/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2005 | | DONE |
|
|
|
talked to skip jones at ###-#### that permit is ready & need achd
|
Routing - FIRE | 7/12/2005 | | 7/15/2005 | | PASS |
|
|
|
PLAN MODIFICATION * resubmittal acceptable. Revised review comments faxed to architect.
|
Routing - PLAN CHECK | 6/24/2005 | | 7/12/2005 | | |
|
|
|
Routing to fire
|
Plan resubmittals received | | | 7/6/2005 | | DONE |
|
|
|
Received 1 Letter, 1 United Water Sheet, & 2 Copys of sheets A1.0,A3.1,P1.D,E3.A,E3.B,E3.C,E3.D Taken to Mike P.
|
Routing - PUBLIC WORKS | 6/23/2005 | | 6/24/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/10/2005 | | 6/23/2005 | | |
|
|
|
Routing to P.W.
|
Routing - FIRE | 6/6/2005 | | 6/10/2005 | | FAIL |
|
|
|
Most of the Fire comments were not addressed in the resubmittal. Revised review faxed to architect.
|
Routing - PLAN CHECK | 3/31/2005 | | 6/6/2005 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 5/31/2005 | | |
|
|
|
Received (2) copies of sheet EN1.0, A3.1, A3.2, A3.3, A3.4, A3.5, A5.1, A7.4, P1.C, P4.0, E2.C and EC.2. Also received (2) copies of United Water letter, List of Consumables and MSD data. Routed to Mike P.
|
Routing - FIRE | 3/28/2005 | | 3/31/2005 | | FAIL |
|
|
|
Fire hydrants, fire sprinkler flow info, fire extinguishers, fire alarm system, exiting, hazardous materials and operations. Review comments faxed to architect.
|
1st review completed | | | 3/31/2005 | | FAIL |
|
|
|
failed public works, plan check and fire.
|
Routing - PLAN CHECK | 3/9/2005 | | 3/28/2005 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 3/7/2005 | | 3/9/2005 | | PASS |
|
|
|
Sasra S. DRH03-00207
Approved per DRH03-00207.
|
Routing - PLUMBING | 2/28/2005 | | 3/7/2005 | | PASS |
|
|
|
use boise city approved flammable liquids interceptor detail, attached, do not tie up stream chamber vent to other vents.
|
Routing - Erosion and Sediment | 2/25/2005 | | 2/28/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 2/17/2005 | | 2/25/2005 | | FAIL |
|
|
|
Brian Murphy rejected- needs more pretreatment information - can contact him at ###-####
|
Routing - PLANNING Land Div | 2/14/2005 | | 2/17/2005 | | PASS |
|
|
|
Lot 16 of Brookside Place Subdivision.
|
Plan routing begun/NEW & ADDTN | | | 2/14/2005 | | |
|
|
|
|
(F) Reprint permit | | | 2/14/2005 | | DONE |
|
|
|
|
Application received | | | 2/10/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 2/10/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 2/10/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/10/2005 | | |
|
|
|
|