Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD05-00317
StatusFinaled
Name INTERNET AUTO
Site Address 10175 W FAIRVIEW AVE
Project NameINTERNET AUTO
Customer Number 
ePlanReviewNo
Description
(INTERNET AUTO) To remodel an existing 36,600 sq. ft. retail store with a 680 sq.ft. mezzanine, to an automobile dealership, showroom, repair garage. To add approximately 1,200 sq.ft. to this building on the west side for a car wash area to add a 2,100 sq.ft. second floor for the finance and general manager's office. Note: This building is fully fire sprinklered for area increase. All construction per the approved plans and attached comment list. Additional work included in this permit is to reconstruct the parking lot, install new landscaping and construct additional parking area. (PLAN MODIFICATION 1/27/06 ) * To add 2,830 square feet of mezzaine area for storage and convert the existing second floor area to meet the requirements of a mezzaine by adding a second exit to the exterior. The design loads for the storage area is light storage at 125 pounds per square foot. MJP DRH03-00207
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/26/2013 DONE
Second Notice BLD10/17/200710/17/200710/17/2007 DONE
First Notice has not been responded to.
First Notice 9/28/200710/17/2007 DONE
Code Occupancy Approval  9/28/2007 DONE
DetailsCarol Montgomery
Signed off - Final - All requirements have been met.
Permanent Occupancy  9/28/2007 DONE
BLD-Final5/31/20075/31/20075/31/2007PPASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All issues have been resolved. Will be ok for perm occ. once code enforcement finals.
Temporary occupancy  5/31/2007 DONE
Temp. Occ. Cert. # 5600 issued 5-31-07 to Internet Auto.
BLD-Final5/29/20075/30/20075/30/2007PPART
DetailsMike Jordan
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for temp occ. Stairway issue to managers office. Not wide enough. Agreed to temp if office was not used until stairs are fixed.
FIRE-Final Inspection5/29/20075/30/20075/30/2007APASS
DetailsTroy Cobbley
Life safety passed. There is no storage of hazardous materials at this time for verification.
Code Occupancy Approval Temp  5/24/2007 FAIL
TEMPORARY APPROVED. BOND IN PLACE.
FIRE-Conference5/21/20075/21/20075/21/2007PDONE
DetailsTroy Cobbley
I went over fire extinguisher placement, door hardware and exit sign placement
FIRE-Final Inspection5/8/20075/9/20075/9/2007ACANC
DetailsTroy Cobbley
After my conversation with John this inspection is to be canceled.
BLD-Other5/8/20075/9/20075/9/2007APASS
DetailsMike Jordan
john - ceiling cover; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ceiling grid ok. Received new details from architect to reflect cicsca standards. Plan was submitted. ok to cover.
Plan resubmittals received  5/8/2007  
received transmittal letter from patrick mckeegan & (4) sheets of ceiling details & (2) sheets each f A1.O-Sara Schaffer took one of the A1.O sheets.--per Mike Jordan plans taken to his box
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007PFAIL
DetailsMike Jordan
john Note: ceiling cover ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ceiling grid not per plan.
Plan resubmittals received  4/30/2007  
Received transmittal, letter from architect Patrick McKeegan, and 2 copies of pages T1.0, A3.2, A3.4, A3.5; per Mike Phillips give to building inspector; put plans in Mike Jordan's box and called Mike to tell him they are in there.
FIRE-Conference4/5/20074/6/20074/9/2007ADONE
DetailsTroy Cobbley
I went over the review comments pertaining to the storage of the motor oil
BLD-Conference4/5/20074/5/20074/5/2007PCANC
DetailsMike Jordan
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needed fire inspector for conference. Contractor to call back and rechedule.
BLD-Framing/Rough-in3/7/20073/8/20073/8/2007APASS
DetailsMike Jordan
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Conference1/5/20071/5/20071/5/2007PDONE
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Issue with headroom clearance at egress stairway to mezz and with mezz above. contractor to contact architect for possible solutions.
BLD-Framing/Rough-in1/2/20071/3/20071/3/2007APASS
DetailsMike Jordan
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior non load bearing walls at south end of store under new mezz.
BLD-Framing/Rough-in12/12/200612/12/200612/12/2006PPASS
DetailsMike Jordan
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior framing and shearnailing on back offices.
BLD-Energy code compliance12/6/200612/7/200612/7/2006APASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. North wall, eastwall 2nd floor, southwall.
BLD-Framing/Rough-in12/1/200612/4/200612/4/2006APASS
DetailsMike Jordan
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. After meeting with contractor, architect and plan review, it was determined that fire barrier wall is not required under the 2003 non seperated uses condition and buliding will be fire sprinkled. Architect will submit asi to plan review reflecting the changes. Also inspected framing above bowling alley.
BLD-Framing/Rough-in11/17/200611/17/200611/17/2006PPART
DetailsJim Sly
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/N....Arch of record to provide method of firestopping for through penitrations @ 2hr fire barrier wall....of wood truss chords and glue lam beams....Sect 712 2003 IBC
BLD-Footing10/12/200610/13/200610/13/2006APASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. New interior footings and column pad footings for new mezz. Also reinspected added blocxking at shear wall at bowling alley. Verified that putty pads were installed at 2hr seperation wall.
FIRE-Conference9/26/20069/26/20069/26/2006PDONE
DetailsForrest France
On site confrence to discuss exit signage and door hardware at two locations in the sw corner of the building.
BLD-Framing/Rough-in9/21/20069/22/20069/22/2006APART
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing ast bowling alley(needs to add blocking at shearwall) Interior steel stud framed walls for offices at nw corner of bldg.(ok to insul and rock thisn area) Inspected 2hr seperation wall. Wall is one sided. Contractor needs to provide UL listings for penetrations and ele. needs to install putty pads\ were applkicable.
(F) Reprint permit  7/28/2006  
CHANGE STATUS TO (ISS)  7/27/2006 DONE
(F) Reprint permit  7/27/2006 DONE
BLD-Footing7/26/20067/26/20067/26/2006PPASS
DetailsMike Jordan
john - ###-####. Canopy foundations in north parking lot per supplied engineering. Noted to contractor to double check with planning and zonning to ensure that tent canopies would be allowed in front parkinglot.
Plan assigned to (M_P)1/26/20061/26/20067/26/2006 PASS
7/26/2006 09:23:05 M_P - activity updated through activity BLDA022 from case BLD05-00317.
PLANS/APPL TAKEN TO FRONT DESK  7/26/2006 DONE
Telephone call  7/26/2006 DONE
tlk to cricket langworthy ###-#### that permit and fees are ready to be picked up
Override - Parcel Holds  7/26/2006  
Permit Ready to Issue  7/26/2006  
Override - Parcel Holds  7/26/2006  
Override - Parcel Holds  7/26/2006  
Routing - PLAN CHECK7/21/2006 7/25/2006 PASS
PLAN MODIFICATION *
Case Summary (BLD)  7/25/2006  
Routing - FIRE7/13/2006 7/21/2006 PASS
No additional review comments. Original review dated 7/15/05 remains as is.
Routing - PLAN CHECK6/26/2006 7/13/2006 PEND
PLAN MODIFICATION * Waiting for others to approve prior to issuing permit.
Case Summary (BLD)  7/13/2006  
Routing - PLANNING6/23/2006 6/26/2006 PASS
PLAN MODIFICATION * Adding new stair to the exterior of the building on the east facing wall.

Exterior staircase okay w/ revised plans. No other exterior changes allowed or approved.
Routing - PLAN CHECK3/7/2006 6/23/2006  
PLAN MODIFICATION * Routing to Planning because of new exterior stair.


Waiting for additional information to be submitted about requirements for an elevator.
Plan resubmittals received  6/21/2006 DONE
Received 3 structural calcs, & 3 copys of sheets A1.3,A1.4,A3.1 taken to Mike P.
BLD-Framing/Rough-in5/30/20065/31/20065/31/2006APASS
DetailsMike Jordan
john walker ###-#### Exterior framing for popout panel. As per RFI.
Override - Parcel Holds  5/30/2006  
BLD-Framing/Rough-in5/25/20065/25/20065/25/2006PPASS
DetailsMike Jordan
###-#### - framing steel. exterior stell stud framing at upper portion of bldg. for stucco system.
Override - Parcel Holds  5/25/2006  
BLD-Framing/Rough-in5/12/20065/15/20065/15/2006PPASS
DetailsMike Jordan
###-#### - john Roof framing at new entry. Ok to cover.
Override - Parcel Holds  5/12/2006  
BLD-Conference5/5/20065/8/20065/8/2006ADONE
DetailsMike Jordan
conf only ###-#### John. Meet with John on job site and went over plans, pecial insp reports and reveiwed some of the work done to date and work to be done. Did note that architectual plans did note match with work being done on new roof. Noted to cointractor that he will need to get some as builts and have them approved.
Override - Parcel Holds  5/5/2006  
Plan Modification Accepted  3/29/2006  
Letter for Plan Mod from Pat McKeegan dated 3/24/06, taken to Mike P.
Routing - PLAN CHECK2/10/2006 3/7/2006 FAIL
PLAN MODIFICATION Waiting for information from architect about second floor or mezzaine and if an elevator is required.
Routing - PLAN CHECK1/26/2006 2/10/2006  
Requested plans from Archives. 1/26/06
Received plans back from archives on 2/10/06.
Plan resubmittals received  1/31/2006 DONE
received 3 copys of structural calcs taken to Mike P.
Plan Modification Accepted  1/26/2006  
Plan modification excepted for BLD05-00317 for the redesign of an addition of a 2,363 sq ft mezzanine on sheets A-1, A-2, A-3, S0.1, S1.01, S1.02, S5.01, S5.02, S5.03, S5.04, S6.01, M1.D, M3.0, E1.D, E2.D, E4.D, E6.0, EC.2. Routed to Mike Phillips.
Issue PAID IN FULL permit  8/16/2005  
(F) Reprint permit  8/15/2005 DONE
Plan assigned to (M_P)2/14/20052/14/20057/18/2005 PASS
7/18/2005 08:14:20 M_P - activity updated through activity BLDA022 from case BLD05-00317.
Routing - PLAN CHECK7/15/2005 7/18/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/18/2005 DONE
Print Pending Permit.LaserJet4  7/18/2005 DONE
Case Summary (BLD)  7/18/2005 DONE
Case Summary (BLD)  7/18/2005 DONE
Permit Ready to Issue  7/18/2005 DONE
Inspection Record Card- Bld  7/18/2005 DONE
Print Occupancy Form  7/18/2005 DONE
Telephone call  7/18/2005 DONE
talked to skip jones at ###-#### that permit is ready & need achd
Routing - FIRE7/12/2005 7/15/2005 PASS
PLAN MODIFICATION * resubmittal acceptable. Revised review comments faxed to architect.
Routing - PLAN CHECK6/24/2005 7/12/2005  
Routing to fire
Plan resubmittals received  7/6/2005 DONE
Received 1 Letter, 1 United Water Sheet, & 2 Copys of sheets A1.0,A3.1,P1.D,E3.A,E3.B,E3.C,E3.D Taken to Mike P.
Routing - PUBLIC WORKS6/23/2005 6/24/2005 PASS
Routing - PLAN CHECK6/10/2005 6/23/2005  
Routing to P.W.
Routing - FIRE6/6/2005 6/10/2005 FAIL
Most of the Fire comments were not addressed in the resubmittal. Revised review faxed to architect.
Routing - PLAN CHECK3/31/2005 6/6/2005 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  5/31/2005  
Received (2) copies of sheet EN1.0, A3.1, A3.2, A3.3, A3.4, A3.5, A5.1, A7.4, P1.C, P4.0, E2.C and EC.2. Also received (2) copies of United Water letter, List of Consumables and MSD data. Routed to Mike P.
Routing - FIRE3/28/2005 3/31/2005 FAIL
Fire hydrants, fire sprinkler flow info, fire extinguishers, fire alarm system, exiting, hazardous materials and operations. Review comments faxed to architect.
1st review completed  3/31/2005 FAIL
failed public works, plan check and fire.
Routing - PLAN CHECK3/9/2005 3/28/2005 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING3/7/2005 3/9/2005 PASS
Sasra S. DRH03-00207

Approved per DRH03-00207.
Routing - PLUMBING2/28/2005 3/7/2005 PASS
use boise city approved flammable liquids interceptor detail, attached, do not tie up stream chamber vent to other vents.
Routing - Erosion and Sediment2/25/2005 2/28/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS2/17/2005 2/25/2005 FAIL
Brian Murphy rejected- needs more pretreatment information - can contact him at ###-####
Routing - PLANNING Land Div2/14/2005 2/17/2005 PASS
Lot 16 of Brookside Place Subdivision.
Plan routing begun/NEW & ADDTN  2/14/2005  
(F) Reprint permit  2/14/2005 DONE
Application received  2/10/2005  
Override - Parcel Holds  2/10/2005  
Override - Parcel Holds  2/10/2005  
Recd Pcfee & Taken To Pln CK  2/10/2005