Fee Review-notes | 2/10/2005 | 2/10/2005 | 2/6/2007 | | DONE |
|
|
|
|
Second Notice BLD | 3/1/2006 | 3/1/2006 | 3/8/2006 | | DONE |
|
|
|
This permit finaled on the web by Ken Litzinger
|
First Notice | 2/1/2006 | 2/1/2006 | 3/1/2006 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/1/2006 | 2/1/2006 | 2/1/2006 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/2/2005 | 12/2/2005 | 12/2/2005 | A | PASS |
Tom Arcoraci
|
|
|
Please call 1/2 hour before inspection...thanks; Phone #: ###-#### Internet Inspection Request from: Ken Litzinger lc issued
|
PubWorks Occupancy Approval | 12/1/2005 | 12/1/2005 | 12/1/2005 | | DONE |
|
|
|
Drainage project complete, signed occupancy 2/01/05. S.Landaluce
|
Code Occupancy Approval | 12/1/2005 | 12/1/2005 | 12/1/2005 | P | PASS |
Dena Gambrel
|
|
|
Final signed off.
|
BLD-Final | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | NR |
Tom Arcoraci
|
|
|
Please Call 1/2 hour before inspection...thanks; Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
|
FIRE-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | PASS |
Forrest France
|
|
|
Items on correction notice have been resolved, life safety passed inspection.
|
FIRE-Final Inspection | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | FAIL |
Forrest France
|
|
|
The exit discharge lights failed to function, provide approved hardware for the pocket doors at the confrence room as required.
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
BLD-Final | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
|
BLD-Wall cover | 9/12/2005 | 9/12/2005 | 9/12/2005 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
|
BLD-Energy code compliance | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
|
BLD-Framing/Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
|
BLD-Framing/Rough-in | 9/1/2005 | 9/1/2005 | 9/1/2005 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger pending truss bracing as noted on engineering. ok to insulate.
|
BLD-Framing/Rough-in | 8/29/2005 | 8/29/2005 | 8/29/2005 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger need anchor bolts 36 oc at sheer panels/ block and nail roof to sheer panels with a35s an 2.5 conections ok to insulate will need si for epoxy.
|
BLD-Aging Inspection | 8/22/2005 | 8/22/2005 | 8/22/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 6/21/2005 | 6/21/2005 | 6/21/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/21/2005 at 7:34:03 AM. Contact: ###-####.
|
BLD-Footing | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2005 at 9:31:21 AM. Contact: ###-####.
|
(F) Reprint permit | | | 6/7/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2005 | | DONE |
|
|
|
tlk to litzinger construction ###-#### that permit and fees are ready to be picked up
|
Routing - FIRE | 5/9/2005 | | 5/18/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/18/2005 | | 5/18/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/14/2005 | | 5/18/2005 | | PASS |
|
|
|
5/18/2005 13:35:34 JCM - activity updated through activity BLDA022 from case BLD05-00322.
|
Routing - PLAN CHECK | 5/3/2005 | | 5/9/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/9/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to John M.: Cover letter from Kurt Smith, P.E., letter from Richard Kartchner, P.E., 1 copy of plan sheet A4, 2 copies of plan sheets grading & drainage and sheet E-3, transmittal letter addressing comments on ESC05-00183 from Kurt Smith, P.E., 2 full size plan sheets and 3 reduced copies of the stormwater pollution prevention plan.
|
Plan Reviewer's activity | | | 5/9/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets with plan review red lined notes. JCM
|
Routing - FIRE | 4/29/2005 | | 5/3/2005 | | FAIL |
|
|
|
Fire review comment of 3/22 not addressed in resubmittal; i.e. lacks fire hydrant location. Contacted architect who indicated the General and Civil are supposed to be handling this in another resubmittal which will show hydrants and make a few other revisions related to electrical and ADA issues. He'll advise the G/C.
|
Routing - Erosion and Sediment | 4/28/2005 | | 4/29/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals requested | | | 4/28/2005 | | DONE |
|
|
|
Mailed the architect a second comment list requesting the submittal of the remaining items not submitted with the revised plans. JCM
|
Routing - PLAN CHECK | 3/22/2005 | | 4/28/2005 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 4/26/2005 | | DONE |
|
|
|
Received 1Letter , 1 Copy of sheet A4, 2 Copys of sheets A5, 2 Copys of sheet 2 of 3 E-3 2 ESC Plan Stormwater Pollution Prevention Plan. Taken to John M.
|
1st review completed | | | 3/22/2005 | | FAIL |
|
|
|
failed ESC, plan check and fire.
|
Routing - FIRE | 3/16/2005 | | 3/22/2005 | | FAIL |
|
|
|
need hydrants shown. Review faxed to architect.
|
Routing - PLAN CHECK | 3/11/2005 | | 3/16/2005 | | FAIL |
|
|
|
John M.
|
Plan resubmittals requested | | | 3/16/2005 | | DONE |
|
|
|
Mailed the architect a comment list requesting revisions. JCM
|
Routing - PLANNING | 3/7/2005 | | 3/11/2005 | | PASS |
|
|
|
Sara S. DRH04-00157 - Approved per DRH04-00157. I passed the plans on to Susan Riggs.
Susan R. CUP04-00074 ok with condition for 6' high cedar fence to be constructed along west and south property line.
|
Routing - PLUMBING | 3/1/2005 | | 3/7/2005 | | PASS |
|
|
|
increase venting to 7.06 sq inches, notes 4 & 6 on page P-1, increase waste to 3" per detail and fixture schedule.
|
Routing - Erosion and Sediment | 2/28/2005 | | 3/1/2005 | | FAIL |
|
|
|
ESC does not meet requirements per BMC 8-17. Informed PD
|
Routing - PUBLIC WORKS | 2/17/2005 | | 2/28/2005 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/11/2005 | | 2/24/2005 | | PASS |
|
|
|
Called PDQ for pick- up
|
Routing - PLANNING Land Div | 2/14/2005 | | 2/17/2005 | | PASS |
|
|
|
Legal one-time division of Lot 14 of Sorenson Subdivision.
|
(F) Reprint permit | | | 2/14/2005 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/11/2005 | | |
|
|
|
|
Application received | | | 2/10/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/10/2005 | | |
|
|
|
|