Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00337
StatusFinaled
Name THE PROFESSIONALS
Site Address 3804 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(QUICK CASH) This building is NOT fire sprinklered. To prepare an existing 3,361 square foot building to be used as a business providing financial services including check cashing. This project is NOT considered to be a change of occupancy classification. Work is to include a public restroom accessible to the disabled, interior nonbearing security walls, interior bullet resistant glass, interior doors, and finishes. The work shall comply with the approved drawings and all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/19/2005 DONE
Second Notice has not been responded to.
Second Notice BLD10/10/200510/10/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 4/12/200510/10/2005 DONE
Permanent occupancy UNPAID FEE  4/21/2005 DONE
Perm. Occ. Cert. # 10541 issued 4-20-05 to Quick Cash.
BLD-Final4/20/20054/20/20054/20/2005PPASS
DetailsJim Storey
ok to doc final per Jim Story///4/20/05 BAS
Permanent Occupancy 4/20/20054/20/2005 DONE
Details
BLD-Final4/15/20054/18/20054/18/2005AFAIL
DetailsTom Arcoraci
marvin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs mech permit and insp 4/18/2005 10:54:37 AM
FIRE-Final Inspection4/14/20054/15/20054/15/2005APASS
DetailsTroy Cobbley
fire life safety finaled
FIRE-Final Inspection4/13/20054/14/20054/14/2005AFAIL
DetailsTroy Cobbley
Still need required door hardware as per review notes on main double doors.
BLD-Final4/13/20054/14/20054/14/2005PCANC
DetailsTom Arcoraci
please call 45 mins so he can meet ya there marvin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore///cancel per marvin 12:24pm 4/14/05 BAS
FIRE-Final Inspection4/8/20054/11/20054/11/2005AFAIL
DetailsTroy Cobbley
Fail, repair or remove exit signs over west and east doors, remove manual flush bolts from main entry exit, provide approved door hardware on SE door and main double exit doors, provide annual inspection for fire extinguishers, remove latch and bar from
BLD-Final4/8/20054/11/20054/11/2005PCANC
DetailsTom Arcoraci
marvin --call 1/2 hr before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie///cancel per Marvin Riggs 9:20am 4/11/05 BAS
FIRE-Final Inspection4/8/20054/11/20054/8/2005ACANC
DetailsForrest France
###-#### - marvin Note: please call 1/2 hr prior to inspection
BLD-Framing/Rough-in3/28/20053/29/20053/29/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/28/2005 at 2:18:53 PM. Contact: ###-####. needs plumb ri and mech ri 3/29/2005 10:17:31 AM
Issue PAID IN FULL permit  3/24/2005 DONE
Permit Ready to Issue  3/23/2005 DONE
Inspection Record Card- Bld  3/23/2005 DONE
Print Occupancy Form  3/23/2005 DONE
Telephone call  3/23/2005 DONE
talked to jeff likes at ###-#### that permit is ready
Plan assigned to (CJW)2/16/2005 3/22/2005 PASS
3/22/2005 16:00:55 CJW - activity updated through activity BLDA022 from case BLD05-00337.
Routing - FIRE3/15/2005 3/22/2005 PASS
resubmittal acceptable.
Routing - PLAN CHECK3/22/2005 3/22/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/22/2005 DONE
Routing - PLAN CHECK3/11/2005 3/15/2005 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  3/14/2005  
Received Transmittal Letter, & @ Copys of sheet A2.1 Taken to Carl W.
1st review completed  3/11/2005 FAIL
failed fire and plan check.
Routing - FIRE3/8/2005 3/11/2005 FAIL
need clarification on plans of security locing devices. Discussed with architect to explain intent. Faxed review to architect.
Plan resubmittals received  3/9/2005 DONE
Received Transmittal Letter,1 Letter, & 2 Copys of sheets A1.1,A1.2,A2.1,A3.1 Taken to Carl W.
Routing - PLAN CHECK2/16/2005 3/8/2005 FAIL
IBC plan review started on March 7, 2005 and was finished the next day. Resubmitted drawings were required. See the plan review report.
Routing - PUBLIC WORKS2/16/2005 2/16/2005 PASS
Pending Assignment by MYS2/14/2005 2/16/2005 DONE
2/16/2005 10:11:49 MYS - activity updated through activity BLDA172 from case BLD05-00337.
Plans ACCEPTED BY PLAN TECH  2/15/2005  
Application received  2/14/2005  
Recd Pcfee & Taken To Pln CK  2/14/2005  
Fee Review-notes2/14/20052/14/2005