Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00347
StatusExpired
Name ROBERT R COOPER
Site Address 5272 W IRVING ST
Project NameWESTERN POWER SPORTS
Customer Number 
ePlanReviewNo
Description
(WESTERN POWER SPORTS WAREHOUSE) To remodel the 1st floor and mezzanine office area of this existing warehouse tenant per approved plans. Total building is 24,000 sq.ft.; 1st floor office area is 3,807 sq.ft. and mezzanine office area is 2,882 sq.ft. Work to include, interior demo, removal of bearing wall and installation of new footings, columns and beam, construction of four new accessible restrooms, construction of new stairway, installation of new gaurds and handrails on existing stairway, installation of a suspended ceiling system, new exterior sidewalk and stripping of parking lot, this building is fully fire sprinklered for area increase any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/27/20069/27/20069/27/2006 CANC
DetailsTom Arcoraci
DOC - Permit Expired9/27/20069/27/20069/27/2006PPASS
DetailsTom Arcoraci
FIRE-Final Inspection5/18/20065/19/20065/19/2006PFAIL
DetailsTroy Cobbley
Contractor intended for the inspection to be for the associated racking permit, BLD05-02880, but I went over the outstanding issues for this permit with him. Dereck stated he would followup on all items and get it finaled. The associated fire alarm permit is not finaled either.
BLD-Aging Inspection3/9/20063/9/20063/9/2006 NR
DetailsTom Arcoraci
on temp
BLD-Aging Inspection1/2/20061/2/20061/3/2006 NR
DetailsTom Arcoraci
BLD-Aging Inspection10/31/200510/31/200510/31/2005 PASS
DetailsTom Arcoraci
Plan resubmittals received  10/6/2005  
Received (1) letter of transmittal, (1) letter to Ron Hill, (1) set of calculations and (2) copies of sheet A2.2. Routed to Ron H.
FIRE-Final Inspection8/24/20058/29/20058/29/2005PPART
DetailsForrest France
Temporary occupancy for the office area within scope of work is approved per Jenifer Gililland and Troy Cobbley pending a racking permit for the adjacent warehouse.
BLD-Final8/18/20058/19/20058/19/2005PPART
DetailsTom Arcoraci
jared ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp needs handrail to return to wall at entry
FIRE-Final Inspection8/19/20058/19/20058/19/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Jennifer's permission until all items on the correction notice have been corrected.
FIRE-Final Inspection8/18/20058/19/20058/19/2005AFAIL
DetailsTroy Cobbley
Resubmit building plans showing fencing, gates and storage layout for review of the exiting ussues not previously shown on plans. The warehouse area has racks and storage shelves. The top shelf of the racks is at 10'-10". The top of the storage is at 15'-5" and appears to be encapsulated. The top shelf of the storage shelf's is at 8'-9" with the top of the storage at 10'-5 1/2". The storage for both shelfing systems consists of document boxes. Provide annual inspection for the fire extinguishers, provide documentation that the exit signs and exit discharge lighting can be combined and resubmit fire alarm plans/change map at annunciator.
FIRE-Final Inspection8/17/20058/18/20058/18/2005AFAIL
DetailsTroy Cobbley
I went over life safety items with the contractor. No inspection.
BLD-Framing/Rough-in7/27/20057/27/20057/27/2005PPASS
DetailsTom Arcoraci
derrk --ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok 1st flr as with elec insp
BLD-Framing/Rough-in6/14/20056/15/20056/15/2005APASS
DetailsTom Arcoraci
derrick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in5/5/20055/6/20055/6/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/5/2005 at 4:22:23 PM. Contact: ###-####. wrong permit called in
BLD-Foundation4/11/20054/12/20054/12/2005ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/11/2005 at 5:54:46 PM. Contact: ###-####. no one at building 4/12/2005 10:44:24 AM
Issue PAID IN FULL permit  3/28/2005 DONE
Routing - PLAN CHECK3/24/2005 3/25/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/25/2005 DONE
Inspection Record Card- Bld  3/25/2005 DONE
Print Occupancy Form  3/25/2005 DONE
Telephone call  3/25/2005  
Permit Ready to Issue  3/25/2005 DONE
Plan assigned to (R_H)2/16/2005 3/25/2005 PASS
3/25/2005 09:08:23 RMH - activity updated through activity BLDA022 from case BLD05-00347.
Routing - FIRE3/23/2005 3/24/2005 PASS
Not on task list until 3/23/2004. Review approved with conditions, comments faxed to architect. Review included engineering plans for a new manual fire alarm system in office area (not warehouse), approved for installation of backboxes only. Discussed with engineer, G. Eidam.
1st review completed  3/24/2005 PASS
Routing - PLAN CHECK2/16/2005 3/8/2005 PEND
No corrections required by the buildng department review, routed plans to the fire department for review on 3/08/05, Permit pending fire departments review.
Routing - PUBLIC WORKS2/16/2005 2/16/2005 PASS
Architect should also route a set of plans to Bench Sewer District for sewer fees.
Pending Assignment by MYS2/15/2005 2/16/2005 DONE
2/16/2005 10:52:17 MYS - activity updated through activity BLDA184 from case BLD05-00347.
Recd Pcfee & Taken To Pln CK  2/15/2005  
Application received  2/15/2005  
Plans ACCEPTED BY PLAN TECH  2/15/2005  
BLD-Framing/Rough-in7/25/20057/16/2005 P 
DetailsTom Arcoraci
ceiling grid//derrek; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Fee Review-notes2/15/20052/15/2005