Permit Information
Permit NumberBLD05-00383
StatusFinaled
Name BOISE CITY BUILDING CO
Site Address 1905 S ABBS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1612 sq.ft. (776 sq.ft. 1st Floor)(836 sq.ft. 2nd floor) two story single family dwelling with a 467 sq.ft. attached garage, a 19 sq.ft. covered entry porch per approved plans/red-lining and all Engineering. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/24/20056/24/20056/24/2005APASS
DetailsTom Arcoraci
Internet Inspection Request from: nate hauder
DOC - Permit Finaled6/24/20056/24/20056/24/2005PPASS
DetailsTom Arcoraci
BLD-Energy code compliance5/5/20055/6/20055/6/2005APASS
DetailsTom Arcoraci
nate; Phone #: ###-#### Internet Inspection Request from: nate hauder
BLD-Framing/Rough-in5/3/20055/4/20055/4/2005AFAIL
DetailsTom Arcoraci
nate; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cn posted
BLD-Foundation3/11/20053/11/20053/11/2005APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/11/2005 at 5:42:56 AM. Contact: ###-####.
BLD-Footing3/9/20053/10/20053/10/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/9/2005 at 8:25:43 PM. Contact: ###-####.
Permit Ready to Issue  3/9/2005 DONE
Inspection Record Card- Bld  3/9/2005 DONE
Telephone call  3/9/2005 DONE
lft vm with boise city bldg ###-#### that permit and fees are ready to be picked up
Issue PAID IN FULL permit  3/9/2005 DONE
Plan assigned to (SAM)2/17/20052/17/20053/8/2005 DONE
Routing - PLAN CHECK2/22/2005 3/8/2005 PASS
Plan Reviewer's activity  3/8/2005 PEND
I spoke with Mike at Dwell Design Group on 3/08/05 at 11:00 and requested Engineering for the tall wall in the family room. He said he would provide A.S.A.P. (SRZ)
Case Summary (BLD)  3/8/2005  
PLANS/APPL TAKEN TO FRONT DESK  3/8/2005 DONE
Routing - PUBLIC WORKS2/18/2005 2/22/2005 PASS
Contact Bench Sewer District for fees
Routing - PLANNING2/17/2005 2/18/2005 PASS
stop paving at least 3' before west property line as noted on site plan.eeg
Routing - PLANNING Land Div2/17/2005 2/17/2005 PASS
Approved as legal one-time division of Lot 1, Block 6 of Abbs Subdivision.
Application received  2/17/2005