Case Summary (BLD) | | | 8/9/2016 | | DONE |
|
|
|
|
Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/23/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 10/10/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 9/29/2005 | 10/10/2005 | | DONE |
|
|
|
|
BLD-Final | 9/28/2005 | 9/29/2005 | 9/29/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/28/2005 at 12:58:22 PM. Contact: ###-####. ok for perm. c of o
|
Permanent Occupancy | | 9/29/2005 | 9/29/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10751 issued 9-29-05 to the Idaho Central Credit Union.
|
PubWorks Occupancy Approval | 9/20/2005 | 9/20/2005 | 9/20/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 9/20/05. M.Strasser
|
BLD-Final | 9/15/2005 | 9/16/2005 | 9/16/2005 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/15/2005 at 3:57:56 PM. Contact: ###-####. pending elec approval
|
FIRE-Final Inspection | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
Code Occupancy Approval | 9/15/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
FIRE-Conference | 8/29/2005 | 8/30/2005 | 8/31/2005 | P | DONE |
Forrest France
|
|
|
On site discussion with Tom from CM company regarding fire lane curb painting.
|
BLD-Other | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 5:00:56 PM. Contact: ###-####. ceiling grid ok, pending trades
|
FIRE-Conference | 8/1/2005 | 8/2/2005 | 8/2/2005 | P | DONE |
Troy Cobbley
|
|
|
The exit light out of the west exit door needs to be lowered to be viewabel from below the soffit or an additional exit sign will need to be provided in the lower ceiling.
|
BLD-Framing/Rough-in | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 10:12:51 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/24/2005 | 6/24/2005 | 6/27/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/24/2005 at 7:08:58 AM. Contact: ###-####.steel stud framing int ok need to fire stop wood ext walls ok to insulate
|
BLD-Framing/Rough-in | 6/15/2005 | 6/16/2005 | 6/16/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 10:54:30 AM. Contact: ###-####. roof and exterior shear/brace ok to cover
|
BLD-Concrete | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 9:34:40 AM. Contact: ###-####.
pend s. i. 5/20/2005 9:58:10 AM
|
BLD-Concrete | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 12:51:22 PM.
pending si report 5/17/2005 1:27:56 PM
|
BLD-Footing | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | PART |
Tony Young
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pend s i 5/10/2005 3:20:47 PM
|
BLD-Footing | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/5/2005 at 3:37:17 PM. Contact: ###-####.
portion of west ftg 5/6/2005 10:39:32 AM
|
BLD-Footing | 5/6/2005 | 5/6/2005 | 5/6/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/5/2005 at 3:37:17 PM. Contact: ###-####.
canopy tfgs,, pending s. i. report 5/9/2005 8:10:20 AM
|
BLD-Foundation | 5/2/2005 | 5/3/2005 | 5/3/2005 | A | PART |
Tony Young
|
|
|
tom pallsen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pend. si ,,,, point load ftgs,, and part of wall 5/3/2005 10:33:13 AM
|
Plan resubmittals received | | | 5/3/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheet C1.1 Taken to John M.
|
BLD-Footing | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PART |
Tony Young
|
|
|
TOM; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pending s. i. report,,,wip 4/28/2005 12:51:17 PM
|
BLD-Footing | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 2:12:18 PM. Contact: ###-####.
east part of ftg,, pending S. I. report 4/26/2005 10:22:59 AM
|
(F) Reprint permit | | | 4/14/2005 | | |
|
|
|
|
Telephone call | | | 4/13/2005 | | DONE |
|
|
|
left mess for steve christensen at ###-#### or pam walker that permit is ready & need achd
|
Issue PAID IN FULL permit | | | 4/13/2005 | | DONE |
|
|
|
|
OVERRIDE | | | 4/12/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2005 | | |
|
|
|
|
Print Occupancy Form | | | 4/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/8/2005 | | 4/11/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 2/24/2005 | | 4/11/2005 | | PASS |
|
|
|
4/11/2005 08:43:52 JCM - activity updated through activity BLDA022 from case BLD05-00439.
|
Routing - FIRE | 4/4/2005 | | 4/8/2005 | | PASS |
|
|
|
resubmittal acceptable
|
Plan resubmittals received | | | 4/7/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Copys of sheets A2.0,A2.0F,A6.0,A8.1 Taken to John M.
|
Routing - PLAN CHECK | 3/23/2005 | | 4/4/2005 | | |
|
|
|
|
Plan resubmittals received | | | 4/3/2005 | | DONE |
|
|
|
Received Transmittal Letter, Building Fire Code Review,& 3 Copys of sheet C1.1 Taken to John M.
|
Plan Reviewer's activity | | | 3/30/2005 | | DONE |
|
|
|
Forwarded the alternate letter to George Slane, Building Official, to determine if acceptable. JCM
|
Plan resubmittals received | | | 3/30/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to John M.: 1 copy of cover transmittal, structural review comment responses, column calcs, geotech report; and 3 copies of plan sheets S1.2, S2.1, and S3.2.
|
Plan Reviewer's activity | | | 3/30/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted structural plan resubmittals. JCM
|
Plan resubmittals received | | | 3/28/2005 | | |
|
|
|
Received a letter from the Idaho Central Credit Union President, requesting an alternate for the requirement of an accessible teller service counter. JCM
|
1st review completed | | | 3/23/2005 | | FAIL |
|
|
|
failed structural, plan check and Fire.
|
Routing - FIRE | 3/17/2005 | | 3/23/2005 | | FAIL |
|
|
|
lacks adequate hydrants. Review faxed to architect.
|
Plan resubmittals requested | | | 3/17/2005 | | DONE |
|
|
|
Mailed the architect a copy of the plan review requesting one revision. JCM
|
Routing - PLAN CHECK | 3/14/2005 | | 3/17/2005 | | FAIL |
|
|
|
|
Routing - PLANNING | 3/9/2005 | | 3/11/2005 | | PASS |
|
|
|
Sara S. DRH04-00297 - Approved per DRH04-00297. I passed the documents on to Carl M. on 3/10/05
Carl M. CUP04-00084. Approved on 3/11/2005
|
Routing - PLUMBING | 3/8/2005 | | 3/9/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 3/7/2005 | | 3/8/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing Off Site - STRUCTURAL | 2/24/2005 | | 3/7/2005 | | FAIL |
|
|
|
Called PDQ for pick up. - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 2/25/2005 | | 3/7/2005 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 3/7/2005 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING Land Div | 2/24/2005 | | 2/25/2005 | | PASS |
|
|
|
Parcel A of ROS 3105.
|
Plan routing begun/NEW & ADDTN | | | 2/24/2005 | | |
|
|
|
|
(F) Reprint permit | | | 2/24/2005 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/24/2005 | | |
|
|
|
Envelope Comp ?
|
Application received | | | 2/22/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/22/2005 | | |
|
|
|
|
VOIDED CHANGE STATUS | | | 2/22/2005 | | DONE |
|
|
|
void permit incomplete plans
|
CHANGE STATUS TO (PND) | | | 2/22/2005 | | DONE |
|
|
|
changed status has new info to re-submit
|
Fee Review-notes | 2/22/2005 | 2/22/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
John M.
|