Permit Information
Permit NumberBLD05-00439
StatusFinaled
Name IDAHO CENTRAL CREDIT UNION
Site Address 6328 W STATE ST
Project NameIDAHO CENTRAL CREDIT UNION
Customer Number 
ePlanReviewNo
Description
Idaho Central Credit Union - To construct a new 5,740 square foot, one story, wood framed, credit union office building with roof covered drive-thru and related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/9/2016 DONE
Third Notice BLD12/7/200512/7/200512/23/2005 DONE
Second Notice has not been responded to.
Second Notice 10/10/200512/7/2005 DONE
First Notice 9/29/200510/10/2005 DONE
BLD-Final9/28/20059/29/20059/29/2005APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 9/28/2005 at 12:58:22 PM. Contact: ###-####.
ok for perm. c of o
Permanent Occupancy 9/29/20059/29/2005 DONE
Details
Permanent occupancy  9/29/2005 DONE
Perm. Occ. Cert. # 10751 issued 9-29-05 to the Idaho Central Credit Union.
PubWorks Occupancy Approval9/20/20059/20/20059/20/2005 DONE
Drainage project complete, signed permanent occupancy 9/20/05. M.Strasser
BLD-Final9/15/20059/16/20059/16/2005APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/15/2005 at 3:57:56 PM. Contact: ###-####. pending elec approval
FIRE-Final Inspection9/14/20059/15/20059/15/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
Code Occupancy Approval9/15/20059/15/20059/15/2005APASS
DetailsWm. Michael Meloy
Compliance met.
FIRE-Conference8/29/20058/30/20058/31/2005PDONE
DetailsForrest France
On site discussion with Tom from CM company regarding fire lane curb painting.
BLD-Other8/10/20058/11/20058/11/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/10/2005 at 5:00:56 PM. Contact: ###-####.
ceiling grid ok, pending trades
FIRE-Conference8/1/20058/2/20058/2/2005PDONE
DetailsTroy Cobbley
The exit light out of the west exit door needs to be lowered to be viewabel from below the soffit or an additional exit sign will need to be provided in the lower ceiling.
BLD-Framing/Rough-in6/29/20056/30/20056/30/2005APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/29/2005 at 10:12:51 AM. Contact: ###-####.
BLD-Framing/Rough-in6/24/20056/24/20056/27/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/24/2005 at 7:08:58 AM. Contact: ###-####.steel stud framing int ok need to fire stop wood ext walls ok to insulate
BLD-Framing/Rough-in6/15/20056/16/20056/16/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/15/2005 at 10:54:30 AM. Contact: ###-####.
roof and exterior shear/brace ok to cover
BLD-Concrete5/19/20055/19/20055/19/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/19/2005 at 9:34:40 AM. Contact: ###-####.
pend s. i. 5/20/2005 9:58:10 AM
BLD-Concrete5/16/20055/17/20055/17/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/16/2005 at 12:51:22 PM.
pending si report 5/17/2005 1:27:56 PM
BLD-Footing5/9/20055/10/20055/10/2005APART
DetailsTony Young
tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pend s i 5/10/2005 3:20:47 PM
BLD-Footing5/5/20055/6/20055/6/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/5/2005 at 3:37:17 PM. Contact: ###-####.
portion of west ftg 5/6/2005 10:39:32 AM
BLD-Footing5/6/20055/6/20055/6/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/5/2005 at 3:37:17 PM. Contact: ###-####.
canopy tfgs,, pending s. i. report 5/9/2005 8:10:20 AM
BLD-Foundation5/2/20055/3/20055/3/2005APART
DetailsTony Young
tom pallsen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pend. si ,,,, point load ftgs,, and part of wall 5/3/2005 10:33:13 AM
Plan resubmittals received  5/3/2005 DONE
Received Transmittal & 2 Copys of sheet C1.1 Taken to John M.
BLD-Footing4/27/20054/28/20054/28/2005APART
DetailsTony Young
TOM; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pending s. i. report,,,wip 4/28/2005 12:51:17 PM
BLD-Footing4/25/20054/26/20054/26/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 4/25/2005 at 2:12:18 PM. Contact: ###-####.
east part of ftg,, pending S. I. report 4/26/2005 10:22:59 AM
(F) Reprint permit  4/14/2005  
Telephone call  4/13/2005 DONE
left mess for steve christensen at ###-#### or pam walker that permit is ready & need achd
Issue PAID IN FULL permit  4/13/2005 DONE
OVERRIDE  4/12/2005  
Inspection Record Card- Bld  4/12/2005  
Print Occupancy Form  4/12/2005 DONE
Permit Ready to Issue  4/12/2005 DONE
Routing - PLAN CHECK4/8/2005 4/11/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/11/2005 DONE
Plan assigned to (JCM)2/24/2005 4/11/2005 PASS
4/11/2005 08:43:52 JCM - activity updated through activity BLDA022 from case BLD05-00439.
Routing - FIRE4/4/2005 4/8/2005 PASS
resubmittal acceptable
Plan resubmittals received  4/7/2005 DONE
Received Transmittal Letter, & 3 Copys of sheets A2.0,A2.0F,A6.0,A8.1 Taken to John M.
Routing - PLAN CHECK3/23/2005 4/4/2005  
Plan resubmittals received  4/3/2005 DONE
Received Transmittal Letter, Building Fire Code Review,& 3 Copys of sheet C1.1 Taken to John M.
Plan Reviewer's activity  3/30/2005 DONE
Forwarded the alternate letter to George Slane, Building Official, to determine if acceptable. JCM
Plan resubmittals received  3/30/2005 DONE
Resubmittals received and forwarded to John M.: 1 copy of cover transmittal, structural review comment responses, column calcs, geotech report; and 3 copies of plan sheets S1.2, S2.1, and S3.2.
Plan Reviewer's activity  3/30/2005 PASS
Reviewed and approved resubmitted structural plan resubmittals. JCM
Plan resubmittals received  3/28/2005  
Received a letter from the Idaho Central Credit Union President, requesting an alternate for the requirement of an accessible teller service counter. JCM
1st review completed  3/23/2005 FAIL
failed structural, plan check and Fire.
Routing - FIRE3/17/2005 3/23/2005 FAIL
lacks adequate hydrants. Review faxed to architect.
Plan resubmittals requested  3/17/2005 DONE
Mailed the architect a copy of the plan review requesting one revision. JCM
Routing - PLAN CHECK3/14/2005 3/17/2005 FAIL
Routing - PLANNING3/9/2005 3/11/2005 PASS
Sara S. DRH04-00297 - Approved per DRH04-00297. I passed the documents on to Carl M. on 3/10/05

Carl M. CUP04-00084. Approved on 3/11/2005
Routing - PLUMBING3/8/2005 3/9/2005 PASS
per plans and 2003 upc
Routing - Erosion and Sediment3/7/2005 3/8/2005 PASS
ESC plan approved with attached conditions.
Routing Off Site - STRUCTURAL2/24/2005 3/7/2005 FAIL
Called PDQ for pick up. - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS2/25/2005 3/7/2005 PASS
Plan resubmittals requested  3/7/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING Land Div2/24/2005 2/25/2005 PASS
Parcel A of ROS 3105.
Plan routing begun/NEW & ADDTN  2/24/2005  
(F) Reprint permit  2/24/2005 DONE
Plans ACCEPTED BY PLAN TECH  2/24/2005  
Envelope Comp ?
Application received  2/22/2005  
Recd Pcfee & Taken To Pln CK  2/22/2005  
VOIDED CHANGE STATUS  2/22/2005 DONE
void permit incomplete plans
CHANGE STATUS TO (PND)  2/22/2005 DONE
changed status has new info to re-submit
Fee Review-notes2/22/20052/22/2005   
Routing - PLAN CHECK     
John M.