Third Notice BLD | 3/1/2006 | 3/1/2006 | 11/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 4/10/2007 | | DONE |
|
|
|
Call to Jordan _Wilcomb, lft msg for Russ to call back re cert of FV
|
Second Notice BLD | 2/3/2006 | 2/3/2006 | 3/1/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/18/2006 | 2/3/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/18/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10873 issued 1-18-06 to Dr. Michael Bailey.
|
Permanent Occupancy | | 1/12/2006 | 1/12/2006 | | DONE |
|
|
|
|
BLD-Final | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
BLD-Final | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete
|
Telephone call | | | 10/20/2005 | | DONE |
|
|
|
Talked w/Tim Wilcomb re: status of temp. occ. and he will write a letter requesting extension.
|
BLD-Final | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ needs other trades to sign off perm
|
FIRE-Final Inspection | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PART |
Forrest France
|
|
|
Temp. occupancy granted per Steve Keuter pending relocation of wall mounted strobe devices to the correct height AFF.
|
Temporary occupancy | | | 7/25/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5260 issued 7-25-05 to Dr. Michael Bailey.
|
FIRE-Final Inspection | 7/22/2005 | 7/22/2005 | 7/22/2005 | P | PART |
Forrest France
|
|
|
Final pending sign-off of fire alarm and fire sprinkler permits, all other life safety issues are satisfactory.
|
FIRE-Final Inspection | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | FAIL |
Forrest France
|
|
|
Provide approved hardware at pocket door to office 102, provide door closer and seal at medical gas storage closet as instructed on review notes, provide suite or space identification.
|
FIRE-Alarm Testing | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | CANC |
Forrest France
|
|
|
Duplicate inspection.
|
FIRE-Final Inspection | 7/19/2005 | 7/21/2005 | 7/21/2005 | A | FAIL |
Forrest France
|
|
|
Emergency lighting and exit signs failed to operate under backup power, no other life safety issues inspected at this time. Contractor to re-schedule when ready.
|
Case Summary (BLD) | | | 7/8/2005 | | |
|
|
|
|
BLD-Conference | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid conf
|
BLD-Framing/Rough-in | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | PART |
Dave Hannah
|
|
|
prior to 3 please or wed am////mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover
|
BLD-Framing/Rough-in | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover one side need all holes in floors fire safted
|
Issue PAID IN FULL permit | | | 4/29/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/28/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/28/2005 | | |
|
|
|
|
Telephone call | | | 4/28/2005 | | DONE |
|
|
|
left mess for tim wilcomb at ###-#### is ready
|
Plan assigned to (JCB) | 3/1/2005 | | 4/27/2005 | | PASS |
|
|
|
4/27/2005 16:01:37 JCB - activity updated through activity BLDA022 from case BLD05-00463.
|
Routing - FIRE | 4/25/2005 | | 4/27/2005 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 4/27/2005 | | 4/27/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 4/18/2005 | | 4/25/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 3/25/2005 | | 4/18/2005 | | PEND |
|
|
|
When approved by Plumbing and the Fire Dept. permit can be issued. Plans to route to these divisions.
|
Telephone call | | | 4/15/2005 | | DONE |
|
|
|
Called Brad Marczuk of Larson Architects to discuss and clarify a few minor items. These will be red-lined on the resubmittal sheets.
|
Plan resubmittals received | | | 4/14/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Copys of sheets A-1,A-2,A-3,L-1,M-1,M-4,P-1,P-2,E2.1L Taken to Jason B.
|
1st review completed | | | 3/25/2005 | | FAIL |
|
|
|
failed plumbing, plan check and fire.
|
Routing - FIRE | 3/17/2005 | | 3/25/2005 | | FAIL |
|
|
|
additional med gas info required. Review faxed to architect.
|
Routing - PLAN CHECK | 3/8/2005 | | 3/17/2005 | | FAIL |
|
|
|
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
|
Plan resubmittals requested | | | 3/17/2005 | | DONE |
|
|
|
Plan resubmittals and written response required for further review.
|
Plan resubmittals received | | | 3/11/2005 | | DONE |
|
|
|
Received Transmittal Letter,1 Letter, & 3 Copys of sheet P-2 Taken to Jason B.
|
Routing - PLUMBING | 3/2/2005 | | 3/8/2005 | | FAIL |
|
|
|
pipe potable water to all fixtures, r.p.s on hot and cold water to exam room sinks are not required, replace with smaller protection at any equipment that requires protection, water feature etc.. 120 deg. max. hot water to public lavs, please resubmit P-2.
|
Routing - PUBLIC WORKS | 3/1/2005 | | 3/2/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2005 | | |
|
|
|
|
Application received | | | 2/24/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/24/2005 | | |
|
|
|
|
Fee Review-notes | 2/24/2005 | 2/24/2005 | | | |
|
|
|
|