Third Notice BLD | 1/20/2006 | 1/20/2006 | 1/20/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 12/6/2005 | 1/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2006 | | DONE |
|
|
|
Left voice message for Meagan needing the final values information back @ 3:00pm on 1/12/06 BAS
|
Telephone call | | | 1/10/2006 | | DONE |
|
|
|
Left a message for Meagan at HighPoint to send back the final value form completed///1/10/06 @ 2:35pm BAS
|
First Notice | | 5/5/2005 | 9/19/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 5/5/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10568 issued 5-4-05 to Small Smiles of Boise.
|
Permanent Occupancy | | 5/4/2005 | 5/4/2005 | | DONE |
|
|
|
|
BLD-Final | 5/2/2005 | 5/2/2005 | 5/2/2005 | P | PASS |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. 5/4/2005 10:43:53 AM
|
FIRE-Final Inspection | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 4/29/2005 | 4/29/2005 | 4/29/2005 | P | PART |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Temp Occ. OK for Perm when Plumbing perm OKd. 4/29/2005 2:22:37 PM
|
BLD-Framing/Rough-in | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PART |
Jim Sly
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grid OK 4/25/2005 4:52:46 PM
|
BLD-Framing/Rough-in | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | NR |
Jim Sly
|
|
|
suspended ceiling inspecion please///tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4/22/2005 4:31:05 PM
|
BLD-Framing/Rough-in | 4/19/2005 | 4/20/2005 | 4/20/2005 | A | PART |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 1hr fire barrier walls re-worked to extend to roof deck per scope of work. OK 4/20/2005 11:03:02 AM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PART |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Checked selected part of 1hr walls for cover. 4/14/2005 12:48:16 PM
|
BLD-Conference | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PART |
Jim Sly
|
|
|
Tom hazel -- ###-#### All walls exept for rated wall OK Need to re-inspect rated walls. 4/6/2005 4:08:10 PM
|
Issue PAID IN FULL permit | | | 4/6/2005 | | |
|
|
|
|
Plan assigned to (JCB) | 3/1/2005 | | 4/5/2005 | | PASS |
|
|
|
4/5/2005 11:12:14 JCB - activity updated through activity BLDA022 from case BLD05-00470.
|
Routing - PLUMBING | 4/1/2005 | | 4/5/2005 | | PASS |
|
|
|
Route to Fire after plumbing review. needs thermol expantion protection. med gas piping shall be cleaned and capped by the factory and shall be ASTM B 819 medical gas tube. OXY, MED, ACR/MED, etc. additional cross connection protection may be required.
|
Routing - FIRE | 4/5/2005 | | 4/5/2005 | | PASS |
|
|
|
resubmittal acceptable
|
Routing - PLAN CHECK | 4/5/2005 | | 4/5/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2005 | | DONE |
|
|
|
left mess for todd cruse at ###-#### is ready
|
Permit Ready to Issue | | | 4/5/2005 | | |
|
|
|
|
Telephone call | | | 4/5/2005 | | DONE |
|
|
|
left mess for todd cruse at ###-#### is ready
|
Routing - PLAN CHECK | 3/24/2005 | | 4/1/2005 | | PEND |
|
|
|
When approved by Plumbing and Fire Dept. permit can be issued. Plans to route to these divisions for review of resubmittal drawings.
|
Plan resubmittals received | | | 3/31/2005 | | DONE |
|
|
|
Received transmittal letter with written response to plan reivew report, copy of letter of complicance, written response to fire code review, two copies of supplemental TJL load calculations,two copies HVAC calculations, two sets of sheets C,A1,A2,A3,A4,A5,A6,P1,P2,P3,P4,M1,M2,M3,E1,E2,E3, taken to Jason B.rad
|
1st review completed | | | 3/24/2005 | | FAIL |
|
|
|
failed plumbing, plan check and fire.
|
Routing - FIRE | 3/23/2005 | | 3/24/2005 | | FAIL |
|
|
|
lacks fire extinguisher locations. Review faxed to architect.
|
Routing - Erosion and Sediment | 3/22/2005 | | 3/23/2005 | | PASS |
|
|
|
ESC plan waiver approved with attached conditions.
|
Plan resubmittals requested | | | 3/22/2005 | | DONE |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 3/8/2005 | | 3/22/2005 | | FAIL |
|
|
|
Plan review sent and faxed to architect. Copy also faxed to owner. Plan resubmittals and written response required for further review. Plans to route to Erosion/Sediment Control and then to Fire Dept. for review.
|
Plan resubmittals received | | | 3/17/2005 | | DONE |
|
|
|
Two copies of resubmittal sheet A6 received.
|
Plan resubmittals received | | | 3/15/2005 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets P3,P4 Taken to Jason B.
|
Plan Reviewer's activity | | | 3/9/2005 | | DONE |
|
|
|
PARTIAL PERMIT ISSUED 3/9/05 to allow rough in of elect., plumbing, hvac per Resolution 13535. No framing allowed until full permit is issued.
|
Early Start Permit | | | 3/9/2005 | | DONE |
|
|
|
|
Routing - PLUMBING | 3/3/2005 | | 3/8/2005 | | FAIL |
|
|
|
resubmit a menical gas and vacuum plan meeting requirements of the UPC or NFPA 99C. revise notes on P-4. provide information on all equipment, DU, SD, XP, what type of hand pieces will be used etc, to determine sizing and protection of the water supply etc. size all med gas piping, provide details of all equipment hookup, required valving ans sensors.
|
Routing - PUBLIC WORKS | 3/2/2005 | | 3/3/2005 | | PASS |
|
|
|
|
Application received | | | 2/24/2005 | | |
|
|
|
|
Fee Review-notes | 2/24/2005 | 2/24/2005 | | | |
|
|
|
|