Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00470
StatusFinaled
Name HIGH POINT
Site Address 8740 W FAIRVIEW AVE
Project NameFAIRVIEW TECH CENTER
Customer Number 
ePlanReviewNo
Description
(SMALL SMILES OF BOISE LLC)(FAIRVIEW TECH CENTER) Remodel to construct a new 11,332 sq. ft. dental clinic in an existing 69,561 sq. ft. building per approved plans. The lobby/waiting area is an assembly occupancy. Work to include some miscellaneous demolition work, new one-hour rated fire barrier walls to roof deck, new interior walls, two one-hour rated doors, new interior doors and windows, interior finish, new suspended ceiling system, new cabinets/counters and sinks, new accessible restrooms, fire sprinkler work including new quick-response heads throughout the space, new mechanical including new HVAC rooftop units with new structural supports per engineering, new plumbing, and new electrical work. Separated Uses per IBC Section 302.3.2 between tenant spaces within the building. Nonseparated Uses per IBC Section 302.3.1 between occupancies within the tenant space. This tenant has one-hour rated fire barrier walls on the east and the west and there is an existing 4-hour fire wall to the north. Architect has also specified a one-hour rated medical gas room and one-hour rated mechanical room. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase and allows non-rated corridors in the space, one-third the overall diagonal for exit separation, does not require draftstopping, and allows the fire barrier walls to be reduced to a one-hour rating. JCB App fees were paid on BLD05-00331 in the amount of $2,609.57 on 2/14/05 BAS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/20/20061/20/20061/20/2006 DONE
Second Notice has not been responded to.
Second Notice 12/6/20051/20/2006 DONE
Telephone call  1/12/2006 DONE
Left voice message for Meagan needing the final values information back @ 3:00pm on 1/12/06 BAS
Telephone call  1/10/2006 DONE
Left a message for Meagan at HighPoint to send back the final value form completed///1/10/06 @ 2:35pm BAS
First Notice 5/5/20059/19/2005 DONE
Permanent occupancy UNPAID FEE  5/5/2005 DONE
Perm. Occ. Cert. # 10568 issued 5-4-05 to Small Smiles of Boise.
Permanent Occupancy 5/4/20055/4/2005 DONE
Details
BLD-Final5/2/20055/2/20055/2/2005PPASS
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. 5/4/2005 10:43:53 AM
FIRE-Final Inspection4/28/20054/29/20054/29/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final4/29/20054/29/20054/29/2005PPART
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Temp Occ. OK for Perm when Plumbing perm OKd. 4/29/2005 2:22:37 PM
BLD-Framing/Rough-in4/25/20054/25/20054/25/2005PPART
DetailsJim Sly
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grid OK 4/25/2005 4:52:46 PM
BLD-Framing/Rough-in4/22/20054/22/20054/22/2005PNR
DetailsJim Sly
suspended ceiling inspecion please///tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4/22/2005 4:31:05 PM
BLD-Framing/Rough-in4/19/20054/20/20054/20/2005APART
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 1hr fire barrier walls re-worked to extend to roof deck per scope of work. OK 4/20/2005 11:03:02 AM
BLD-Framing/Rough-in4/14/20054/14/20054/14/2005PPART
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Checked selected part of 1hr walls for cover. 4/14/2005 12:48:16 PM
BLD-Conference4/12/20054/12/20054/12/2005PPASS
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in4/6/20054/6/20054/6/2005PPART
DetailsJim Sly
Tom hazel -- ###-#### All walls exept for rated wall OK Need to re-inspect rated walls. 4/6/2005 4:08:10 PM
Issue PAID IN FULL permit  4/6/2005  
Plan assigned to (JCB)3/1/2005 4/5/2005 PASS
4/5/2005 11:12:14 JCB - activity updated through activity BLDA022 from case BLD05-00470.
Routing - PLUMBING4/1/2005 4/5/2005 PASS
Route to Fire after plumbing review. needs thermol expantion protection. med gas piping shall be cleaned and capped by the factory and shall be ASTM B 819 medical gas tube. OXY, MED, ACR/MED, etc. additional cross connection protection may be required.
Routing - FIRE4/5/2005 4/5/2005 PASS
resubmittal acceptable
Routing - PLAN CHECK4/5/2005 4/5/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  4/5/2005 PASS
Inspection Record Card- Bld  4/5/2005 DONE
Print Occupancy Form  4/5/2005 DONE
Telephone call  4/5/2005 DONE
left mess for todd cruse at ###-#### is ready
Permit Ready to Issue  4/5/2005  
Telephone call  4/5/2005 DONE
left mess for todd cruse at ###-#### is ready
Routing - PLAN CHECK3/24/2005 4/1/2005 PEND
When approved by Plumbing and Fire Dept. permit can be issued. Plans to route to these divisions for review of resubmittal drawings.
Plan resubmittals received  3/31/2005 DONE
Received transmittal letter with written response to plan reivew report, copy of letter of complicance, written response to fire code review, two copies of supplemental TJL load calculations,two copies HVAC calculations, two sets of sheets C,A1,A2,A3,A4,A5,A6,P1,P2,P3,P4,M1,M2,M3,E1,E2,E3, taken to Jason B.rad
1st review completed  3/24/2005 FAIL
failed plumbing, plan check and fire.
Routing - FIRE3/23/2005 3/24/2005 FAIL
lacks fire extinguisher locations. Review faxed to architect.
Routing - Erosion and Sediment3/22/2005 3/23/2005 PASS
ESC plan waiver approved with attached conditions.
Plan resubmittals requested  3/22/2005 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK3/8/2005 3/22/2005 FAIL
Plan review sent and faxed to architect. Copy also faxed to owner. Plan resubmittals and written response required for further review. Plans to route to Erosion/Sediment Control and then to Fire Dept. for review.
Plan resubmittals received  3/17/2005 DONE
Two copies of resubmittal sheet A6 received.
Plan resubmittals received  3/15/2005 DONE
Received Transmittal Letter, & 2 Copys of sheets P3,P4 Taken to Jason B.
Plan Reviewer's activity  3/9/2005 DONE
PARTIAL PERMIT ISSUED 3/9/05 to allow rough in of elect., plumbing, hvac per Resolution 13535. No framing allowed until full permit is issued.
Early Start Permit  3/9/2005 DONE
Routing - PLUMBING3/3/2005 3/8/2005 FAIL
resubmit a menical gas and vacuum plan meeting requirements of the UPC or NFPA 99C. revise notes on P-4. provide information on all equipment, DU, SD, XP, what type of hand pieces will be used etc, to determine sizing and protection of the water supply etc. size all med gas piping, provide details of all equipment hookup, required valving ans sensors.
Routing - PUBLIC WORKS3/2/2005 3/3/2005 PASS
Application received  2/24/2005  
Fee Review-notes2/24/20052/24/2005