Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00476
StatusFinaled
Name EM CONSTRUCTION
Site Address 5201 N BROOKFIELD PL
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a three bedroom, two and half bathroom 3293 sq. ft. two story single family dwelling (2088 sq. ft. first floor/1205 sq. ft. second floor) with a attached 856 sq. ft. three car garage and a 70 sq. ft. covered back porch. Per approved plans and requirement list. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/6/200510/6/200510/6/2005PPASS
DetailsJim Sly
musphfa; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/C issued.
DOC - Permit Finaled10/6/200510/6/200510/6/2005PPASS
DetailsJim Sly
C/C issued
BLD-Framing/Rough-in7/11/20057/11/20057/11/2005PPASS
DetailsJim Sly
mustafa; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Frame and energy code OK
BLD-Framing/Rough-in7/6/20057/7/20057/7/2005AFAIL
DetailsJim Sly
mustafa; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Complete corrections Do not cover
BLD-Framing/Rough-in7/1/20057/1/20057/1/2005PFAIL
DetailsJim Sly
muspasi; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/N posted
BLD-Framing/Rough-in6/27/20056/27/20056/27/2005PNR
DetailsTom Arcoraci
muspha; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs all rough in inspections
BLD-Foundation4/1/20054/4/20054/4/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/1/2005 at 7:00:37 AM. Contact: ###-####.
BLD-Foundation4/4/20054/4/20054/4/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/4/2005 at 11:27:43 AM. Contact: ###-####.
BLD-Footing4/1/20054/1/20054/1/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/1/2005 at 7:00:15 AM. Contact: ###-####.
Permit Ready to Issue  3/29/2005  
Issue PAID IN FULL permit  3/29/2005 DONE
Permit Ready to Issue  3/25/2005  
Inspection Record Card- Bld  3/25/2005  
Telephone call  3/25/2005 DONE
left mess that permit is ready
Case Summary (BLD)  3/24/2005  
PLANS/APPL TAKEN TO FRONT DESK  3/24/2005 DONE
Routing - PLAN CHECK2/25/2005 3/24/2005 PASS
Plan assigned to (SAM)3/17/2005 3/24/2005 PASS
3/24/2005 15:51:16 SAM - activity updated through activity BLDA022 from case BLD05-00476.
Plan Reviewer's activity  3/17/2005 DONE
0917 I called and left a message for Mustafa to call me. I need a roof framing plan and I have beam questions. Plans are on hold till I get the information.
Routing - PLANNING2/25/2005 2/25/2005 PASS
Routing - PUBLIC WORKS2/25/2005 2/25/2005 PASS
Application received  2/25/2005