Third Notice BLD | 6/14/2006 | 6/14/2006 | 4/13/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 2/2/2007 | | DONE |
|
|
|
lft vm with duane marlene about the final values - one last time! 2:30 pm
|
Telephone call | | | 2/2/2007 | | DONE |
|
|
|
lft vm with joey at anton ###-#### regarding final value for airport
|
Telephone call | | | 8/29/2006 | | DONE |
|
|
|
tlk to duane ###-#### about the final value 8/29/2006 4:20 pm
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/17/2006 | 5/25/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/17/2006 | 4/17/2006 | 4/17/2006 | | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | 4/17/2006 | 4/17/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/17/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10981 issued 4-17-06 to the Boise Varsity Bar & Grille at the airport.
|
BLD-Aging Inspection | 2/14/2006 | 2/14/2006 | 2/16/2006 | P | NR |
Forrest France
|
|
|
Final pending completion of the concourse fire alarm upgrade to be inspected next month per conversation with contractor.
|
BLD-Aging Inspection | 2/14/2006 | 2/14/2006 | 2/14/2006 | | DEFR |
Jim Storey
|
|
|
to fire
|
BLD-Aging Inspection | 12/14/2005 | 12/14/2005 | 12/14/2005 | | NR |
Jim Storey
|
|
|
pending fire.
|
BLD-Final | 10/13/2005 | 10/14/2005 | 10/14/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/13/2005 at 1:10:27 PM. Contact: ###-####.temp ok plendig health sign off.
|
Temporary occupancy | | | 10/14/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5286 issued 10-14-05 to the Boise Varsity Bar & Grille.
|
FIRE-Final Inspection | 10/12/2005 | 10/13/2005 | 10/13/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Sam Rogers permission. The temp was given on the fire alarm system in the tenant space which is to be changed out to a new system with the concouse alarm upgrade. Sound levels on when the alarm was activated did not meet the 15db above ambient as per code. Life safety can be finaled when the alarm permit is finaled. I could not make "temporary" under the fire alarm permit since it is in the "review" status.
|
FIRE-Final Inspection | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | FAIL |
Troy Cobbley
|
|
|
Mount max occupant load sign, Provide approved door hardware for "Store 105", provide verification of the cd rating of the temporary strobes so proper coverage can be verified and then test in the presence of the inspector. If this is done a temporary occupancy can be given by Sam Rogers permission
|
BLD-Final | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2005 at 11:38:55 AM. Contact: ###-####.
|
BLD-Final | 10/7/2005 | 10/7/2005 | 10/10/2005 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/7/2005 at 8:31:44 AM. Contact: ###-####.
|
BLD-Final | 10/7/2005 | 10/10/2005 | 10/10/2005 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/7/2005 at 5:49:43 PM. Contact: ###-####.
|
FIRE-Alarm Testing | 10/7/2005 | 10/7/2005 | 10/7/2005 | P | FAIL |
Forrest France
|
|
|
Provide fire ext. with current inspection tag, provide max occupant load sign, relocate K class extinguisher as discussed, need to final fire sprinkler permit prior to bld final.
|
BLD-Framing/Rough-in | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PART |
Jim Storey
|
|
|
framing ok / need finsh welds at weld plats and justify truss loading.
|
BLD-Framing/Rough-in | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 8:04:20 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 7/5/2005 | | |
|
|
|
|
Telephone call | | | 5/17/2005 | | DONE |
|
|
|
called left voice message for jeffrey langan and sandy murphy permit is ready and fees
|
Plan assigned to (CJW) | 3/4/2005 | | 4/6/2005 | | PASS |
|
|
|
4/6/2005 11:05:56 CJW - activity updated through activity BLDA022 from case BLD05-00487.
|
Routing - PLAN CHECK | 3/25/2005 | | 4/6/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/6/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/6/2005 | | DONE |
|
|
|
talked to sandy murphey at ###-#### is ready & jeffrey langan at ###-####
|
Plan Reviewer's activity | | | 4/5/2005 | | DONE |
|
|
|
Submitted alternate approved by George Slane.
|
Plan resubmittals received | | | 4/1/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to Carl: 2 copies of response letter from architect and 3 copies of plan sheets A0.1, A0.2, D1.1, A1.1, A2.1, A3.1, A4.1, A5.1, A6.1, A7.1, A8.1, A9.1, /a10.1, M0.1, M0.2, M1.1, M2.1, M4.1, M5.1, P01., P1.1, P1.2, P2.1, P2.2, P4.1, P5.1, E0.1, E0.2, E1.1 and E2.1.
|
Routing - FIRE | 3/18/2005 | | 3/25/2005 | | PASS |
|
|
|
|
1st review completed | | | 3/25/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 3/8/2005 | | 3/18/2005 | | FAIL |
|
|
|
The IBC plan review was started on March 17, 2005 and was finished the next day. Resubmitted drawings were required. See the plan review report.
|
Routing - PLUMBING | 3/7/2005 | | 3/8/2005 | | PASS |
|
|
|
120 deg. max. hot water to all public lavs. r.p. in ceiling space- 5' max above finish floor. provide water supply to chemical system at the mop sink. install r.p. backflow preventors over a floor sink.
|
Routing - PUBLIC WORKS | 3/4/2005 | | 3/7/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/1/2005 | | |
|
|
|
|
Application received | | | 2/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2005 | | DONE |
|
|
|
|
Fee Review-notes | 2/25/2005 | 2/25/2005 | | | |
|
|
|
|