Third Notice BLD | 4/14/2006 | 4/14/2006 | 8/8/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/29/2006 | 3/29/2006 | 4/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/14/2006 | 3/14/2006 | 3/29/2006 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 3/13/2006 | 3/13/2006 | 3/14/2006 | P | PASS |
Dave Hannah
|
|
|
late pm please//jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 3/10/2006 | 3/13/2006 | 3/13/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Letter of compliance | | | 3/13/2006 | | DONE |
|
|
|
Letter of Compliance issued 3-13-06.
|
FIRE-Final Inspection | 2/27/2006 | 3/1/2006 | 3/1/2006 | P | NR |
Forrest France
|
|
|
Inspection to be rescheduled as work is not ready per contractor.
|
BLD-Conference | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | PASS |
Dave Hannah
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to bld arc popuots around two oors on parking lot side
|
BLD-Other | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/22/2005 at 8:16:20 AM. Contact: ###-####. ceiling grid ok
|
Case Summary (BLD) | | | 12/15/2005 | | |
|
|
|
|
BLD-Footing | 9/29/2005 | 10/3/2005 | 10/3/2005 | A | PART |
Tony Young
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles lower portion of block wall,, cmu,, about 30"
|
BLD-Footing | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/26/2005 at 12:52:55 PM. Contact: ###-####. ftfor wall along ally ok to pourg
|
BLD-Other | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | CANC |
Dave Hannah
|
|
|
jay Note: trench; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Print permit w/o conditions | | | 9/21/2005 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/2/2005 | 9/6/2005 | 9/6/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/2/2005 at 11:50:46 AM. Contact: ###-####.int lobby ok to cover and stair areas
|
BLD-Framing/Rough-in | 8/10/2005 | 8/15/2005 | 8/15/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 11:09:05 AM. Contact: ###-####. ok to cover ext also shell int and trusses are ok
|
Plan resubmittals received | | | 8/15/2005 | | DONE |
|
|
|
Received 1 Transmittal Letter, 1 ES Report Taken to JohnM. Permit issued 4-26-05
|
BLD-Footing | 6/10/2005 | 6/10/2005 | 6/10/2005 | P | PASS |
Dave Hannah
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore elevator and column pads ok to pour
|
BLD-Foundation | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | NR |
Tony Young
|
|
|
foundation wall inspection///donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PART |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front area ok to pour
|
BLD-Footing | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
(F) Reprint permit | | | 4/27/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2005 | | DONE |
|
|
|
called left voicemail for Trent permit is ready 4/20/05 3:47pm
|
Routing - Erosion and Sediment | 4/19/2005 | | 4/19/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions. Narrative under BLD05-00490
|
Routing - PLAN CHECK | 3/30/2005 | | 3/31/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/31/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/31/2005 | | |
|
|
|
|
Telephone call | | | 3/31/2005 | | DONE |
|
|
|
left mess for trent at ###-#### to verify plans are ready
|
Plan assigned to (JCM) | 3/4/2005 | | 3/31/2005 | | PASS |
|
|
|
3/31/2005 08:11:58 JCM - activity updated through activity BLDA022 from case BLD05-00489.
|
Routing - FIRE | 3/25/2005 | | 3/30/2005 | | PASS |
|
|
|
revised plans acceptable. Review comments faxed to architect and called architect and discussed.
|
1st review completed | | | 3/25/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Plan resubmittals received | | | 3/25/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to John: 2 copies of plan sheets SD-1, A-1.1, A-1.2, A-4.1, E0.2, Horizontal Control Plan, and Site Utility Plan.
|
Routing - PLAN CHECK | 3/25/2005 | | 3/25/2005 | | PASS |
|
|
|
Reviewed and approved resubmittals. JCM
|
Routing - FIRE | 3/18/2005 | | 3/25/2005 | | FAIL |
|
|
|
review on hold awaiting revised civil drawings to reflect modified hydrant location and AS main location; per architect, T. Koci expect to resubmit within next day or two.
|
Meeting | | | 3/22/2005 | | DONE |
|
|
|
Meeting with architect, T. Koci, civil engr and owner to discussed modified hydrant location due to >$30,000 bid to pipe cross State St to original proposed hydrant location. Agreed to new hydrant location near intersection of 27th and State so as to come off 12" cwm in 27th St. This will also modify the proposed AS main connection to come off 27th St instead of State St. Hold plan review until revised civil plans are resubmitted.
|
Plan resubmittals requested | | | 3/18/2005 | | DONE |
|
|
|
Mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 3/15/2005 | | 3/17/2005 | | FAIL |
|
|
|
|
Routing - PLUMBING | 3/14/2005 | | 3/15/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLANNING | 3/11/2005 | | 3/14/2005 | | PASS |
|
|
|
Sarah Schafer DRH04-00301
Approved per DRH04-00301. I left a message with Trent Koci requesting copies of sheets L-1, SD-1 and SD-2 for the DR files.
|
Routing - Erosion and Sediment | 3/9/2005 | | 3/11/2005 | | FAIL |
|
|
|
ESC plan failed. No ESC narrative included. Contacted PD.
|
Routing - PUBLIC WORKS | 3/7/2005 | | 3/9/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/4/2005 | | 3/7/2005 | | PASS |
|
|
|
Approved. Lots 29, 30 and 31of Pleasonton Add'n. combined by ROS 6685.
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2005 | | |
|
|
|
|
Application received | | | 2/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2005 | | |
|
|
|
|
Fee Review-notes | 2/25/2005 | 2/25/2005 | | | |
|
|
|
|