BLD-Final | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PASS |
Tom Arcoraci
|
|
|
traux; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
Code Occupancy Approval Temp | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | FAIL |
Scott M.Brown
|
|
|
needs to bond for landscape $6673 DRH04-00172
|
Inspection Record Card- Bld | | | 4/5/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/7/2006 | 2/8/2006 | 2/7/2006 | A | PASS |
Tom Arcoraci
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Energy code compliance | 2/7/2006 | 2/7/2006 | 2/7/2006 | P | PASS |
Tom Arcoraci
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Tom Arcoraci
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Tom Arcoraci
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PASS |
Tom Arcoraci
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 8/24/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary (BLD) | | | 8/10/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/10/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 8/10/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/10/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/23/2005 | | FAIL |
|
|
|
Received (2) full sets of plans, (2) copies of the ResCheck and (2) copies of the Description of Materials. Routed to Perry P.
Called architect M. Fairchild explained that other the changed items did not reflect the penetration problems.
|
Routing - PLAN CHECK | 5/23/2005 | | 5/23/2005 | | FAIL |
|
|
|
Received (2) full sets of plans, (2) copies of the ResCheck and (2) copies of the Description of Materials. Routed to Perry P.
Called architect M. Fairchild explained that other the changed items did not reflect the penetration problems.
|
Plan assigned to (PEP) | 3/23/2005 | | 3/23/2005 | | FAIL |
|
|
|
called contractor Rob Truax to ask for clarification on proposed "not allowed" beam penetrations of the interior membrane of the property line "townhouse wall" 4:40p.m. 3.23.2005 pep
|
Plan Reviewer's activity | | | 3/23/2005 | | |
|
|
|
called contractor Rob Truax to ask for clarification on proposed "not allowed" beam penetrations of the interior membrane of the property line "townhouse wall" 4:40p.m. 3.23.2005 pep
|
Routing - PLAN CHECK | 3/3/2005 | | 3/23/2005 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 3/2/2005 | | 3/3/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 3/1/2005 | | 3/2/2005 | | PASS |
|
|
|
Routed to Sarah Schafer per DR-129-88 and DR04-00172 eeg.
Approved per DRH04-00172. Setbacks were approved under CU-113-88.
|
Application received | | | 3/1/2005 | | |
|
|
|
|