Permit EXPIRED | | | 9/17/2007 | | DONE |
|
|
|
Estrella Restaurant tenant no longer there, moved out
|
BLD-Final | 2/26/2007 | 2/26/2007 | 2/26/2007 | P | NH |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt no access
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | NH |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt no access
|
BLD-Final | 2/26/2007 | 2/26/2007 | 2/26/2007 | P | PASS |
Dave Hannah
|
|
|
Please check restroom sinks & ada signage & then let me know. Thanks Internet Inspection Request from: Cathy Weisshaupt
|
Code Occupancy Approval | | | 11/28/2005 | | PASS |
|
|
|
Compliance Met.
|
BLD-Final | 11/25/2005 | 11/25/2005 | 11/25/2005 | P | PART |
Dave Hannah
|
|
|
bill - ###-#### ok for temp occ needs other trades to sign off perm and fix sinks inrestrooms and ada signage
|
FIRE-Final Inspection | 11/25/2005 | 11/25/2005 | 11/25/2005 | P | PART |
Forrest France
|
|
|
Fire life safety is acceptable pending final of the alarm and sprinkler permits for the shell.
|
Temporary occupancy | | | 11/25/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5322 issued 11-25-05 to the Estrella Restaurant.
|
FIRE-Final Inspection | 11/23/2005 | 11/23/2005 | 11/23/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today, the related fire alarm and sprinkler permits must be finaled prior to life safety approval.
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Forrest France
|
|
|
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie///cancelled per Bill w/Cafco will call to reschedule //11/22/05 LEG 4:28pm
|
BLD-Conference | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Jim Storey
|
|
|
everett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 9/29/2005 | 9/29/2005 | 9/30/2005 | P | PART |
Dave Hannah
|
|
|
fire caulking in duct shaft///everett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore shaft on second and thrid floors ok to cover ext
|
BLD-Framing/Rough-in | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | NR |
Dave Hannah
|
|
|
shaft walls
|
BLD-Framing/Rough-in | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | NR |
Dave Hannah
|
|
|
shaft wall inspection//everett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Other | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | NR |
Dave Hannah
|
|
|
Fire calking\###-#### ready after 10:00
|
BLD-Framing/Rough-in | 9/20/2005 | 9/20/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
everett - fire proofing for steel beans he will call when ready late afternoon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles theird floor 1hr protection of beam at shaft ok
|
BLD-Other | 9/19/2005 | 9/19/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
everett - fire proofing for steel beans he will call when ready late afternoon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles fire proofing first floor beams for shaft opennig ok
|
BLD-Framing/Rough-in | 9/9/2005 | 9/9/2005 | 9/12/2005 | P | PART |
Dave Hannah
|
|
|
steel studs inspection please///everett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 1st floor restroom area it walls ok to cover but need engineer to ok dome ceiling area lack of detail on plans asto how it sould be framed
|
BLD-Energy code compliance | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | FAIL |
Dave Hannah
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this was for the fire proofing on beams installed for the cut made for the shaft the fire proofing was mixed with sheetrock mud and hand aplyed this is no per anything it fails
|
BLD-Conference | 8/29/2005 | 8/29/2005 | 8/30/2005 | P | PART |
Dave Hannah
|
|
|
###-#### - everett Note: please call 1/2 hr prior to inspection fire protection of project
|
Override - People Holds | | | 8/4/2005 | | |
|
|
|
|
Override - People Holds | | | 8/4/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/4/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 7/28/2005 | | DONE |
|
|
|
|
Override - People Holds | | | 7/28/2005 | | |
|
|
|
|
Override - People Holds | | | 7/28/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/28/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/28/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/28/2005 | | DONE |
|
|
|
|
BLD-Conference | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Dixie Fellows
|
|
|
Meet Dave in the garage at 8:20 per your request.......discussed shafts and wrap
|
BLD-Conference | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PART |
Dave Hannah
|
|
|
Meet Dixie in the garage at 8:20 per her request.......talked about gresse ducts and shafts
|
Override - Parcel Holds | | | 7/26/2005 | | |
|
|
|
|
Override - People Holds | | | 7/26/2005 | | |
|
|
|
|
Override - People Holds | | | 7/26/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 7/26/2005 | | |
|
|
|
|
Override - People Holds | | | 7/26/2005 | | |
|
|
|
|
Override - People Holds | | | 7/26/2005 | | |
|
|
|
|
BLD-Conference | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 7/11/2005 | 7/12/2005 | 7/14/2005 | A | CANC |
Dave Hannah
|
|
|
per Dixie's request////for questions please call her at ###-####
|
Override - Parcel Holds | | | 7/11/2005 | | |
|
|
|
|
Override - People Holds | | | 7/11/2005 | | |
|
|
|
|
Override - People Holds | | | 7/11/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 7/11/2005 | | |
|
|
|
|
Override - People Holds | | | 7/11/2005 | | |
|
|
|
|
Override - People Holds | | | 7/11/2005 | | |
|
|
|
|
OVERRIDE | | | 6/23/2005 | | |
|
|
|
|
Override - People Holds | | | 6/23/2005 | | |
|
|
|
|
Override - People Holds | | | 6/23/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/23/2005 | | |
|
|
|
|
Telephone call | | | 6/23/2005 | | |
|
|
|
talked to cory nelson at ###-#### permit is ready
|
Routing - PLAN CHECK | 6/22/2005 | | 6/23/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2005 | | DONE |
|
|
|
|
Override - People Holds | | | 6/23/2005 | | |
|
|
|
|
Override - People Holds | | | 6/23/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/23/2005 | | |
|
|
|
|
Plan assigned to (CJW) | 3/4/2005 | | 6/23/2005 | | PASS |
|
|
|
6/23/2005 08:10:28 CJW - activity updated through activity BLDA022 from case BLD05-00521.
|
Routing - PLUMBING | 6/21/2005 | | 6/21/2005 | | PASS |
|
|
|
per plans, architects and engineers responses,and 2003 upc.
|
Routing - PUBLIC WORKS | 6/20/2005 | | 6/21/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/17/2005 | | 6/20/2005 | | DONE |
|
|
|
Inserted resubmitted drawings and sent to Public Works.
|
Plan resubmittals received | | | 6/20/2005 | | |
|
|
|
Received (2) copies of sheet P1.0, P1.1, P1.2, P2.0, P3.0, P3.1 and P4.0. Routed to Carl W.
|
Routing - PLUMBING | 5/13/2005 | | 5/16/2005 | | FAIL |
|
|
|
protection of waste and vent piping above food prep, storage areas will be required. GI-1 will need to discharge to a floor sink. vent floor drains in the restrooms. provide a water supply to the soap dispensor at the mop sink. satisfy any pre-treatment requirements with public works, resubmit any plumbing changes for approval.
|
Routing - PLANNING | 5/10/2005 | | 5/13/2005 | | PASS |
|
|
|
Approved per DRH03-230, except that occupancy is not allowed until plaza details have been completed per Design Review.
|
Routing - PUBLIC WORKS | 5/6/2005 | | 5/10/2005 | | FAIL |
|
|
|
Unresolved pretreatment issues. Contact Mike Hunter at ###-####
|
Routing - PLAN CHECK | 4/12/2005 | | 5/6/2005 | | PASS |
|
|
|
The drawings were approved, with "red lines", after the resubmittal review.
|
Plan resubmittals received | | | 5/4/2005 | | DONE |
|
|
|
Received Transmittal Letter, 1 Letter, 1 Plan Review Response, 2 Structural Calcs, & 2 Copys of sheets A0.1,A0.2,A2.0,A2.1,A3.0,A4.0,A5.0,A5.1,M1.0,M1.1,M1.2,M2.0,M3.0,M4.0,P2.0,P3.0 Taken to Carl W.
|
1st review completed | | | 4/12/2005 | | FAIL |
|
|
|
failed planning, public works, plumbing, and plan check.
|
Routing - FIRE | 4/7/2005 | | 4/12/2005 | | PASS |
|
|
|
Review of drawings delayed by routing glitch. Review comments faxed to architect.
|
Routing - PLANNING | 3/22/2005 | | 3/25/2005 | | FAIL |
|
|
|
Applicant needs to submit details of exposed duct work on west for review and approval by Staff. Also, plaza design has not been approved. Approval of tenant improvements are contingent upon obtaining approval of the plaza design. Letter sent to Tomlinson & Associates on March 25, 2005 addressing these items. Cole Poe Architects and CCDC copied on the letter.
|
Routing - PLAN CHECK | 3/8/2005 | | 3/22/2005 | | FAIL |
|
|
|
The IBC plan review was started on March 19, 2005 and was finished on March 22, 2005. Resubmitted drawings were required. See the plan review report.
|
Routing - PLUMBING | 3/7/2005 | | 3/8/2005 | | FAIL |
|
|
|
provide a complete set of waste and vent plans with interceptor per public works pretreatment for review. verify premise protection(water).
|
Routing - PUBLIC WORKS | 3/4/2005 | | 3/7/2005 | | FAIL |
|
|
|
Need to engineer installation of a grease interceptor for all kitchen grease/grey water drainage per UPC siting. Contact Mike Hunter at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2005 | | DONE |
|
|
|
|
Application received | | | 3/1/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/1/2005 | | DONE |
|
|
|
|
BLD-Conference | 7/11/2005 | 7/12/2005 | | A | |
Dixie Fellows
|
|
|
per Dixie's request////for questions please call her at ###-####
|