Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00523
StatusFinaled
Name AEI
Site Address 1439 S WEIDEMAN AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
***Intermediate Child Care Facility BLD, ESC & PWK**** To construct a 2,254 sq. ft. one story Type VB Group E daycare for 30 children over 2 1/2 years of age. Other work includes all site improvements, paving and landscaping per approved plans and attachments CUP04-00131, DRH05-00012.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Voucher Form  1/11/2006 DONE
Third Notice BLD12/6/200512/6/200512/28/2005 DONE
Second Notice has not been responded to.
Second Notice BLD9/14/20059/14/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 7/8/20059/14/2005 DONE
Permanent occupancy UNPAID FEE  7/8/2005 DONE
Perm. Occ. Cert. # 10658 issued 7-8-05 to the Intermediate Child Care Facility.
Code Occupancy Approval6/29/20056/29/20056/29/2005PPASS
DetailsScott M.Brown
OK FINAL SIGNED OFF
Permanent Occupancy 6/29/20056/29/2005 DONE
Details
PubWorks Occupancy Approval6/22/20056/22/20056/28/2005 DONE
Drainage project complete, signed permanent occupancy 6/22/05. R.Rokovitz
Code Occupancy Approval Temp6/23/20056/23/20056/23/2005PPASS
DetailsScott M.Brown
CORRECTION NOTICE FOR SIDEWALK & BIKE RACK, IN PROGRESS SO I SIGNED TEMP OCCUPANCY ONLY
BLD-Final6/22/20056/23/20056/23/2005APASS
DetailsMike Jordan
dave ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Ok for perm occ.
Temporary occupancy  6/23/2005 DONE
Temp. Occ. Cert. # 5253 issued 6-23-05 to the Intermediate Child Care Facility.
FIRE-Final Inspection6/20/20056/21/20056/21/2005APASS
DetailsForrest France
Fire life safety passed inspection.
BLD-Framing/Rough-in5/16/20055/17/20055/17/2005ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/16/2005 at 3:21:43 PM. Contact: ###-####.
BLD-Energy code compliance5/16/20055/17/20055/17/2005ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/16/2005 at 3:22:24 PM. Contact: ###-####.
BLD-Energy code compliance5/17/20055/17/20055/17/2005PPASS
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie FRAME PASS 5/17/2005 6:49:15 PM
BLD-Energy code compliance5/13/20055/16/20055/16/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/13/2005 at 10:21:54 AM. Contact: ###-####.
BLD-Wall cover5/13/20055/16/20055/16/2005PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/13/2005 at 10:22:46 AM. Contact: ###-####. C/N on Framing..... Truss bracing. 5/16/2005 4:59:09 PM
BLD-Framing/Rough-in5/5/20055/6/20055/6/2005APART
DetailsJim Sly
shear nail inspection as late morning as possible please//dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Shear nail OK. 5/6/2005 1:26:14 PM
BLD-Foundation4/12/20054/13/20054/13/2005PPASS
DetailsDave Hannah
cam; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing4/11/20054/12/20054/12/2005PPASS
DetailsJim Sly
cam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  4/7/2005  
Issue PAID IN FULL permit  4/6/2005 DONE
Inspection Record Card- Bld  4/4/2005  
Inspection Record Card- Bld  4/4/2005  
Permit Ready to Issue  4/4/2005  
Print Occupancy Form  4/4/2005  
Telephone call  4/4/2005 DONE
talked to tom williams at ###-#### that permit is ready & need a.c.h.d.
Plan assigned to (MLO)3/7/2005 4/1/2005 PASS
4/1/2005 13:42:13 MLO - activity updated through activity BLDA022 from case BLD05-00523.
Routing - PLANNING4/1/2005 4/1/2005 PASS
per revised drainage plan
Routing - PLAN CHECK4/1/2005 4/1/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/1/2005 DONE
Plan resubmittals received  3/30/2005 DONE
Received Transmittal Letter, 2 Copys of sheets T-1,C1.0,C2.0,ST-1,A-2,A-3,A-4,A-5,A-1,S-1,S-2,S-3,MP-1,M-2,M-1,M-3,M-4,P-1,P-2,E-1 Taken to Mike O.
1st review completed  3/30/2005 FAIL
failed planning and plan check
Routing - FIRE3/25/2005 3/30/2005 PASS
Routing - PLAN CHECK3/14/2005 3/25/2005 FAIL
Mike O. corrections sent to architect MLO

3/18/05- I forgot to write my pass down of the documents into permit plan on the 14th. Sorry. SMS
Plan resubmittals requested  3/25/2005 DONE
IBC corrections
Routing - PLANNING3/23/2005 3/23/2005 FAIL
Rcvd. fax from Tom Wiliams indicating water would be directed to parking lot through collection pipe system as originally planned. Storm water retention area is no longer proposd in approved grassy play area. So, plans can be approved once plans are rcvd. per CUP.
Routing - PLANNING3/23/2005 3/23/2005 FAIL
Route back to planning to have plans signed. Informed Tom that fax is accurate but need plans to substantiate change.
Routing - PLANNING3/11/2005 3/14/2005 FAIL
Sara S. DRH05-00012 -applicant meets requirements of DR. DR staff is waiting to approve based on changes to drainage. I had passed these plans on to Plan Check put forgot to place the information in PP on 3/14/05.

Angela W. CUP04-00131 / Comment: Drainage area cannot be located in Children's play area for safety reasons and net outdoor sq. footage required per child. Must relocate basin & provide plan. Left detailed msg. w/ Brian for Tom Williams.
Routing - PLUMBING3/11/2005 3/11/2005 PASS
Note for contractor to provide plywood protection per detail on sheet P-2. Approvved per plan and 2003 UPC
Routing - Erosion and Sediment3/10/2005 3/11/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/8/2005 3/10/2005 PASS
Plans ACCEPTED BY PLAN TECH  3/8/2005  
Plan routing begun/NEW & ADDTN  3/8/2005  
Routing - PLANNING Land Div3/8/2005 3/8/2005 PASS
Lot 3, Block 1 of Rocky Mountain Subdivision
Application received  3/1/2005  
Recd Pcfee & Taken To Pln CK  3/1/2005  
Fee Review-notes3/1/20053/1/2005