Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-00545
StatusFinaled
Name CHRIS PALMER (OWN REP)
Site Address 519 S 8TH ST
Project Name8TH & FULTON BLDG
Customer Number 
ePlanReviewNo
Description
(8TH & FULTON BUILDING - BASEMENT STORAGE) This building is fully fire sprinklered because of low fire-flows and because the basement windows are too small. Fire sprinklers also substitute for the basement enclosure. To create a nonrated corridor within the basement of an existing building. A total of four (4) storage areas will be created. Work is to include interior nonbearing walls and interior doors. All work shall comply with the approved drawings, the plan review report, approved modifications, and all applicable codes. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  8/11/2006 DONE
Letter of Compliance issued 8-11-06
Second Notice BLD5/25/20065/25/20066/13/2006 DONE
First Notice has not been responded to.
First Notice5/2/20065/2/20065/25/2006 DONE
DetailsDave Hannah
BLD-Final5/1/20065/2/20065/2/2006PPASS
DetailsDave Hannah
chris ###-#### - re-insp--left lighting worksheet calculations in office
DOC - Permit Finaled5/2/20065/2/20065/2/2006PPASS
DetailsDave Hannah
BLD-Final4/26/20064/26/20064/26/2006PFAIL
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need wattage calc./ signage and tape on header beam back exit.
FIRE-Final Inspection4/25/20064/26/20064/26/2006APASS
DetailsForrest France
Fire life safety passed inspection.
FIRE-Final Inspection4/20/20064/21/20064/21/2006ACANC
DetailsTroy Cobbley
chris; Phone #: ###-#### Per contractor he was not prepared for the sprinkler inspection and would just reschedule for next week.
BLD-Framing/Rough-in12/14/200512/16/200512/16/2005PPASS
DetailsDave Hannah
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in12/9/200512/12/200512/12/2005ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/9/2005 at 3:04:49 PM. Contact: ###-####.
BLD-Conference12/5/200512/7/200512/7/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/5/2005 at 11:06:58 AM. Contact: ###-####. work about to start
BLD-Aging Inspection8/30/20058/30/20058/30/2005 PASS
DetailsDave Hannah
Receive PAYMENT IN FULL  8/29/2005 DONE
CHANGE STATUS TO (ISS)  8/29/2005 DONE
picked up by mistake previously --changed to issed status
(F) Reprint permit  8/29/2005  
Telephone call  6/29/2005 DONE
margie kennedy at ###-#### that permit is ready
Telephone call  5/18/2005 DONE
called left voice message for margie permit is ready and fees
CHANGE STATUS TO (RDY)  4/28/2005 DONE
customer picked up wrong permit- changed status to ready
Issue PAID IN FULL permit  4/15/2005 DONE
Plan assigned to (CJW)3/7/2005 3/31/2005 PASS
3/31/2005 08:06:23 CJW - activity updated through activity BLDA022 from case BLD05-00545.
Routing - PLAN CHECK3/30/2005 3/31/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/31/2005 DONE
Inspection Record Card- Bld  3/31/2005 DONE
Permit Ready to Issue  3/31/2005  
Telephone call  3/31/2005  
left margie kennedy at ###-#### is ready
Routing - FIRE3/25/2005 3/30/2005 PASS
1st review completed  3/30/2005 PASS
Routing - PLAN CHECK3/7/2005 3/25/2005 PASS
The IBC plan review was started on March 24, 2005 and was finished the next day. The drawings were approved with corrections. See the plan review report and the "red lines" on the drawings.
Plans ACCEPTED BY PLAN TECH  3/7/2005 DONE
Application received  3/3/2005  
Recd Pcfee & Taken To Pln CK  3/3/2005 DONE
Fee Review-notes3/3/20053/3/2005