Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/21/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 12/21/2005 | | DONE |
|
|
|
Left message for Peak ELE regarding final value difference///12/21/05 @9:15am BAS
|
Telephone call | | | 12/21/2005 | | DONE |
|
|
|
Left message for Lenny with Buss Mechanical regarding final value difference///12/21/05 @9:15am BAS
|
Second Notice BLD | 9/14/2005 | 9/14/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Telephone call | | | 11/30/2005 | | DONE |
|
|
|
Spoke with Lenny w/ Buss (PLM) and asked for final value///11/30/05 BAS
|
Telephone call | | | 11/30/2005 | | DONE |
|
|
|
Left message for Peak (Ele) regarding final value difference///11/30/05 BAS
|
First Notice | 8/24/2005 | 8/24/2005 | 9/14/2005 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 8/23/2005 | 8/24/2005 | 8/24/2005 | P | PASS |
Dave Hannah
|
|
|
COREY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 8/24/2005 | 8/24/2005 | 8/24/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/12/2005 | 8/12/2005 | 8/16/2005 | P | DONE |
Dave Hannah
|
|
|
###-#### cory; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 8/12/2005 | 8/15/2005 | 8/15/2005 | A | PART |
Dave Hannah
|
|
|
corey; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ
|
FIRE-Final Inspection | 8/12/2005 | 8/15/2005 | 8/15/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 8/12/2005 | 8/12/2005 | 8/12/2005 | P | CANC |
Troy Cobbley
|
|
|
Ran out of time for inspection
|
BLD-Final | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | NR |
Dave Hannah
|
|
|
corey or ###-####//for temp occupancy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Telephone call | | | 5/18/2005 | | |
|
|
|
called spoke with skyler permit is ready and fees. He said will tell GC to pick up.
|
Telephone call | | | 4/20/2005 | | DONE |
|
|
|
called left voicemail for Skyler permit is ready 4/20/05 4:00pm
|
Telephone call | | | 4/1/2005 | | DONE |
|
|
|
tlk to skyler robel ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/1/2005 | | DONE |
|
|
|
|
Routing - PLUMBING | 3/29/2005 | | 3/31/2005 | | PASS |
|
|
|
Mark water lines downstream of R.P valves per 602.2 2003 UPC approved per plan and 2003 UPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/31/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/9/2005 | | 3/31/2005 | | PASS |
|
|
|
3/31/2005 15:18:02 MLO - activity updated through activity BLDA022 from case BLD05-00571.
|
Routing - FIRE | 3/22/2005 | | 3/28/2005 | | PASS |
|
|
|
review faxed to architect
|
1st review completed | | | 3/28/2005 | | FAIL |
|
|
|
failed plumbing
|
Plan resubmittals received | | | 3/24/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to Mike Otto: 3 copies of plan sheets P0.1 and P2.1.
|
Routing - PLAN CHECK | 3/15/2005 | | 3/22/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 3/14/2005 | | 3/15/2005 | | FAIL |
|
|
|
hot and cold water to the labs must be protected from cross connection contamination by an r.p. backflow preventor with the exception of the eyewash. vents from sinks in which acid or corrosive chemicals are to be used may not connect to vents connected to the sanitary sewer system. provide information on chemicals used in the lab to determine waste requirements and a location outside the lab with drainage for the hot and cold water r.p.s.
|
Routing - PUBLIC WORKS | 3/9/2005 | | 3/14/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2005 | | |
|
|
|
|
Application received | | | 3/4/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/4/2005 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2005 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 3/4/2005 | | DONE |
|
|
|
|
Fee Review-notes | 3/4/2005 | 3/4/2005 | | | |
|
|
|
|