BLD-Final | 11/4/2005 | 11/4/2005 | 11/4/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2005 at 11:20:45 AM. Contact: ###-####.
|
BLD-Final | 11/4/2005 | 11/4/2005 | 11/4/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2005 at 6:45:06 AM. Contact: ###-####. needs t. records to sign off for final
|
BLD-Grading Inspection | 11/4/2005 | 11/4/2005 | 11/4/2005 | | DONE |
|
|
|
Final grading and drainage approved
|
DOC - Permit Finaled | 11/4/2005 | 11/4/2005 | 11/4/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/22/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/22/2005 at 2:59:47 PM. Contact: ###-####. ok to cover
|
BLD-Framing/Rough-in | 7/21/2005 | 7/21/2005 | 7/21/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2005 at 7:57:25 AM. Contact: ###-####. frame ok and shear
|
BLD-Framing/Rough-in | 7/15/2005 | 7/19/2005 | 7/19/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 2:49:06 PM. Contact:bob ###-####. conf. only,, shear NOT approved
|
BLD-Footing | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 4:58:36 PM. Contact: ###-####.
|
PubWorks Subgrade Approval | 5/19/2005 | 5/19/2005 | 5/19/2005 | | PASS |
|
|
|
Footing subgrade for garage nook and stub-out have been approved by the geotechnical engineer
|
BLD-Foundation | 5/16/2005 | 5/16/2005 | 5/16/2005 | P | PART |
Tony Young
|
|
|
as early as possible please//dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 5/11/2005 | 5/12/2005 | 5/12/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 5:59:55 PM. Contact: ###-####.
wip 5/12/2005 3:41:27 PM
|
PubWorks Subgrade Approval | 5/12/2005 | 5/12/2005 | 5/12/2005 | | DONE |
|
|
|
Footing subgrade for second set of footings approved by the geotechnical engineer.
|
BLD-Footing | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/9/2005 at 7:16:51 AM. Contact: ###-####.
house ftgs ok,,wip,,,verbal ok on soil from eng. per T. R. 5/12/2005 3:43:56 PM
|
BLD-Foundation | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PASS |
Troy James
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PART |
Troy James
|
|
|
bob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
basement footings only 4/18/2005 10:44:49 AM
|
PubWorks Subgrade Approval | 3/10/2005 | 3/10/2005 | 4/15/2005 | | PASS |
Terry Records
|
|
|
FOOTING SUBGRADE FOR BASEMENT HAS BEEN APPROVED BY THE GEOTECHNICAL ENGINEER.
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
Plan assigned to (SAM) | 3/8/2005 | 4/13/2005 | 4/14/2005 | | PASS |
|
|
|
4/14/2005 07:23:45 SAM - activity updated through activity BLDA022 from case BLD05-00615.
|
Routing - PLAN CHECK | 4/1/2005 | | 4/14/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/14/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 4/14/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/14/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 4/14/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Activity Holds | | | 4/14/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/14/2005 | | DONE |
|
|
|
|
Routing - FIRE | 3/30/2005 | | 4/1/2005 | | PASS |
|
|
|
No fire sprinklers required (Highlands Hackberry #4)
|
Routing - Erosion and Sediment | 3/29/2005 | | 3/30/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 3/29/2005 | | 3/29/2005 | | PASS |
|
|
|
Okay per redlines by applicant
|
Routing - PLANNING | 3/11/2005 | | 3/11/2005 | | FAIL |
|
|
|
Eave encroaches more than 2' into the street side setback. Left message w/ applicant at noon on 3/11/05.
|
Routing - PUBLIC WORKS | 3/11/2005 | | 3/11/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/8/2005 | | 3/10/2005 | | PASS |
|
|
|
Approved as Category 3
|
Application received | | | 3/8/2005 | | |
|
|
|
|