Permit Information
Permit NumberBLD05-00633
StatusFinaled
Name ST ALPHONSUS REGIONAL MEDICAL CNTR
Site Address 1055 N CURTIS RD
Project NameSt Al's Central Tower Addition
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS CENTRAL TOWER)(INTERIOR FIT UP) 1/17/08 - PLAN MODIFICATION. TO MODIFY THE ROOF TOP AREA ADJACENT TO THE 4TH FLOOR PATIENT FLOOR FOR USE AS A ROOF GARDEN. TO MODIFY PLUMBING, ELECTRICAL, PERIMETER RAILS, LANDINGS, EXIT DOORS/SIGNAGE AND EMERGENCY LIGHTING, DOOR HARDWARE AND ROOF FINISH FOR PUBLIC & PATIENT USE. To complete the interior build out & finish for portions of the entire 357,555 sq. ft., 10 story central tower, 9 stories for medical and support uses' and 1 story for mechanical penthouse and a 41,610 sq. ft. basement. First floor pharmacy and 2nd floor access corridor are being completed and occupied under separate permits (BLD05-00635 & BLD05-00634). Work includes protection of building elements per Table 601 for "IA" construction of 2003 IBC; framing to be non-combustible, with finishes per approved plans; electrical, plumbing, mechanical, fire supression, alarm, medical gas and exit systems to meet tenant needs and provide compliance with minimum current adopted codes and ordinances. work also includes selective interior demolition and remodel of portions of the existing North and South Towers as they are connected to the new Central Tower. (drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20083/11/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Third Notice BLD9/22/20089/22/20083/11/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/11/20088/11/2008 DONE
First Notice 6/11/20088/11/2008 DONE
Permanent Occupancy  6/11/2008 DONE
DetailsCathy Weisshaupt
Print Occupancy Form  6/11/2008 DONE
DetailsCathy Weisshaupt
FIRE-Final Inspection6/6/20086/9/20086/10/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Conference6/5/20086/5/20086/5/2008PPASS
DetailsTom Arcoraci
BLD-Conference5/22/20085/22/20085/23/2008PCANC
DetailsTom Arcoraci
BLD-Conference4/8/20084/15/20084/15/2008APASS
DetailsTom Arcoraci
see tom
BLD-Conference4/8/20084/8/20084/8/2008PPASS
DetailsTom Arcoraci
roof top garden ok to occupy
FIRE-Sprinkler Rough-in4/4/20084/7/20084/7/2008ADONE
DetailsTroy Cobbley
The inspection today was for the roof top garden area. The fire life safety for this area is passed. The smoke detector for the sliding window and the fire alarm as-builts are needed prior to final.
BLD-Conference4/4/20084/4/20084/4/2008PPASS
DetailsTom Arcoraci
FIRE-Sprinkler Rough-in4/4/20084/4/20084/4/2008PCANC
DetailsTroy Cobbley
carl Phone #: ###-####
BLD-Other3/25/20083/25/20083/25/2008PPASS
DetailsTom Arcoraci
see Tom
BLD-Other3/14/20083/14/20083/14/2008PPASS
DetailsTom Arcoraci
BLD-Wall cover3/6/20083/6/20083/6/2008PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in3/3/20083/3/20083/3/2008PPART
DetailsTom Arcoraci
FIRE-Conference2/25/20082/25/20082/26/2008PCANC
DetailsTroy Cobbley
BLD-Conference2/12/20082/13/20082/13/2008ACANC
DetailsTom Arcoraci
BLD-Conference2/12/20082/12/20082/12/2008PCANC
DetailsTom Arcoraci
FIRE-Final Inspection2/11/20082/12/20082/12/2008AFAIL
DetailsTroy Cobbley
Todays inspection was for the 2ND floor south tower at the cafeteria. Two additional emergency lights are required as discussed in the corridor side of the cafeteria east exit
CHANGE STATUS TO (ISS)  2/11/2008 DONE
plan mod fees paid and returned to issue
(F) Reprint permit  2/11/2008 DONE
OVERRIDE  2/7/2008  
Telephone call  2/7/2008  
lft vm with jeff cramer at HDR that mod fees are ready to be picked up
Permit Ready to Issue  2/7/2008 DONE
Plan assigned to (DRS)1/18/20081/18/20082/6/2008 PASS
DetailsDan Stuart
2/6/2008 17:31:17 DRS - activity updated through activity BLDA022 from case BLD05-00633.
Routing - PLAN CHECK1/29/2008 2/6/2008 PEND
DetailsSarah Schafer
Plans to Planning
Routing - PLANNING2/6/2008 2/6/2008 PASS
DetailsSarah Schafer
Approved per DRH08-00030 and SMS.
Routing - PLAN CHECK2/6/2008 2/6/2008 PASS
DetailsDan Stuart
PLAN MODIFICATION REVIEW COMPLETED. PLANS TO PERMIT DESK TO ISSUE NEW PERMIT.
Routing - PLAN CHECK2/6/2008 2/6/2008  
PLANS/APPL TAKEN TO FRONT DESK  2/6/2008 PASS
Override - Parcel Holds  2/6/2008  
Print Pending Permit.LaserJet4  2/6/2008  
Case Summary (BLD)  2/6/2008  
Case Summary (BLD)  2/6/2008  
Routing - FIRE1/28/2008 1/29/2008 PASS
DetailsScott Arellano
Attacehed updated IFC review comments to plans.
Routing - PLUMBING1/25/2008 1/28/2008 PASS
DetailsBill VanDegrift
any vent within 10' of the patio must extend to 7' and be secuerly stayed.
Routing - PUBLIC WORKS1/25/2008 1/25/2008 PASS
DetailsBeverly Hall
Routing - PLANNING1/22/2008 1/24/2008 FAIL
DetailsSarah Schafer
1/24/08 - SMS notified Jeff Cramer, HDR, that a DR modification was required.
Routing - PLAN CHECK1/22/2008 1/22/2008 PEND
DetailsDan Stuart
Routing to planning to review plan modification.
Override - Parcel Holds  1/22/2008  
Print Pending Permit.LaserJet4  1/22/2008  
Case Summary (BLD)  1/22/2008  
FIRE-Final Inspection1/16/20081/17/20081/18/2008PPART
DetailsTroy Cobbley
Life safety for the 9th floor is passed. The 4th floor garden area is being submitted for plan review comments per tom hayes. Re-inspection of the garden area will be needed when the plans are issued. Also need the 2nd floor cafeteria area/corridors inspected as well.
BLD-Final1/17/20081/18/20081/18/2008APART
DetailsTom Arcoraci
ok temp 9 th floor
Temporary Occupancy1/18/20084/17/20081/18/2008 DONE
DetailsCathy Weisshaupt
Plans ACCEPTED BY PLAN TECH  1/18/2008 DONE
$ 500.00 initial fee waived per Dan S. Will do the hour rate.
Override - Parcel Holds  1/18/2008  
Plan Modification Accepted  1/18/2008 DONE
Plan Modification exceptet for BLD05-00633 for the inclusion of roof garden into central tower project,Roof garden includes planters and pvaers. That is to be accessed from the fourth level of the central tower.Affected sheets are A-11-4,A-801-4,A-802-4,CL-102-4,EC-104E-4,EP-104-4,EL-104E-4,PP-103E-4,PP-104E-4 . Routed to San S.
BLD-Conference1/14/20081/16/20081/16/2008APASS
DetailsTom Arcoraci
BLD-Final1/11/20081/11/20081/14/2008PPASS
DetailsTom Arcoraci
FIRE-Final Inspection1/9/20081/10/20081/11/2008APART
DetailsTroy Cobbley
The 6th, 7th and 8th floor life safety is complete. The 4th floor garden are needs the emergency light at the stairs repaired and the sprinkler head just inside of the stairway door provided with a canopy and the tape removed. The fire watch can be discontinued as per Dave Hanniman. The 9th floor life safety stills needs to be completed as well as the 2nd, 3rd, 4th and 5th floor tie ins.
Temporary Occupancy1/11/20084/10/20081/11/2008 DONE
DetailsCathy Weisshaupt
BLD-Conference1/9/20081/10/20081/10/2008PPASS
DetailsTom Arcoraci
FIRE-Final Inspection1/9/20081/9/20081/9/2008PCANC
DetailsTroy Cobbley
tom Phone #: ###-####
BLD-Conference1/8/20081/9/20081/9/2008PPASS
DetailsTom Arcoraci
FIRE-Final Inspection1/2/20081/2/20081/2/2008PFAIL
DetailsTroy Cobbley
The inspection was for the life safety on the 8th and 9th floors. The inspection was stopped on the eighth floor due to exit sign locations not matching the city approved plans. Also one exit sign was not working. Tom directed the electrician to install per the plans and per the installation on the 4th and 5th floors.
BLD-Wall cover12/19/200712/19/200712/20/2007PCANC
DetailsTom Arcoraci
BLD-Wall cover12/12/200712/12/200712/12/2007PCANC
DetailsTom Arcoraci
BLD-Wall cover11/19/200711/20/200711/20/2007PCANC
DetailsTom Arcoraci
see tom
BLD-Final11/20/200711/20/200711/20/2007PPASS
DetailsTom Arcoraci
see tom ok temp occ 5 floor
Temporary Occupancy11/20/20072/18/200811/20/2007 DONE
FIRE-Final Inspection11/8/200711/9/200711/9/2007APART
DetailsTroy Cobbley
The 4th and 5th floors of the central tower are ok to occupy. The interconnections at teh 4th and 5th floors to the north tower are not complete yet and are to be blocked off until work is complete.
BLD-Final11/8/200711/9/200711/9/2007PPART
DetailsTom Arcoraci
4 and 5 ok for temp occ 4th floor only
Temporary Occupancy11/9/20072/7/200811/9/2007 DONE
FIRE-Final Inspection11/7/200711/7/200711/8/2007PCANC
DetailsTroy Cobbley
tom - fire life safety Phone #: ###-####
BLD-Final11/7/200711/8/200711/8/2007ACANC
DetailsTom Arcoraci
BLD-Framing/Rough-in11/2/200711/2/200711/2/2007PCANC
DetailsTom Arcoraci
BLD-Conference10/24/200710/24/200710/24/2007PPASS
DetailsTom Arcoraci
temp ok asu ssu 2nd level
FIRE-Final Inspection10/24/200710/24/200710/24/2007PPART
DetailsTroy Cobbley
The ASU SSU portion of the project is ok to occupy.
FIRE-Final Inspection10/23/200710/23/200710/24/2007PCANC
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need finaled first.
Temporary Occupancy10/24/20071/22/200810/24/2007 DONE
FIRE-Final Inspection10/17/200710/18/200710/19/2007PCANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection10/19/200710/19/200710/19/2007PPASS
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission. The temporary occupancy is for only the areas as agreed upon by McCarthy Construction, Boise Fire Dept. and the Building Department. These areas include the basement, 1st floor, 2nd floor, 3rd floor, 6th floor, 7th floor and penthouse. A fire watch is to remain on the 6th and 7th floors.
BLD-Final10/19/200710/19/200710/19/2007PPART
DetailsTom Arcoraci
basement floor 1 2 3 and pent/house ok for temp occ 6 and 7 ok for shell and core future space
Temporary Occupancy10/19/20071/17/200810/19/2007 DONE
BLD-Final10/18/200710/18/200710/18/2007PDEFR
DetailsTom Arcoraci
BLD-Final10/17/200710/18/200710/18/2007ADEFR
DetailsTom Arcoraci
BLD-Conference10/10/200710/17/200710/17/2007PPASS
DetailsTom Arcoraci
BLD-Conference10/9/200710/11/200710/11/2007PPASS
DetailsTom Arcoraci
BLD-Conference10/3/200710/10/200710/10/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection10/3/200710/3/200710/4/2007PFAIL
DetailsTroy Cobbley
Inspection was to check the operation of the emergency lights and exit signs. We found out that by testing the emergency generator the pharmacy would be shut down which was not going to be acceptable by the st als people so no test was performed.
BLD-Wall cover10/2/200710/3/200710/3/2007PPART
DetailsTom Arcoraci
wip ok
FIRE-Final Inspection10/1/200710/2/200710/3/2007ACANC
DetailsTroy Cobbley
Overbooked
FIRE-Final Inspection9/28/200710/1/200710/2/2007AFAIL
DetailsTroy Cobbley
I walked through the phase 1 areas with Wayne and looked at the placement of exit signs, fire extinguishers and door hardware only. See the city approved plans for locations of deficiencies. I also noted the lack of emergency lights and exit signs on the roof top which exits people to the stairwells. An emergency generator test of the emergency lighting will need to be scheduled.
FIRE-Final Inspection9/26/20079/27/200710/1/2007ACANC
DetailsTroy Cobbley
Tom; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection9/25/20079/26/200710/1/2007ACANC
DetailsTroy Cobbley
Tom; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Conference9/26/20079/26/20079/26/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection9/24/20079/25/20079/25/2007ACANC
DetailsTroy Cobbley
TOM Phone #: ###-####
FIRE-Final Inspection9/21/20079/24/20079/24/2007ACANC
DetailsTroy Cobbley
I need the project related fire sprinkler and fire alarm passed prior to life safety.
BLD-Conference9/20/20079/21/20079/21/2007PCANC
DetailsTom Arcoraci
FIRE-Final Inspection9/19/20079/20/20079/20/2007ACANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler finaled.
FIRE-Final Inspection9/19/20079/19/20079/19/2007PCANC
DetailsTroy Cobbley
Tom, ###-####
FIRE-Final Inspection9/18/20079/18/20079/18/2007PCANC
DetailsTroy Cobbley
tom Phone #: ###-####
BLD-Conference9/18/20079/18/20079/18/2007PCANC
DetailsTom Arcoraci
FIRE-Final Inspection9/17/20079/17/20079/17/2007PCANC
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler are not passed yet.
FIRE-Final Inspection9/13/20079/14/20079/14/2007ACANC
DetailsTroy Cobbley
wayne - fire life safety Phone #: ###-####
FIRE-Final Inspection9/12/20079/13/20079/13/2007ACANC
DetailsTroy Cobbley
Need the related fire alarm and fire sprinkler passed first
FIRE-Final Inspection9/12/20079/12/20079/12/2007PCANC
DetailsTroy Cobbley
I spoke to wayne by phone and told him that I would not do the life safety inspection until the fire alrm and sprinklers were complete.
FIRE-Final Inspection9/7/20079/10/20079/11/2007ACANC
DetailsTroy Cobbley
tom - fire life safety Phone #: ###-####
FIRE-Final Inspection9/6/20079/7/20079/7/2007ACANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled first.
FIRE-Final Inspection9/5/20079/5/20079/5/2007PCANC
DetailsTroy Cobbley
As stated in the previous entries no life safety inspection will be performed until the related fire alarm and fire sprinkler permits are finaled. No inspection was performed.
Attached Document  9/5/2007 DONE
FD approved a revised Phase 1 agreement. Copy attached.
FIRE-Final Inspection8/31/20079/4/20079/4/2007ACANC
DetailsTroy Cobbley
I left a message with Toms secretary that I would not perform the life safety inspection until the alarm and fire sprinkler permits have been completed as was previously stated.
Plan resubmittals received  8/30/2007  
received transmittal letter from one company including "2" sheets of PP-101F-4, PP-102F-4 --plans taken to Lee Rice
BLD-Conference8/28/20078/29/20078/29/2007PPASS
DetailsTom Arcoraci
see tom
Telephone call  8/29/2007 DONE
Separate telcons today with Tom Hayes, McCarthy Const and Darrel Fugate, St Als, Facility Dir. regarding how to expedite final approval for "move-in" approval. I confirmed we are following the signed agreement. Extra manpower has been and will continue to be provided for inspection work but much work yet remains to be done.
We have been providing ½ day inspections on the FA system on a regular basis. The ½ day FA inspection today, found only 12 items resolved, of the 59 items on the correction list from yesterday. A copy of the latest "punch list" of the FA system was faxed to Mr. Fugate, at his request.
We also received an email at 2:30pm today from TVFP indicating they have "5 more sheets that need to be resubmitted for changes requested by the owner". I don't know if those sheets refer to work within Area 1, but I explained we do not have the capability to review, issue and inspect those sheets by Friday. We have been witnessing hydro-tests and conducting rough-in inspections of the sprinkler systems as work is completed.
A "final" was requested for today but that was not completed due to manpower limitations.
I explained we do not have the manpower to do Fire/Life safety inspections simultaneously with sprinklers and alarms. We normally leave F/LS inspections until after the sprinkler and alarm systems have been passed.
They asked if there is any way they could provide extra manpower to assist. I indicated the contractors could use additional skilled persons to pre-inspect their work and generate the type of "punch lists" the City inspectors have been providing. That would greatly reduce the City inspection workload and would speed up the final inspection process by the City inspectors. This would apply to the fire/life safety aspects, as well as to alarms and sprinklers.
BLD-Wall cover8/28/20078/28/20078/28/2007PCANC
DetailsTom Arcoraci
Telephone call  8/16/2007 DONE
the following email was sent to Jeff Cramer,
Jeff,
It is correct that any alarm installation work is required by Code to comply with NFPA 72 installation rules. As to your comment that they are not required, I will have to have the fire inspector evaluate each space according to IFC 907.2.12.1 (1) before we can confirm whether they are required or not. The Mechanical and Building inspectors (Alan Hauser and Tom Arcoraci) should also be in agreement before a final decision is made to remove them.
Regards,
Sam
BLD-Other8/3/20078/3/20078/3/2007PPASS
DetailsTom Arcoraci
BLD-Conference8/2/20078/2/20078/2/2007PPASS
DetailsTom Arcoraci
area 1 ok for move in of owner items pending other inspectors
BLD-Other8/2/20078/2/20078/2/2007APASS
DetailsTom Arcoraci
BLD-Wall cover7/31/20078/1/20078/1/2007ACANC
DetailsTom Arcoraci
BLD-Wall cover7/25/20077/26/20077/26/2007ACANC
DetailsTom Arcoraci
BLD-Wall cover7/25/20077/25/20077/25/2007PCANC
DetailsTom Arcoraci
BLD-Wall cover7/18/20077/18/20077/18/2007PCANC
DetailsTom Arcoraci
BLD-Conference7/6/20077/11/20077/11/2007PPASS
DetailsTom Arcoraci
wip ok 2 3 floor
BLD-Wall cover7/5/20077/6/20077/6/2007ACANC
DetailsTom Arcoraci
BLD-Wall cover7/5/20077/5/20077/5/2007PCANC
DetailsTom Arcoraci
BLD-Wall cover6/27/20076/27/20076/27/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Other6/18/20076/18/20076/18/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover6/5/20076/6/20076/6/2007PPART
DetailsTom Arcoraci
wip ok
BLD-Wall cover5/31/20075/31/20075/31/2007PPASS
DetailsTom Arcoraci
wip ok
Telephone call  5/31/2007 DONE
Call from Tom arcoraci concerning elevator controls and wall signal being penetrations of the 2-hour elevator shaft and protection requirements.
BLD-Wall cover5/23/20075/23/20075/23/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover5/9/20075/9/20075/9/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover5/1/20075/2/20075/2/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover4/18/20074/25/20074/25/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover4/16/20074/18/20074/18/2007PPASS
DetailsTom Arcoraci
wip
BLD-Wall cover4/10/20074/11/20074/12/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Other4/5/20074/11/20074/11/2007APASS
DetailsTom Arcoraci
wip ok
BLD-Other4/2/20074/3/20074/3/2007PPASS
DetailsTom Arcoraci
ben 2 wip ok
BLD-Wall cover3/28/20073/28/20073/28/2007PPASS
DetailsTom Arcoraci
wip ok
Meeting  3/23/2007 DONE
Fire Marshal approved written plan for early occupancy under a 3-phased occupancy approach. Copy attached.
BLD-Wall cover3/21/20073/21/20073/21/2007PPASS
DetailsTom Arcoraci
wip ok
Telephone call  3/16/2007 DONE
I called James Fisher, PM, McCarthy, (###-####) and discussed his letter dated March 12, 2007 requesting approval of a plan for phased, early move-in and temporary occupancy of the tower. We agreed on revised wording for clarification and he will revise and resubmit the letter next week.
BLD-Wall cover3/13/20073/14/20073/14/2007APASS
DetailsTom Arcoraci
see tom wip ok
BLD-Wall cover3/1/20073/5/20073/5/2007PPASS
DetailsTom Arcoraci
see tom wip ok
BLD-Wall cover3/1/20073/1/20073/1/2007APASS
DetailsTom Arcoraci
BLD-Wall cover2/5/20072/14/20072/14/2007PPASS
DetailsJim Storey
see tom at 1:30 ###-#### fourth floor verified pipe collors in place at traps.
BLD-Wall cover1/31/20072/6/20072/6/2007PPASS
DetailsTom Arcoraci
wip
BLD-Wall cover2/5/20072/5/20072/5/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover1/31/20071/31/20071/31/2007PPASS
DetailsTom Arcoraci
see tom
BLD-Conference1/23/20071/24/20071/24/2007PPASS
DetailsTom Arcoraci
BLD-Conference1/22/20071/22/20071/22/2007PPASS
DetailsTom Arcoraci
BLD-Conference1/18/20071/19/20071/19/2007APASS
DetailsTom Arcoraci
BLD-Wall cover1/17/20071/18/20071/18/2007PPART
DetailsTom Arcoraci
BLD-Wall cover1/17/20071/17/20071/18/2007PPART
DetailsTom Arcoraci
wip
BLD-Wall cover1/9/20071/10/20071/10/2007PFAIL
DetailsTom Arcoraci
eng jud for floor pents not approved
BLD-Conference1/5/20071/5/20071/5/2007PPASS
DetailsTom Arcoraci
BLD-Wall cover12/21/200612/21/200612/21/2006PCANC
DetailsTom Arcoraci
see tom
BLD-Other12/15/200612/15/200612/15/2006PPASS
DetailsTom Arcoraci
wip ok
BLD-Other12/4/200612/5/200612/5/2006PPASS
DetailsTom Arcoraci
see tom disc on fire stopping
BLD-Wall cover11/29/200612/1/200612/1/2006ANR
DetailsTom Arcoraci
see tom 8 am
BLD-Wall cover11/28/200611/29/200611/29/2006PPASS
DetailsTom Arcoraci
tower
BLD-Conference11/15/200611/21/200611/21/2006APART
DetailsTom Arcoraci
10:30 tower
BLD-Wall cover11/14/200611/15/200611/15/2006PPASS
DetailsTom Arcoraci
curtain wall nr
BLD-Wall cover11/14/200611/15/200611/15/2006APART
DetailsTom Arcoraci
tower
BLD-Final11/9/200611/15/200611/14/2006PCANC
DetailsTom Arcoraci
tower insp see tom
BLD-Wall cover11/14/200611/14/200611/14/2006PPART
DetailsTom Arcoraci
fire joint
BLD-Wall cover11/1/200611/8/200611/8/2006PPASS
DetailsTom Arcoraci
tower insp wip ok n/ east 2nd floor
BLD-Wall cover11/1/200611/8/200611/8/2006APASS
DetailsTom Arcoraci
tower insp wip
BLD-Wall cover10/25/200611/1/200611/1/2006PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover10/24/200610/25/200610/25/2006PPASS
DetailsTom Arcoraci
wip ok
BLD-Other10/12/200610/18/200610/18/2006PPASS
DetailsTom Arcoraci
tower insp wip ok
BLD-Wall cover10/4/200610/11/200610/11/2006PPASS
DetailsTom Arcoraci
tower insp wip ok
BLD-Wall cover10/6/200610/6/200610/6/2006PPASS
DetailsTom Arcoraci
conf on smoke partions and barriers
BLD-Wall cover10/4/200610/5/200610/5/2006PPART
DetailsTom Arcoraci
1:30 pm 3rd floor cover marked on plan 2nd floorcover of ops 1-6 ok except at smoke barrier needs design for gas lines ect in wall
BLD-Conference9/27/200610/4/200610/4/2006PPASS
DetailsTom Arcoraci
tower insp 2nd floor ops 1-6 ok need to check cont of s/b and f/stop of 6 in pvc drains
BLD-Other9/19/20069/27/20069/27/2006PPASS
DetailsTom Arcoraci
tower insp 2nd floor ops mock up ok for cover hard lids ok east of ops mok up for cover
BLD-Other9/19/20069/19/20069/19/2006PPASS
DetailsTom Arcoraci
josh Note: stud wall cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 3rd floor cover
FIRE-Final Inspection9/15/20069/15/20069/15/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given for the basement mech. room. See history for FIR05-00633
BLD-Other8/3/20068/3/20068/3/2006PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/3/2006 at 7:37:27 AM. Contact: ###-####.
Partial Framing OK 3rd floor West side highlighted on master plan......few areas above ceiling line that need inspection of continuous gyp and firestopping.....check prior to appr of grid ceiling. Need to verify 1hr walls in basement and firestop penitrations prior to installation of hard lid....(2) selected small rooms.
Plan Reviewer's activity  7/28/2006 DONE
Joshua Knauf, McCarthy Building companies, submitted for approval U.L. CW-S-2003 to replace previously approved CW-D-2044 ofr compliance with deferred submittal item #18, BLD04-02068, Cladding, Shaft & Fireproofing permit. The assembly is for a 2-hour rated perimeter fire containment system between the Wausau Curtain Wall and the edge of concrete slab per the listing. Copy of approved system with condition of approval was faxed to Joshua and copy put in inspector Tom Arcoraci's in box at Bob Archibald cubicle.
BLD-Energy code compliance6/21/20066/22/20066/22/2006APART
DetailsDave Hannah
tom ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley stage and class room area ground level ext walls ok to cover
BLD-Framing/Rough-in6/15/20066/15/20066/15/2006PPART
DetailsDave Hannah
Tom Hayes; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt stage and class room area ground level ok to insulate ext wall and one side int walls
BLD-Framing/Rough-in3/30/20063/30/20063/30/2006PPART
DetailsTom Arcoraci
tom hayes; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa basement walls ok
BLD-Framing/Rough-in3/20/20063/20/20063/20/2006PPART
DetailsDave Hannah
tom ###-#### - cover up - little stud framing ok to two side area marked on master plan in main office
Plan resubmittals received  3/15/2006  
Received 1 transmittal cover letter, 2 set of Fire stop details & product data from Power Electric and taken to Dan S.
BLD-Framing/Rough-in3/13/20063/13/20063/13/2006PPART
DetailsTom Arcoraci
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK WIP
BLD-Framing/Rough-in3/6/20063/6/20063/6/2006PPART
DetailsTom Arcoraci
mccarthy construction- tom hayes; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in1/11/20061/11/20061/11/2006PPART
DetailsTom Arcoraci
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie conf on shaft at north tower area
BLD-Aging Inspection12/30/200512/30/200512/30/2005 PASS
DetailsTom Arcoraci
Plan resubmittals received  10/20/2005 DONE
Received 1 letter to George S., 1 elevation @ beam penetration,1 plan scetion@ beam /2 hr wall taken to Dan S.
Plan resubmittals received  10/17/2005 DONE
Received 1 Letter to George S.,1 beam /2 hr wall,beam penetration. taken to Dan S.
Issue PAID IN FULL permit  9/30/2005 DONE
Routing - PLAN CHECK8/29/2005 9/20/2005 PASS
Architect provided letter describing requirements for 1-hour fire barriers with fire dampers at waste and linen rooms per Table 302.1.1, 2003 IBC with updated mechanical sheets as deferred submittals to be provided ASAP showing compliance.
PLANS/APPL TAKEN TO FRONT DESK  9/20/2005 PASS
Permit Ready to Issue  9/20/2005 DONE
Inspection Record Card- Bld  9/20/2005 DONE
Print Occupancy Form  9/20/2005 DONE
Print Occupancy Form  9/20/2005 DONE
Telephone call  9/20/2005 DONE
Spoke with Jeff and told him permit is ready & fees///9/20/05 3:55pm BAS
Plan assigned to (DRS)3/15/2005 9/20/2005 PASS
9/20/2005 10:40:36 DRS - activity updated through activity BLDA022 from case BLD05-00633.
Meeting  9/19/2005 DONE
Met with Jeff Cramer, HDR, Architects for this project. Jeff provided letter describing requirements for fire barriers and fire dampers at all waste & linen rooms per Table 302.1.1, 2003 IBC. Mechanical sheets showing fire dampers are deferred submittals to be provided for review and approval before work is done in field.
Routing - PLUMBING8/22/2005 8/29/2005 PASS
per plans and 2003 upc and letter of response dated 8/19 05 fron hdr.
Plan resubmittals received  8/29/2005  
Received (2) copies of sheet PP-102E-4 and PP-101H. Routed to Dan S.
Routing - PLAN CHECK8/18/2005 8/22/2005 PEND
Routing to plumbing / mechanical for re-review.
Plan resubmittals received  8/19/2005  
Received (2) copies of sheet M-804. Routed to Dan S.
Routing - FIRE8/9/2005 8/18/2005 PASS
resubmittal acceptable. Revised review faxed to architect.
Plan resubmittals received  8/11/2005 DONE
Received 1 Letter to Sam R. Taken to Dan S.
Routing - PLAN CHECK6/2/2005 8/9/2005 PEND
No resubmittals required. Routing to fire code analyst for re-review.
Plan resubmittals received  7/21/2005  
Received (2) copies of Door and Hardware Schedule, Building Model Summary and Structural Calcs. Also received (2) copies of sheet: G-004-4,G-100-4,G-101-4,G-102-4,G-103-4,G-104-4,G-105-4,G-106-4,G-107-4,G-108-4,G-109-4,G-110-4,AD-101B-4,A-100-4,A-100E-4,A-100-EX-3,A-101-4,A-101B-4,A-101E-4,A-101EX-3,A-101F-4,A-101FX-3,A-102-4,A-102E-4,A-102EX-3,A-102F-4,A-103-4,A-103B-4,A-103BX-3,A-103E-4,A-103EX-3,A-104-4,A-104B-4,A-104BX-3,A-104E-4,A-104EX-3,A-105-4,A-105B-4,A-105E-4,A-106-4,A-106B-4
A-107-4,A-107B-4,A-108-4,A-108B-4,A-109-4,A-109B-4,A-109E-4,A-110-4,A-110B-4,A-110E-4,A-202-3,A-471-4,A-472-4,A-473-4,AC-100-4,AC-100B-4,AC-100C-4,AC-100E-4,AC-100F-4,AC-101-4,AC-101B-4,AC-101C-4,AC-101E-4,AC-101F-4,AC-102-4,AC-102B-4,AC-102C-4,AC-102E-4,AC-102F-4,AC-103-4,AC-103B-4,AC-103E-4,AC-104-4,AC-104B-4,AC-104E-4,AC-105-4,AC-105B-4,AC-105E-4,AC-106-4,AC-106B-4,AC-106E-4,AC-107-4,AC-107B-4,AC-107E-4,AC-108-4,AC-108B-4,AC-108E-4,AC-109-4,AC-109B-4,AC-109E-4,IF-101-4,IF-101B-4,IF-101C-4,IF-101E-4,IF-101F-4,IF-102-4
,IF-102B-4,IF-102C-4,IF-102E-4,IF-102F-4,IF-103-4,IF-103B-4,IF-105-4,IF-105B-4,IF-105E-4,IF-108-4,IF-108E-4,IF-109-4,IF-109B-4
IF-109E-4,Q-100B-4,Q-100E-4,Q-102B-4,Q-102F-4,Q-103E-4,Q-201-4,Q-206-4,Q-207-4,Q-210A-4,MH-100B,MH-100C,MH-100E,MH-100F,MH-101B,MH-101C,MH-101E,MH-101F,MH-102B,MH-102C,MH-102E,MH-102F,MH-103B,MH-103C,MH-103E,MH-104B,MH-104E,MH-105B,MH-105E,MH-106B,MH-106E,MH-107B,MH-107E,MH-108B,MH-108E,MH-109B,MH-109E,MH-110B,MH-110E,MP-100C,MP-101C,MP-102C,MP-103C,M-702,M-703,PP-10FE-4,PP-100E-4,PP-101E-4,PP-101F-4,PP-102B-4,PP-102F-4,PP-103B-4,PP-103E-4,PP-104B-4,PP-104E-4,PP-105B-4,PP-105E-4,PP-107B-4,PP-108B-4,PP-108E-4,PP-109B-4,PP-109E-4,EC-101B-4,EC-101E-4,EC-101F-4,EC-103E-4,EC-104B-4,EC-104E-4,EC-105B-4,EC-108B-4,EC-109B-4,EC-109E-4,EL-100E-4,EL-101B-4,EL-101E-4,EL-101F-4,EL-103E-4,EL-104B-4,EL-104E-4,EL-105B-4,EL-105E-4,EL-108B-4,EL-109B-4,EL-109E-4,EP-101B-4,EP-104B-4,EP-104E-4,EP-105B-4,EP-105E-4,EP-108B-4,EP-109B-4,S-100E,S-513. Routed to Dan S.
1st review completed  6/2/2005 FAIL
failed plumbing, plan check and fire.
Routing - FIRE5/24/2005 6/2/2005 FAIL
review faxed to architect
Routing - PLAN CHECK4/4/2005 5/24/2005 FAIL
Resubmittals required from architect. Copy of items needing corrected sent to Jeff Crammer, HDR. Routing plans to fire code analyst for review.
Plan resubmittals requested  5/24/2005 DONE
Routing - PLUMBING3/21/2005 4/4/2005 FAIL
provide the demand and loading on all med gas and vacuum piping, existing or future shall also be indicated. provide a trap or interceptor to contain oil prior to connecting elevator shaft sumps to the drainage system. domestic hot water heat exchangers must be double wall with leak detection. min. grade inside the building below slab is 1/8" per foot, gravity line picking up waste risers is too flat.
Routing - PUBLIC WORKS3/15/2005 3/21/2005 PASS
Plans ACCEPTED BY PLAN TECH  3/15/2005 DONE
Plans are in 3 sections. Routing began to PW with both of the 1st section and 1 set of mechanical. Balance of sections are in Dan Stuart's cubicle.
Application received  3/10/2005  
Recd Pcfee & Taken To Pln CK  3/10/2005  
Fee Review-notes3/10/20053/10/2005