Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00637
StatusFinaled
Name ROCKY MOUNTAIN MANAGEMENT AND DEV
Site Address 345 W BOBWHITE CT Unit: 130
Project NameLOGGER CREEK PLAZA-1ST FLR
Customer Number 
ePlanReviewNo
Description
(XEROX)(LOGGER CREEK PLAZA-1ST FLR) To remodel a 1517 sq ft portion of the 1st floor for a new office tenant. Work to include, selective demolition, construction of a noncombustible tenant demising wall, Remodel entry door by installation of a new 20-minute rated door and 45 minute side-lite, relocate light fixtures and new Hvac ducting and registers to existing hvac system, This building is fully fire sprinklered for one-hour substitution, any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/20051/10/2006 DONE
Second Notice has not been responded to.
Telephone call  1/4/2006 DONE
Re-faxed 2nd notice due to discrepancies in final values///1/4/06 BAS
Second Notice BLD9/20/20059/20/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 8/12/20059/20/2005 DONE
BLD-Aging Inspection8/12/20058/12/20058/12/2005 PASS
DetailsJim Storey
DOC - Permit Finaled8/12/20058/12/20058/12/2005PPASS
DetailsJim Storey
BLD-Final6/8/20056/9/20056/9/2005PPASS
DetailsJim Storey
rob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok
FIRE-Final Inspection6/8/20056/9/20056/9/2005APASS
DetailsForrest France
Fire life safety passed inspection. CO request paperwork was not available for signature at the time of inspection.
Permanent Occupancy 6/9/20056/9/2005 DONE
Details
BLD-Final6/1/20056/2/20056/2/2005PCANC
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection6/1/20056/2/20056/2/2005AFAIL
DetailsForrest France
Provide cfm on HVAC units to verify if duct smoke detection is required, provide suite address, demonstrate operation of vault door hardware-that it may be opened from the inside under any condition.
BLD-Framing/Rough-in4/26/20054/26/20054/26/2005PFAIL
DetailsTom Arcoraci
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles cn posted; wall not to be attached to grid and brace per plan
Issue PAID IN FULL permit  3/16/2005 DONE
Inspection Record Card- Bld  3/14/2005 DONE
Print Occupancy Form  3/14/2005 DONE
Permit Ready to Issue  3/14/2005 DONE
Application received  3/11/2005  
Recd Pcfee & Taken To Pln CK  3/11/2005 DONE
Plans ACCEPTED BY PLAN TECH  3/11/2005  
Plan assigned to (R_H)3/11/2005 3/11/2005 PASS
3/11/2005 14:05:07 RMH - activity updated through activity BLDA022 from case BLD05-00637.
Routing - PLAN CHECK3/11/2005 3/11/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/11/2005 DONE
1st review completed  3/11/2005 PASS
1st review completed  3/11/2005 PASS