Second Notice BLD | 7/13/2005 | 7/13/2005 | 8/30/2005 | | DONE |
|
|
|
Done
|
First Notice | | 6/7/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 6/7/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10630 issued 6-7-05 to Cypress in the Emerald Tech Bldg.
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Dave Hannah
|
|
|
###-#### - JIM ok for perm occ
|
FIRE-Final Inspection | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | NR |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | FAIL |
Troy Cobbley
|
|
|
Exit signs inside corrected. Now waiting on the exit discharge lighting
|
Permanent Occupancy | | 6/6/2005 | 6/6/2005 | | DONE |
|
|
|
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 4:40:18 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | FAIL |
Troy Cobbley
|
|
|
Electrician has not completed the installation of the emergency lights, exit signs and exit discharge lights. Cubicle layout has changed. I went over a modified layout of the exit signs with the electrician. Still need suite numbers.
|
BLD-Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 3:28:24 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit signs, exit discharge lighting and emergency lights per approved drawing sheet E2.1L, provide suite numbers and TI sprinkler drawings
|
BLD-Final | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | NR |
Jim Sly
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | CANC |
Troy Cobbley
|
|
|
Need shell permit finaled before this inspection will take place.
|
BLD-Other | 5/16/2005 | 5/16/2005 | 5/16/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 8:24:48 AM. Contact: (208) NORTH END OK
|
BLD-Framing/Rough-in | 5/12/2005 | 5/13/2005 | 5/13/2005 | P | PART |
Jim Sly
|
|
|
ceiling grid inspection please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore S 1/2 of bldg OK. 5/13/2005 1:53:18 PM
|
BLD-Framing/Rough-in | 5/12/2005 | 5/13/2005 | 5/13/2005 | P | PART |
Jim Sly
|
|
|
ceiling grid inspection please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore S. 1/2 of Bldg... grid OK. 5/13/2005 1:05:20 PM
|
BLD-Framing/Rough-in | 4/19/2005 | 4/20/2005 | 4/20/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 12:59:29 PM. Contact: ###-####. full height walls need slip track per detail 1/A8.1, all other walls ok to cover 4/20/2005 9:31:55 AM
|
BLD-Framing/Rough-in | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK from Hall (114) to the South ext wall (except restrooms). 4/18/2005 2:12:53 PM
|
BLD-Energy code compliance | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Ext walls OK 4/18/2005 2:10:02 PM
|
Plan assigned to (CJW) | 3/16/2005 | | 4/15/2005 | | PASS |
|
|
|
4/15/2005 10:47:01 CJW - activity updated through activity BLDA022 from case BLD05-00656.
|
Routing - PLAN CHECK | 4/11/2005 | | 4/15/2005 | | PASS |
|
|
|
(4-13-05) Completed the resubmittal review. Some items were not resolved. E-mailed the revised report to the Architect.
(4-15-05) Approved drawings after 2nd resubmittal review.
|
Plan resubmittals received | | | 4/15/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/15/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/15/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2005 | | DONE |
|
|
|
lft message with secretary ###-#### that permit and fees are ready to be picked up
|
Issue PAID IN FULL permit | | | 4/15/2005 | | DONE |
|
|
|
|
Routing - FIRE | 4/5/2005 | | 4/11/2005 | | PASS |
|
|
|
review comments faxed to architect.
|
Plan Reviewer's activity | | | 4/11/2005 | | DONE |
|
|
|
PARTIAL PERMIT ISSUED on this date at request of Bob Hosac.
|
1st review completed | | | 4/11/2005 | | FAIL |
|
|
|
failed plan check.
|
Plan resubmittals received | | | 4/8/2005 | | DONE |
|
|
|
Resubmittals received and forwarded to Carl Westfall: Cover letter from architect and 3 copies of plan sheets A0, A2.1, A3.1, A7.1, A8.2, A8.2 and E2.1L.
|
Routing - PLUMBING | 4/4/2005 | | 4/5/2005 | | PASS |
|
|
|
increase breakroom vent to two inch to make the required 12.56 sq in. max water temp. at public lavs is 120 deg. must use mixing valve or temp. limiting stops at faucet.
|
Routing - PLANNING | 4/4/2005 | | 4/4/2005 | | PASS |
|
|
|
Approved per DRH04-00031 and CUP04-00107. CUP04-00107 allows the office use in the industrial zone.
|
Routing - PLAN CHECK | 3/21/2005 | | 4/4/2005 | | FAIL |
|
|
|
IBC plan review started April 1, 2005 and was finished April 4, 2005. Resubmitted drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 3/16/2005 | | 3/21/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2005 | | |
|
|
|
|
Application received | | | 3/14/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2005 | | DONE |
|
|
|
|