Permit Information
Permit NumberBLD05-00656
StatusFinaled
Name STEED CONSTRUCTION
Site Address 10147 W EMERALD ST Unit: 102
Project NameEMERALD TECH BLDG #9
Customer Number 
ePlanReviewNo
Description
(CYPRESS - EMERALD TECH BLDG #9) (Partial permit issued 4/11/05 issued to allow rough in of elect/plmbg/hvac only-see condition attached to permit.) This building is fire sprinklered for building area increase. To construct a 16,422 square foot office tenant space within an existing 18,100 square foot, one story building. Work is to include 2 restrooms accessible to the disabled, a shower room accessible to the disabled, interior nonbearing walls, a folding partition, suspended ceilings, millwork, and finishes. All work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with 2002 NFPA 13 as regulated by the Fire Department. CUP04-00107 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/13/20057/13/20058/30/2005 DONE
Done
First Notice 6/7/20057/13/2005 DONE
Permanent occupancy UNPAID FEE  6/7/2005 DONE
Perm. Occ. Cert. # 10630 issued 6-7-05 to Cypress in the Emerald Tech Bldg.
BLD-Final6/6/20056/6/20056/6/2005PPASS
DetailsDave Hannah
###-#### - JIM ok for perm occ
FIRE-Final Inspection6/6/20056/6/20056/6/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final6/3/20056/6/20056/6/2005ANR
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection6/3/20056/6/20056/6/2005AFAIL
DetailsTroy Cobbley
Exit signs inside corrected. Now waiting on the exit discharge lighting
Permanent Occupancy 6/6/20056/6/2005 DONE
Details
BLD-Final6/2/20056/3/20056/3/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/2/2005 at 4:40:18 PM. Contact: ###-####.
FIRE-Final Inspection6/2/20056/3/20056/3/2005AFAIL
DetailsTroy Cobbley
Electrician has not completed the installation of the emergency lights, exit signs and exit discharge lights. Cubicle layout has changed. I went over a modified layout of the exit signs with the electrician. Still need suite numbers.
BLD-Final6/1/20056/2/20056/2/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/1/2005 at 3:28:24 PM. Contact: ###-####.
FIRE-Final Inspection6/1/20056/2/20056/2/2005PFAIL
DetailsTroy Cobbley
Provide exit signs, exit discharge lighting and emergency lights per approved drawing sheet E2.1L, provide suite numbers and TI sprinkler drawings
BLD-Final5/31/20055/31/20055/31/2005PNR
DetailsJim Sly
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection5/31/20055/31/20055/31/2005PCANC
DetailsTroy Cobbley
Need shell permit finaled before this inspection will take place.
BLD-Other5/16/20055/16/20055/16/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/16/2005 at 8:24:48 AM. Contact: (208) NORTH END OK
BLD-Framing/Rough-in5/12/20055/13/20055/13/2005PPART
DetailsJim Sly
ceiling grid inspection please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore S 1/2 of bldg OK. 5/13/2005 1:53:18 PM
BLD-Framing/Rough-in5/12/20055/13/20055/13/2005PPART
DetailsJim Sly
ceiling grid inspection please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore S. 1/2 of Bldg... grid OK. 5/13/2005 1:05:20 PM
BLD-Framing/Rough-in4/19/20054/20/20054/20/2005AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 4/19/2005 at 12:59:29 PM. Contact: ###-####. full height walls need slip track per detail 1/A8.1, all other walls ok to cover 4/20/2005 9:31:55 AM
BLD-Framing/Rough-in4/15/20054/18/20054/18/2005APART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK from Hall (114) to the South ext wall (except restrooms). 4/18/2005 2:12:53 PM
BLD-Energy code compliance4/15/20054/18/20054/18/2005APART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Ext walls OK 4/18/2005 2:10:02 PM
Plan assigned to (CJW)3/16/2005 4/15/2005 PASS
4/15/2005 10:47:01 CJW - activity updated through activity BLDA022 from case BLD05-00656.
Routing - PLAN CHECK4/11/2005 4/15/2005 PASS
(4-13-05) Completed the resubmittal review. Some items were not resolved. E-mailed the revised report to the Architect.

(4-15-05) Approved drawings after 2nd resubmittal review.
Plan resubmittals received  4/15/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/15/2005 DONE
Permit Ready to Issue  4/15/2005 DONE
Inspection Record Card- Bld  4/15/2005 DONE
Print Occupancy Form  4/15/2005 DONE
Print Occupancy Form  4/15/2005 DONE
Telephone call  4/15/2005 DONE
lft message with secretary ###-#### that permit and fees are ready to be picked up
Issue PAID IN FULL permit  4/15/2005 DONE
Routing - FIRE4/5/2005 4/11/2005 PASS
review comments faxed to architect.
Plan Reviewer's activity  4/11/2005 DONE
PARTIAL PERMIT ISSUED on this date at request of Bob Hosac.
1st review completed  4/11/2005 FAIL
failed plan check.
Plan resubmittals received  4/8/2005 DONE
Resubmittals received and forwarded to Carl Westfall: Cover letter from architect and 3 copies of plan sheets A0, A2.1, A3.1, A7.1, A8.2, A8.2 and E2.1L.
Routing - PLUMBING4/4/2005 4/5/2005 PASS
increase breakroom vent to two inch to make the required 12.56 sq in. max water temp. at public lavs is 120 deg. must use mixing valve or temp. limiting stops at faucet.
Routing - PLANNING4/4/2005 4/4/2005 PASS
Approved per DRH04-00031 and CUP04-00107. CUP04-00107 allows the office use in the industrial zone.
Routing - PLAN CHECK3/21/2005 4/4/2005 FAIL
IBC plan review started April 1, 2005 and was finished April 4, 2005. Resubmitted drawings were required. See the plan review report.
Routing - PUBLIC WORKS3/16/2005 3/21/2005 PASS
Plans ACCEPTED BY PLAN TECH  3/15/2005  
Application received  3/14/2005  
Recd Pcfee & Taken To Pln CK  3/14/2005 DONE