Permit Information
Permit NumberBLD05-00669
StatusFinaled
Name FULTON STREET LLC
Site Address 705 W FULTON ST
Project NameTABLEROCK BUILDING
Customer Number 
ePlanReviewNo
Description
(TABLEROCK BLDG-BASEMENT/1ST FLR/MEZZANINE-OFFICE AREAS) To remodel two areas of the shell for future tenant spaces, the first floor area is 535 sq ft and will include a 117 sq ft mezzanine area, the basement area is 878 sq ft. Work to include, on the first floor, construction of a mezzanine, installation of a spiral stair case, and miscelaneous related finishes, the basment area will include interior partitions, new lighting, and remodel to the stairway to the exterior, miscelaneous related interior finishes. There is NO occupancy allowed under this permit, a separate permit will be required to occupy these tenant spaces. This building is PARTIALLY FIRE SPRINKLERED. The fire sprinkler is located in this area. This area of the building is separated from the rest of the building by a two hour fire barrier wall, to separate fire areas. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD8/8/20078/8/200710/2/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD7/23/20077/23/20078/8/2007 DONE
First Notice has not been responded to.
First Notice7/11/20077/11/20077/23/2007 DONE
DetailsDave Hannah
BLD-Final7/11/20077/11/20077/11/2007PPASS
DetailsDave Hannah
CHRIS Phone #: ###-####
DOC - Permit Finaled7/11/20077/11/20077/11/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection6/29/20077/2/20077/2/2007PPASS
DetailsTroy Cobbley
life safety passed
Inspection Record Card- Bld  6/22/2007 DONE
BLD-Wall cover2/6/20072/7/20072/7/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/6/2007 at 6:21:22 PM. Contact: ###-####. framing pass
Inspection Record Card- Bld  2/7/2007 DONE
BLD-Final7/7/20057/8/20057/8/2005PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/7/2005 at 1:18:32 PM. Contact: ###-####. needs occ card ie occ permit for this area
FIRE-Final Inspection7/7/20057/8/20057/8/2005APART
DetailsForrest France
Fire life safety is satisfactory for the basement portion of this permit. The entirely separate 1st floor office and mezzanine are not completed at this time.
FIRE-Final Inspection7/1/20057/5/20057/5/2005PFAIL
DetailsForrest France
Building suite address not yet posted, fire ext. provided but not mounted, fire sprinkler hangers below stairs have been removed.
BLD-Final7/1/20057/5/20057/5/2005PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/1/2005 at 3:21:05 PM. Contact: ###-####. ok for basement when fire signs off check handrail at mis permit
BLD-Footing6/18/20056/20/20056/20/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/18/2005 at 11:41:15 AM. Contact: ###-####.
BLD-Final6/13/20056/14/20056/14/2005PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/13/2005 at 1:02:15 PM. Contact: ###-####.
FIRE-Final Inspection6/13/20056/14/20056/14/2005PFAIL
DetailsForrest France
Provide building address, provide fire ext. with current tag mounted in basement, install 2nd piece canopies on SW heads. Contractor seeks TO for basement area.
BLD-Framing/Rough-in4/26/20054/27/20054/27/2005APART
DetailsDave Hannah
wall cover tim --###-#### OK TO COVER BASEMENT
Inspection Record Card- Bld  4/26/2005 DONE
Issue PAID IN FULL permit  4/26/2005 DONE
Case Summary (BLD)  4/25/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/25/2005 DONE
Routing - PLAN CHECK4/11/2005 4/25/2005 PASS
Plan assigned to (R_H)3/17/2005 4/25/2005 PASS
4/25/2005 09:41:36 RMH - activity updated through activity BLDA022 from case BLD05-00669.
Plan resubmittals received  4/22/2005 DONE
Received Transmittal , 1Project start up for special inspections, & 2 Copys of sheet A4.11 Taken to Ron H.
Plan resubmittals received  4/14/2005 DONE
Received Transmittal , 1 Letter,1 Roof /skylight , Calcs , & 2 Copys of sheets A0.01,A0.11,A4.11,A6.11, S1.1 Taken to Ron H.
1st review completed  4/11/2005 FAIL
failed plan check.
Routing - FIRE4/6/2005 4/11/2005 PASS
Pass with annotation that a fire sprinkler permit is required; no written review comments required.
Case Summary (BLD)  4/6/2005 DONE
Routing - PLAN CHECK3/21/2005 4/6/2005 FAIL
Faxed and mailed corrections to the fire department on 5/6/05, routed plans to fire department same day.
Routing - PUBLIC WORKS3/17/2005 3/21/2005 PASS
Pending Assignment by MYS3/14/2005 3/17/2005 DONE
3/17/2005 10:14:49 MYS - activity updated through activity BLDA175 from case BLD05-00669.
Plans ACCEPTED BY PLAN TECH  3/16/2005  
Application received  3/14/2005  
Recd Pcfee & Taken To Pln CK  3/14/2005  
Fee Review-notes3/14/20053/14/2005