BLD-Final | 10/10/2005 | 10/11/2005 | 10/11/2005 | P | PASS |
Tony Young
|
|
|
angela; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 10/11/2005 | 10/11/2005 | 10/11/2005 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 10/5/2005 | 10/10/2005 | 10/10/2005 | P | NR |
Tony Young
|
|
|
angela; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Grading Inspection | 10/7/2005 | 10/7/2005 | 10/7/2005 | | BOND |
|
|
|
Grading and drainage has been completed according to the approved plan. However, revegetation has not been completed. For this the engineer has recommended a $200.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 7/7/2005 | 7/7/2005 | 7/8/2005 | P | PASS |
Dave Hannah
|
|
|
angie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover
|
BLD-Framing/Rough-in | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PART |
Tony Young
|
|
|
angie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted on truss engineer sheet,, ok to insulate after fixes
|
BLD-Foundation | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PART |
Tony Young
|
|
|
angie Note: shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ext. shear ok
|
BLD-Framing/Rough-in | 6/28/2005 | 6/29/2005 | 6/29/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 4:31:08 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | FAIL |
Dave Hannah
|
|
|
angela Note: shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles missing hold downs fl/fl strapes and panels not nailed
|
BLD-Foundation | 5/10/2005 | 5/11/2005 | 5/11/2005 | A | PART |
Tony Young
|
|
|
angela; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Tony Young
|
|
|
angela ; Phone #: ###-#### Internet Inspection Request from: Letitia Mes
property lines/ alley,,, looks ok now,,, pin is in alley roadway,, but road curves and makes it appear off 5/5/2005 1:36:15 PM
|
BLD-Footing | 5/4/2005 | 5/4/2005 | 5/4/2005 | P | PART |
Tony Young
|
|
|
angela ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
setbacks appear ok,, but look off ,due to curve in alley 5/5/2005 1:32:52 PM
|
PubWorks Subgrade Approval | 3/22/2005 | 3/22/2005 | 5/4/2005 | | PASS |
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
Plan assigned to (SAM) | 3/17/2005 | 4/15/2005 | 4/21/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/20/2005 | | 4/21/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 4/21/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2005 | | DONE |
|
|
|
tlk to angela comish - ###-#### that permit and fees are ready to be picked up
|
Override - Activity Holds | | | 4/21/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/21/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 4/21/2005 | | |
|
|
|
|
Issue & PRINT permit | | | 4/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2005 | | DONE |
|
|
|
telcon with Angela Comish re need for site plan (2 copies) showing compliant FD vehicle access. She will bring it in later today.
|
Plan resubmittals received | | | 4/19/2005 | | DONE |
|
|
|
Received Transmittal, & 2 Copys of sheet1 Per Sam R. Taken to him.
|
Routing - FIRE | 4/19/2005 | | 4/19/2005 | | PASS |
|
|
|
resbumittal shows acceptable FD access is existing.
|
Routing - FIRE | 4/15/2005 | | 4/15/2005 | | FAIL |
|
|
|
Routed to Sam Rogers. Nothing new for fire to review. Called applicant and advised.
|
Routing - PLAN CHECK | 4/3/2005 | | 4/15/2005 | | PASS |
|
|
|
|
Telephone call | | | 4/14/2005 | | DONE |
|
|
|
phone message from "Angie" explaing it is a shared drive, 80' long. I called back left message we will need revised plans clearly showing the intended FD access drive. If it does not meet access requirementnts writtten approval form the Fire Marshall will be necessary.
|
Routing - PLANNING | 4/1/2005 | | 4/1/2005 | | PASS |
|
|
|
Met w/ applicant and redlined drawings. Driveway to be a maximum of 33' wide as redlined. CER
|
Routing - Erosion and Sediment | 4/1/2005 | | 4/1/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 4/1/2005 | | 4/1/2005 | | FAIL |
|
|
|
Fire dept access is not shown on plans. Plans show a common drive serving two lots but insufficient information is provided to determine if it meets FD access requirements. This plan will require Fire Marshal review for approval.
|
Routing - PLANNING Land Div | 3/22/2005 | | 3/28/2005 | | PASS |
|
|
|
Approved as Parcel B on ROS02-00079. ROS 6194 recorded on June 20, 2003.
|
Routing - PLANNING | 3/28/2005 | | 3/28/2005 | | FAIL |
|
|
|
Fail: Driveway width in front setback, and interior garage width. Left message w/ applicant at 11:15a.m. today. CER
|
Routing - PUBLIC WORKS | 3/22/2005 | | 3/22/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/18/2005 | | 3/22/2005 | | PASS |
|
|
|
Approved as Category 3
|
Application received | | | 3/17/2005 | | |
|
|
|
|