Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00709
StatusFinaled
Name HIGHLANDS BUILDING GROUP
Site Address 4393 N TIVERTON PL
Project NameHillside
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, four bathroom 5279 sq. ft. three story single family dwelling (2654 sq. ft. first floor/2250 sq. ft. second floor/375 sq. ft. third floor) with a attached 914 sq. ft. three car garage and a 553 sq. ft. deck off the second floor master bedroom and bonus room. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/9/20062/10/20062/10/2006APASS
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
DOC - Permit Finaled2/10/20062/10/20062/10/2006PPASS
DetailsJim Storey
BLD-Grading Inspection2/8/20062/8/20062/8/2006 DONE
Final grading and drainage approved
BLD-Energy code compliance9/22/20059/26/20059/26/2005APASS
DetailsTony Young
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in9/20/20059/21/20059/21/2005APART
DetailsMike Jordan
rick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. L brace gable ends at north side of house. Complete nailing on simpson hangars at ML beams.
BLD-Framing/Rough-in9/19/20059/20/20059/20/2005APASS
DetailsMike Jordan
shear nail and RI //rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All non-conformances have been amended.
BLD-Framing/Rough-in9/16/20059/19/20059/19/2005PCANC
DetailsJim Storey
rick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in9/15/20059/16/20059/16/2005APART
DetailsDave Hannah
rick Note; shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext but need to install two hd hold downs back wall where windows were change on back wall
BLD-Framing/Rough-in9/15/20059/15/20059/15/2005PFAIL
DetailsMike Jordan
rick///shear nail inspection please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Missing mstc40 straps from floor to floor at back of house.
BLD-Framing/Rough-in8/5/20058/8/20058/9/2005APART
DetailsTony Young
shear nail on exterior///rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
exterior shear ok
BLD-Framing/Rough-in7/28/20057/29/20057/29/2005ANR
DetailsTony Young
shear nail inspection///rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation5/31/20055/31/20055/31/2005PPART
DetailsTony Young
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing5/27/20055/27/20055/27/2005PPASS
DetailsMike Jordan
jed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
PubWorks Subgrade Approval3/19/20053/19/20055/23/2005 PASS
Footing subgrade approved by the geotechnicl engineer. 5/23/05

A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
Override - Activity Holds  5/5/2005  
Issue PAID IN FULL permit  5/5/2005  
OVERRIDE  5/3/2005  
Telephone call  5/3/2005 DONE
left mess that permit is ready
Override - Activity Holds  5/3/2005  
Inspection Record Card- Bld  5/3/2005 DONE
Print Occupancy Form  5/3/2005 DONE
Override - Activity Holds  5/3/2005  
Permit Ready to Issue  5/3/2005 DONE
Plan assigned to (SAM)3/18/20054/26/20055/2/2005 PASS
5/2/2005 16:05:00 SAM - activity updated through activity BLDA022 from case BLD05-00709.
Routing - PLAN CHECK4/3/2005 5/2/2005 PASS
Case Summary (BLD)  5/2/2005  
PLANS/APPL TAKEN TO FRONT DESK  5/2/2005 DONE
Plan Reviewer's activity  4/27/2005 DONE
4/27/05 09:50 I called and left a message for Pat with Lochsa. I need him to re-look at the engineering so the loads and design matches the house. Plans are on hold.
Routing - Erosion and Sediment4/1/2005 4/1/2005 PASS
ESC plan approved with attached conditions.
Routing - FIRE4/1/2005 4/1/2005 PASS
No fire sprinklers required (Highlands Hackberry #4)
Routing - PLANNING3/21/2005 4/1/2005 PASS
approved 03/22/05 - mistake in routing
Routing - PUBLIC WORKS3/19/2005 3/21/2005 PASS
Routing - PUBLIC WORKS GRADING3/18/2005 3/19/2005 PASS
Approved as Category 3
Application received  3/18/2005