BLD-Final | 6/14/2006 | 6/14/2006 | 6/14/2006 | P | PASS |
Dave Hannah
|
|
|
Derek, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
DOC - Permit Finaled | 6/14/2006 | 6/14/2006 | 6/14/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | FAIL |
Dave Hannah
|
|
|
Derek; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs elec final needs smoke dectors needs handrails with returns ok to leave second floor area unfinish if all other trades can final
|
BLD-Final | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | DEFR |
Dave Hannah
|
|
|
Derek; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 3/9/2006 | 3/9/2006 | 3/10/2006 | P | PART |
Dave Hannah
|
|
|
derrick -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hand rail on outside front stairs
|
BLD-Energy code compliance | 12/9/2005 | 12/12/2005 | 12/12/2005 | A | PASS |
Dave Hannah
|
|
|
derek; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 12/5/2005 | 12/5/2005 | 12/5/2005 | P | PASS |
Dave Hannah
|
|
|
derrick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore all c/n itims are complete seal package is in ok to insulate
|
BLD-Framing/Rough-in | 12/1/2005 | 12/2/2005 | 12/5/2005 | A | PART |
Dave Hannah
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PART |
Mike Jordan
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Shear wall nailing ok. Verified installation of all perimeter holdowns and strapping. Will need engineering for interioir floor to floor holdowns were no wall adove exists for connection.
|
BLD-Foundation | 7/20/2005 | 7/21/2005 | 7/21/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/20/2005 at 5:24:57 PM. Contact: ###-####. wip,,,, 80%
|
BLD-Footing | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | PART |
Dave Hannah
|
|
|
derrick ###-#### ok per Jim Wylie for garage footing only//footing pour shall be in compliance with Strata letter dated 7/7/05
|
PubWorks Subgrade Approval | 5/26/2005 | 5/26/2005 | 7/8/2005 | | PASS |
|
|
|
footing subgrade for garage area approved by the geotechnical engineer with conditions: 1) limited areas measuring 3 by 6 feet and 2 by 2 feet in the east side of the garage footing trench will require over excavation of 4 inches of loose soil prior to pouring the footings. 2) The step down to the footing at the front of the garage has areas at each end that will be hand excavated to remove the loose soil to a depth of about 14 inches. These areas that will be over-excavated to native undisturbed soil will be filled with additional concrete
|
Override - Activity Holds | | | 7/8/2005 | | |
|
|
|
|
BLD-Footing | 6/17/2005 | 6/20/2005 | 6/20/2005 | A | PART |
Dave Hannah
|
|
|
###-#### brad//re-bar inspection in storage area please ok to form
|
Override - Activity Holds | | | 6/17/2005 | | |
|
|
|
|
BLD-Footing | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Dave Hannah
|
|
|
brad cooper; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie-- for the underground storage area ok to place concrete for ftgs in storage area
|
Override - Activity Holds | 1/1/1900 | 1/1/1900 | 6/6/2005 | | |
|
|
|
per rita ok for customer to do this insp for the under ground storage area
|
Override - Activity Holds | | | 6/6/2005 | | |
|
|
|
|
PubWorks Subgrade Approval | 3/18/2005 | 3/18/2005 | 5/26/2005 | | PASS |
|
|
|
The footing subgrade for the below grade storage area is acceptable. Placement of footings in this area can proceed. The footing subgrade for the below grade garage is not approved yet.
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 3/22/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/22/2005 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 3/18/2005 | | 3/21/2005 | | PASS |
|
|
|
3/21/2005 08:48:45 PEP - activity updated through activity BLDA022 from case BLD05-00725.
|
Case Summary (BLD) | | | 3/21/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/21/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 3/21/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/21/2005 | | |
|
|
|
|
Telephone call | | | 3/21/2005 | | DONE |
|
|
|
tlk to robert cooper construction ###-#### that permit and fees are ready to be picked up
|
Case Summary (BLD) | | | 3/18/2005 | | |
|
|
|
|
Override - Activity Holds | | | 3/18/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/18/2005 | | 3/18/2005 | | PASS |
|
|
|
for hillside approval
ESC plan approved with attached conditions.
|
Application received | | | 3/18/2005 | | |
|
|
|
|
Routing - PLANNING | 3/18/2005 | | | | |
|
|
|
|