Permanent Occupancy | | | 2/8/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/7/2018 | | DONE |
|
|
|
|
Third Notice BLD | 10/1/2007 | 10/1/2007 | 10/12/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 3/24/2005 | 3/24/2005 | 10/12/2007 | | DONE |
|
|
|
|
Second Notice BLD | 9/13/2007 | 9/13/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/31/2007 | 7/31/2007 | 9/13/2007 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/25/2007 | 7/25/2007 | 7/31/2007 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok si achrived.
|
Code Occupancy Approval | 4/4/2007 | 4/4/2007 | 4/4/2007 | A | PASS |
Dena Gambrel
|
|
|
4-4-07 Final Occupancy sign off. Landscape is in.
|
Code Occupancy Approval | 4/4/2007 | 4/4/2007 | 4/4/2007 | A | CANC |
Dena Gambrel
|
|
|
|
FIRE-Final Inspection | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Forrest France
|
|
|
Final fire life safety walk through passed inspection, some issues corrected while on site, previous c/n items are complete.
|
BLD-Aging Inspection | 3/6/2007 | 3/6/2007 | 3/6/2007 | | DEFR |
Jim Storey
|
|
|
to plm and fire bond cod still in place but cod permit finaled
|
BLD-Framing/Rough-in | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PASS |
Jim Storey
|
|
|
phase 3; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Code Occupancy Approval Temp | 11/30/2006 | 11/30/2006 | 11/30/2006 | P | PASS |
Dena Gambrel
|
|
|
Temp sign off. They have installed parking bumpers and In/Out markings. Bonded for the remaining landscaping.
|
BLD-Aging Inspection | 10/17/2006 | 10/17/2006 | 10/17/2006 | | FAIL |
Jim Storey
|
|
|
pending others w/cn idems.
|
Code Occupancy Approval Temp | 8/17/2006 | 8/17/2006 | 8/29/2006 | A | FAIL |
Dena Gambrel
|
|
|
08-17-06 Failed inspection. Will need to get bids for in/out marking, parking bumpers and landscape bid for the south part.
|
FIRE-Final Inspection | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | FAIL |
Troy Cobbley
|
|
|
The only life safety items looked at were the exit signs, emergency lights and the exit discharge lights. An exit discharge light is required at the main entry/exit. The overhead sprinkler system needs finaled as well as the fire alarm.
|
FIRE-Final Inspection | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
Life safety is not ready yet since emergency lighting and other permits have not been finaled
|
BLD-Other | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | PASS |
Jim Storey
|
|
|
ceilling ok need to check spreader bars at final.
|
BLD-Energy code compliance | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 5/10/2006 | 5/10/2006 | 5/11/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Final | 3/10/2006 | 3/10/2006 | 3/13/2006 | P | CANC |
Jim Storey
|
|
|
odie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | NR |
Forrest France
|
|
|
The project related fire sprinkler and alarm permit work must be finaled prior to life safety final inspection and approval.
|
Telephone call | | | 3/10/2006 | | DONE |
|
|
|
Telcon from "Odie", Steed Const. ###-#### (3/10/06; 11:30 am). He requested TOC to occupy all of new whse and 3/4 of the new offices tomorrow, indicating this is a phased project and they want to occupy Phase 1. There is no evidence of "phasing" on the building permit. Looked into sprinkler history and found many deficiencies noted at previous inspections and requirements for resubmittals which have not been responded to. So we have known significant sprinkler design/installation deficiencies; no approved plans, therefore we can't inspect; AS contractor has not requested an inspection (presumably because they are aware they are not ready since they don't have approved plans); therefore we cannot allow a TOC with the building known to be improperly protected. Denied request for TOC.
Advised DH (FM) and RC (FI) of their intent to move in this weekend; suggested a drop-in visit to verify they are not occupying illegally.
|
Code Occupancy Approval Temp | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | FAIL |
Dena Gambrel
|
|
|
03-08-06 Bond recieved in the amount of $74, 481.00 for landscape and paving.
|
BLD-Framing/Rough-in | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | PART |
Jim Storey
|
|
|
ceiling inspection//odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wire hvac termanations.
|
BLD-Energy code compliance | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PART |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PART |
Tom Arcoraci
|
|
|
odi; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north south wall at south end of building ok insulation, shear and blocking ok at east center
|
BLD-Framing/Rough-in | 11/1/2005 | 11/1/2005 | 11/1/2005 | A | PART |
Jim Storey
|
|
|
cooller roof welding ok
|
BLD-Framing/Rough-in | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | PART |
Jim Storey
|
|
|
hodie; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesok to cover studwalls need sheer atchment insp.
|
BLD-Aging Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Footing | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 7:14:45 AM. Contact: ###-####. Placement complete upon arriving on site. Did note that reinforcement and concrete inspected by special inspector.
|
BLD-Footing | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/26/2005 at 11:50:13 AM. Contact: ###-####.
|
FIRE-Conference | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | DONE |
Forrest France
|
|
|
On site discussion with Pat, the GC for this project, in regards to requirements for automatic smoke and heat vent installation as addressed in plan review notes.
|
FIRE-Conference | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | CANC |
Forrest France
|
|
|
Cancel inspection per Pat the GC, he will re-schedule the confrence at a later date.
|
Issue PAID IN FULL permit | | | 6/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/14/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2005 | | DONE |
|
|
|
talked to wesley steele at ###-#### is ready & need achd
|
Plan assigned to (MLO) | 3/25/2005 | | 6/13/2005 | | PASS |
|
|
|
6/13/2005 11:26:54 MLO - activity updated through activity BLDA022 from case BLD05-00775.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2005 | | DONE |
|
|
|
|
Routing - FIRE | 6/8/2005 | | 6/10/2005 | | PASS |
|
|
|
resubmittal acceptable, review faxed to architect.
|
Plan resubmittals received | | | 6/8/2005 | | DONE |
|
|
|
Received 1 Letter for Sam R. & 4 Copys of sheet A1.1 Taken to Mike O.
|
Routing - FIRE | 5/26/2005 | | 6/6/2005 | | FAIL |
|
|
|
resubmittal assigned to Mary F. to review 6/3/05
Resubmittal requried on the south side fire department access to all exterior portions of the buildings within a maximum of 150'.
|
Plan resubmittals received | | | 5/26/2005 | | |
|
|
|
Received (4) copies of sheet A1.1, A2.0, A2.1, A2.4, A2.6, A2.7, A2.8, A3.4, A8.1, S1.1, S2.1, S3.2, S3.3, S4.3, S6.2 and M3.0. Also received (1) copy of unit coolers technical data. Routed to Mike O.
|
Routing - PLAN CHECK | 5/26/2005 | | 5/26/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/16/2005 | | 5/18/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/18/2005 | | 5/18/2005 | | PEND |
|
|
|
|
Routing - PLUMBING | 5/11/2005 | | 5/16/2005 | | PASS |
|
|
|
per plans and resubmittals dated 4/28/05
|
Routing - Erosion and Sediment | 5/10/2005 | | 5/11/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
1st review completed | | | 5/10/2005 | | FAIL |
|
|
|
failed Sturctural, ESC, plumbing, public works, plan check and fire.
|
Routing - FIRE | 5/5/2005 | | 5/10/2005 | | FAIL |
|
|
|
See attached review comments; review faxed to architect.
|
Routing - PLAN CHECK | 4/26/2005 | | 5/5/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/5/2005 | | DONE |
|
|
|
IBC corrections.
|
Plan resubmittals received | | | 5/4/2005 | | DONE |
|
|
|
Received Transmittal & 4 Copys of sheets A0.0,A2.0,A2.4,A2.7,A3.2,A3.3,A3.4,A4.2,A4.7,A9.2 Taken to Mike P.
|
Routing Off Site - STRUCTURAL | 5/2/2005 | | 5/3/2005 | | PASS |
|
|
|
Called PDQ for pick up..
|
Plan resubmittals received | | | 4/28/2005 | | DONE |
|
|
|
Received 2 Document Transmittals ,2 ESC Narratives, 6 Copys of sheets ESC-1,ESC-2 & 4 Copys of sheets P2.0,P3.0 Taken to Mike O.
|
Routing - PLANNING | 4/22/2005 | | 4/26/2005 | | PASS |
|
|
|
Sara S. DRH05-00025
Approved [er DRH05-00025.
|
Plan resubmittals received | | | 4/21/2005 | | DONE |
|
|
|
Received Transmittal 3 Response comments,2 Material testing books, 4 Copys of sheets S1.2,S2.2,S4.4,S6.2, Taken to Mike O.
|
Routing - PLUMBING | 4/14/2005 | | 4/14/2005 | | FAIL |
|
|
|
if RPZ is an R.P backflow preventor it must be located in an area with drainage to handle the full discharge. provide a water supply for an automatic soap dispensor at the mop sink if used. provide a vent for the trench drain. flammable liquids interceptor must drain to the sanitary sewer, use approved detail attached.
|
Routing - Erosion and Sediment | 4/14/2005 | | 4/14/2005 | | FAIL |
|
|
|
ESC plan does not meet standards set forth in BMC 8-17. Checklist completed. Informed Contractor. Faxed Checklist.
|
Routing - PUBLIC WORKS | 4/7/2005 | | 4/14/2005 | | FAIL |
|
|
|
Contact Mike Hunter at ###-#### for conditions of rejection.
|
Routing Off Site - STRUCTURAL | 3/26/2005 | | 4/11/2005 | | FAIL |
|
|
|
Called PDQ for pick up. Sent corrections to architect. MLO
|
Routing - PLANNING Land Div | 3/29/2005 | | 4/7/2005 | | PASS |
|
|
|
Lots 17 and 18 of Boise Industrial Foundation combined by one Tax Parcel #.
|
Plan routing begun/NEW & ADDTN | | | 3/29/2005 | | |
|
|
|
|
Routing - AIRPORT | 3/28/2005 | | 3/28/2005 | | PASS |
|
|
|
(1) Sent to Matt Petaja via interdepartmental mail.
|
Pending Assignment by MYS | 3/24/2005 | | 3/25/2005 | | DONE |
|
|
|
3/25/2005 14:34:18 JCM - activity updated through activity BLDA174 from case BLD05-00775.
|
Application received | | | 3/24/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/24/2005 | | |
|
|
|
|