BLD-Final | 4/13/2006 | 4/14/2006 | 4/14/2006 | P | PASS |
Jim Sly
|
|
|
EARL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/C issued.
|
DOC - Permit Finaled | 4/14/2006 | 4/14/2006 | 4/14/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PASS |
Jim Sly
|
|
|
Requesting inspection of wall insulation and authorization to cover Dean; Phone #: ###-#### Energy Pass
|
BLD-Conference | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Tom Arcoraci
|
|
|
Requesting permission to insulate exterior walls. ; Phone #: ###-#### ok to insulate after mech approval
|
BLD-Conference | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PART |
Jim Sly
|
|
|
Requesting consultation with inspector pertaining to and inspection of work todate of fire seperation walls for townhouse. Would inspector please call me prior to visit to site. It will take me approximately 15 minutes travel time to be at site.; Phone #: ###-#### Internet Inspection Request from: Dean McKellip Conf on townh walls. Need to complete truss section and thru to soffit/fascia. N. on M.G. R on Goddard R. on Vera
|
BLD-Conference | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | PASS |
Jim Sly
|
|
|
Requesting inspection of townhouse seperation wall and authorization to turn up wall. If possible would like to meet inspector on job to discuss proper proceedure for construction of wall.; Phone #: ###-####
|
BLD-Conference | 6/13/2005 | 6/14/2005 | 6/14/2005 | A | PASS |
Jim Sly
|
|
|
Requestion authorization to pour stem walls for foundation. If possible would like inspection late morning 11:30 to 12:00 Am or 1 to 1:30 PM; Phone #: ###-#### Foundation walls OK. 316
|
BLD-Conference | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PASS |
Jim Sly
|
|
|
Requesting authorization to pour building footings. . plans in tube on back of Habitat sign.; Phone #: ###-#### Internet Inspection Request from: Dean McKellip N M.G. R Goddard R Vera (B4 Milwalkee)
|
Issue & PRINT permit | | | 6/6/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/6/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 3/24/2005 | 5/23/2005 | 6/3/2005 | | PASS |
|
|
|
6/3/2005 08:32:12 SAM - activity updated through activity BLDA022 from case BLD05-00780.
|
Routing - PLAN CHECK | 5/13/2005 | | 6/3/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/3/2005 | | DONE |
|
|
|
no fees due per bruce chatterton for bld
|
(F) Reprint permit | | | 6/3/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/1/2005 | | |
|
|
|
Received (2) copies of sheet A-1.1, A2.1, A3.1, A3.2, S1.1, S1.2 and E1.1. Also received (2) copies of Trus Joist letter. Routed to Steve M.
|
Plan Reviewer's activity | | | 5/23/2005 | | DONE |
|
|
|
14:05 I called and left a message for Earl. I need wall bracing shown, seperation wall needs to be revised, front porch probles on unit "A", need beam sizes, no openings between units (front porch) and REScheck needs to be fixed. Plans are on hold.
|
Routing - PLANNING | 5/13/2005 | | 5/13/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/13/2005 | | 5/13/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 3/28/2005 | | 3/28/2005 | | FAIL |
|
|
|
Duplex has not been approved. Informed applicant and he will be coming in to discuss duplex application. CER
|
Routing - PLANNING Land Div | 3/25/2005 | | 3/28/2005 | | PASS |
|
|
|
Parcel approved as one-time split of platted lot in subdivision recorded prior to October 30, 1965. Demolition permit BLD04-01491 for existing structure.
|
Application received | | | 3/24/2005 | | |
|
|
|
|