Permit Information
Permit NumberBLD05-00801
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 3013 S ABIGAIL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a five bedroom, four and quarter bathroom 4581 sq. ft. two story single family dwelling (2783 sq. ft. first floor/1798 sq. ft. second floor) with a attached 1542 sq. ft. four car garage and a 126 sq. ft. covered front porch. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A Elevation Certificate is required before calling for a rough framing inspection. (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/7/20064/10/20064/10/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2006 at 12:59:36 PM. Contact: ###-####.
DOC - Permit Finaled4/10/20064/10/20064/10/2006PPASS
DetailsJim Storey
BLD-Wall cover10/5/200510/7/200510/7/2005PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Janet Kell
Plan Reviewer's activity  10/5/2005 DONE
Elevation certificate has been approved by Jim Wylie and inspections can continue.
BLD-Framing/Rough-in9/30/200510/3/200510/3/2005APART
DetailsJim Storey
###-#### - janet/###-#### - jermine need flood plain cert to planreview/ latteral brace/ sheeblk/ and sheer walls interior.
BLD-Framing/Rough-in9/30/20059/30/20059/30/2005PFAIL
DetailsMike Jordan
janet; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. need truss eng.
BLD-Framing/Rough-in9/6/20059/7/20059/7/2005ADONE
DetailsMike Jordan
shear inspection please////janet; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Shear wall insp. Insp not required, wall bracing responsiblity of contractor. Did verify that all holdowns were in place as per plans and verified nailing patterns on first floor. work appears to be in accordence with approved plans on site.
BLD-Foundation5/26/20055/26/20055/26/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/26/2005 at 6:59:01 AM. Contact: ###-####.wip
BLD-Footing5/20/20055/20/20055/20/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/20/2005 at 6:40:01 AM. Contact: ###-####.setbacks ok
Override - People Holds  5/5/2005  
Issue PAID IN FULL permit  5/5/2005 DONE
Telephone call  5/4/2005 DONE
called left message on machine permit is ready and fees 8:31am 5/4/05 LEM
Plan assigned to (SAM)3/25/20055/3/20055/3/2005 PASS
5/3/2005 15:46:53 SAM - activity updated through activity BLDA022 from case BLD05-00801.
PLANS/APPL TAKEN TO FRONT DESK  5/3/2005 DONE
Override - People Holds  5/3/2005  
Permit Ready to Issue  5/3/2005 DONE
Override - People Holds  5/3/2005  
Inspection Record Card- Bld  5/3/2005 DONE
Routing - PLAN CHECK5/2/2005 5/3/2005 PASS
Routing - PUBLIC WORKS4/29/2005 5/2/2005 PASS
Routing - Erosion and Sediment5/2/2005 5/2/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING4/26/2005 4/29/2005 FAIL
discussed with applicant - working to resolve setback issues. Driveway ok per SRS
Routing - PLANNING4/28/2005 4/29/2005 PASS
Roof overhang into building setback approved as noted, spoke with applicant. Will expedite as able. Floodplain to be approved.
Application received  3/25/2005  
Routing - PLANNING3/25/2005   FAIL
failed initial review - floodplain approval needed will route to Jim Wylie. Also, side entry driveway and roof overhang into setbacks do not comply