Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00807
StatusFinaled
Name RRC- CONTRACTORS
Site Address 2909 W CANAL ST
Project NameJems Properties Triplex Bldg 5
Customer Number 
ePlanReviewNo
Description
Building # 5 * To construct a new 3,375 sq.ft. three story, triplex. The first floor is two bedroom and two bath, at 1,186 sq.ft. the second floor is two bedroom and two bath with a 92 sq.ft. covered deck and is 1,186 sq.ft. the third floor is one bedroom and one bath with a 92 sq.ft covered deck and is 816 sq.ft. NOTE: This building is fire sprinklered per NFPA 13-R for story increase per the 2000 IBC. This permit does not cover the construction of the carports. Separate permits, plans and calculations will be required to be submitted for review and construction of the carports on this project. All construction per the approved plans and attached comment list. MJP CUP 04-00103
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/25/20075/25/20076/21/2007 DONE
Second Notice has not been responded to.
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/25/20075/9/2007 DONE
Permanent occupancy  4/25/2007 DONE
Perm. Occ. Cert. # 11553 issued 4-25-07 to Jems Properties.
Code Occupancy Approval4/24/20074/24/20074/24/2007PPASS
DetailsDena Gambrel
4-24-07 Final Occupancy signed off. O.K. to release bond.
Permanent Occupancy 4/24/20074/24/2007 DONE
Details
BLD-Conference4/23/20074/23/20074/23/2007PDONE
DetailsJim Sly
###-#### - derrick pls call 30 min prior
Code Occupancy Approval4/6/20074/6/20074/6/2007PFAIL
DetailsDena Gambrel
4-5-07 at 11:25 and 4-6-07 at 8:58 I tried to contact Mr. Cooper for inspection because I am to "Please call contractor before going onsite". On both calls, I received a message indicating that his voice mail was full and that I would have to try back latter. Have contractor reschedule inspection when he is going to be able to be reached.
BLD-Final1/10/20071/11/20071/11/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/10/2007 at 4:51:56 PM. Contact: ###-####.ok pending others.
Temporary occupancy  1/11/2007 DONE
Temp. Occ. Cert. # 5513 issued 1-11-07 to Jems Properties.
FIRE-Final Inspection1/9/20071/10/20071/10/2007PPASS
DetailsForrest France
Corrections have been verified, life safety finaled.
FIRE-Final Inspection1/8/20071/9/20071/9/2007AFAIL
DetailsForrest France
Locate smoke alarms per NFPA 72 2002.
BLD-Final1/5/20071/8/20071/8/2007PNR
DetailsTom Arcoraci
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection1/5/20071/8/20071/8/2007ANR
DetailsForrest France
The project related fire alarm and sprinkler permits must be inspected and approved prior to life safety final.
Code Occupancy Approval Temp12/15/200612/15/200612/15/2006PFAIL
DetailsDena Gambrel
12-15-06 Needs to bond for landcaping (19,233.33) Once bond has been received, O.K. to sign for a temp Occupancy. Some changes have been made but not included on an updated landscape plan. Reqired an update plan be submitted and approved by the city. Correction notice give.
FIRE-Final Inspection12/12/200612/13/200612/13/2006AFAIL
DetailsForrest France
Wrong permit number called in for request, was intended for building 2901. Noted missing fire exitnguishers and three SD in the bedrooms at the 2nd floor unit which will require relocation due to proximity to HVAC diffusers.
FIRE-Final Inspection12/11/200612/12/200612/12/2006ANR
DetailsForrest France
Project requires a fire alarm permit, alarm work completion, alarm inspection and final approval-see fire code review notes attatched to the issued building plan set for details. The fire alarm and sprinkler work permits must both be approved and finaled prior to building life safety inspection for final. Notified the general contractor of requirements.
Print Occupancy Form  12/11/2006 DONE
BLD-Conference12/7/200612/7/200612/7/2006PNR
DetailsTom Arcoraci
derrick - re: handrails - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference11/28/200611/28/200611/28/2006PFAIL
DetailsTom Arcoraci
derrick - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs 2 handrails and ext
BLD-Aging Inspection10/17/200610/17/200610/17/2006 PASS
DetailsTom Arcoraci
BLD-Aging Inspection8/17/20068/17/20068/17/2006 NR
DetailsTom Arcoraci
BLD-Energy code compliance6/16/20066/16/20066/19/2006PPART
DetailsJim Storey
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Wall cover4/12/20064/13/20064/13/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/12/2006 at 10:40:31 AM. Contact: ###-####.
BLD-Energy code compliance4/12/20064/13/20064/13/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/12/2006 at 10:39:52 AM. Contact: ###-####.
BLD-Framing/Rough-in4/6/20064/7/20064/7/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/6/2006 at 3:47:08 PM. Contact: ###-####.
BLD-Framing/Rough-in3/3/20063/6/20063/6/2006ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/3/2006 at 12:31:49 PM. Contact: ###-####.
BLD-Aging Inspection2/16/20062/16/20062/16/2006 NR
DetailsTom Arcoraci
BLD-Aging Inspection12/14/200512/14/200512/14/2005 NR
DetailsTom Arcoraci
BLD-Foundation10/13/200510/14/200510/14/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/13/2005 at 2:30:41 PM. Contact: ###-####.
BLD-Conference10/10/200510/11/200510/11/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/10/2005 at 2:35:57 PM. Contact: ###-####.
BLD-Footing10/10/200510/11/200510/11/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/10/2005 at 2:34:32 PM. Contact: ###-####.
Issue PAID IN FULL permit  9/27/2005 DONE
Inspection Record Card- Bld  9/23/2005 DONE
Print Occupancy Form  9/23/2005 DONE
Permit Ready to Issue  9/23/2005 DONE
Telephone call  9/23/2005 DONE
tlk to brian cooper ###-#### that his permit and fees are ready to be picked up
Plan assigned to (M_P)3/25/20053/25/20059/22/2005 PASS
9/22/2005 11:04:11 M_P - activity updated through activity BLDA022 from case BLD05-00807.
Routing - PLAN CHECK9/20/2005 9/22/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/22/2005 DONE
Print Pending Permit.LaserJet4  9/22/2005 DONE
Case Summary (BLD)  9/22/2005 DONE
Routing - PLAN CHECK9/19/2005 9/20/2005  
Routing to planning.
Routing - PLANNING9/19/2005 9/19/2005 PASS
Routing - FIRE9/1/2005 9/19/2005 PASS
resubmittal acceptable.
Routing - PLAN CHECK8/19/2005 9/1/2005  
Routing to fire.
Routing - PLAN CHECK8/10/2005 8/19/2005 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  8/11/2005 DONE
Received 1 Transmittal, 2 United Water sheets, & 2 Copys of sheet A2.1 Taken to Mike P.
Routing - FIRE7/29/2005 8/10/2005 FAIL
Architect did not respond to two of the 4 resubmittal comments. Revised review faxed to architect.
Plan resubmittals received  8/5/2005  
Received (2) copies of sheet A2.1, A2.4, A3.1, A3.2, A3.4, A4, A5, EM-1 and EM-2. Routed to Mike P.
Routing - PLAN CHECK7/20/2005 7/29/2005 FAIL
2nd review failed sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.
Routing - PUBLIC WORKS7/29/2005 7/29/2005 PASS
Routing - PUBLIC WORKS7/18/2005 7/20/2005 FAIL
Where sanitary sewer lines connect to public sewer they must be a min of 1 foot apart and be perpendicular to the main line. Contact Jim Pardy at ###-####
Routing - PLUMBING7/18/2005 7/18/2005 PASS
increase water service piping to 1 1/4". thermol expantion protection required.
Routing - PLAN CHECK7/18/2005 7/18/2005  
Routing to P.W.
Routing - PLAN CHECK5/27/2005 7/18/2005  
Routing to plumbing.
Plan resubmittals received  7/8/2005 DONE
Received Transmittal & 2 Copys of sheets C1.1,A1,A2.1,A2.2,A3.1,A3,A3.2,A4,A5,EM-1,EM-2 Taken to Mike P
Routing - FIRE5/24/2005 5/27/2005 PASS
review faxed to architect
1st review completed  5/27/2005 FAIL
failed planning, public works, plumbing, plan check, and fire.
Case Summary (BLD)  5/24/2005  
Routing - PLAN CHECK5/4/2005 5/23/2005 FAIL
Plan review completed, sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.

Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
Pending Assignment by MYS3/25/2005 5/20/2005 DONE
5/20/2005 08:20:12 M_P - activity updated through activity BLDA170 from case BLD05-00807.
Plan resubmittals received  5/13/2005 DONE
Received 2 Letters , 2 Design Criterias, 1 Response & 2 Copys of sheets A0,A2.1,A2.4,A3,A3.1,A3.4,A6,P-1,P-2,A4,A5,EM-1,EM-2 Taken to Mike P.
Routing - PLAN CHECK5/4/2005 5/4/2005 HOLD
Routed to Mike on 5/4/2005.
Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
Plan Reviewer's activity  5/4/2005 HOLD
Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
Routing - PLANNING4/19/2005 4/20/2005 FAIL
Failed for noncompliance w/ conditions of approval #2, 4, 5, 10.
Routing - PLUMBING4/14/2005 4/19/2005 FAIL
see bld05-00802 for comments
Routing - Erosion and Sediment4/13/2005 4/14/2005 PASS
ESC plan approved with attached conditions.
Plans ACCEPTED BY PLAN TECH  4/13/2005  
Routing - PLANNING Land Div4/7/2005 4/7/2005 PASS
Application received  3/25/2005  
Recd Pcfee & Taken To Pln CK  3/25/2005  
Fee Review-notes3/25/20053/25/2005   
Routing - PUBLIC WORKS4/7/2005   FAIL
Failed by Brian Murphy - Requires drainage plan revisions. Contact at ###-####

Failed by Jim Pardy - Each building requires an individual connection to a main line as defined by DEQ.