Third Notice BLD | 5/25/2007 | 5/25/2007 | 6/21/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/25/2007 | 5/9/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/25/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11553 issued 4-25-07 to Jems Properties.
|
Code Occupancy Approval | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Dena Gambrel
|
|
|
4-24-07 Final Occupancy signed off. O.K. to release bond.
|
Permanent Occupancy | | 4/24/2007 | 4/24/2007 | | DONE |
|
|
|
|
BLD-Conference | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | DONE |
Jim Sly
|
|
|
###-#### - derrick pls call 30 min prior
|
Code Occupancy Approval | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | FAIL |
Dena Gambrel
|
|
|
4-5-07 at 11:25 and 4-6-07 at 8:58 I tried to contact Mr. Cooper for inspection because I am to "Please call contractor before going onsite". On both calls, I received a message indicating that his voice mail was full and that I would have to try back latter. Have contractor reschedule inspection when he is going to be able to be reached.
|
BLD-Final | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/10/2007 at 4:51:56 PM. Contact: ###-####.ok pending others.
|
Temporary occupancy | | | 1/11/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5513 issued 1-11-07 to Jems Properties.
|
FIRE-Final Inspection | 1/9/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Forrest France
|
|
|
Corrections have been verified, life safety finaled.
|
FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | FAIL |
Forrest France
|
|
|
Locate smoke alarms per NFPA 72 2002.
|
BLD-Final | 1/5/2007 | 1/8/2007 | 1/8/2007 | P | NR |
Tom Arcoraci
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 1/5/2007 | 1/8/2007 | 1/8/2007 | A | NR |
Forrest France
|
|
|
The project related fire alarm and sprinkler permits must be inspected and approved prior to life safety final.
|
Code Occupancy Approval Temp | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | FAIL |
Dena Gambrel
|
|
|
12-15-06 Needs to bond for landcaping (19,233.33) Once bond has been received, O.K. to sign for a temp Occupancy. Some changes have been made but not included on an updated landscape plan. Reqired an update plan be submitted and approved by the city. Correction notice give.
|
FIRE-Final Inspection | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | FAIL |
Forrest France
|
|
|
Wrong permit number called in for request, was intended for building 2901. Noted missing fire exitnguishers and three SD in the bedrooms at the 2nd floor unit which will require relocation due to proximity to HVAC diffusers.
|
FIRE-Final Inspection | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | NR |
Forrest France
|
|
|
Project requires a fire alarm permit, alarm work completion, alarm inspection and final approval-see fire code review notes attatched to the issued building plan set for details. The fire alarm and sprinkler work permits must both be approved and finaled prior to building life safety inspection for final. Notified the general contractor of requirements.
|
Print Occupancy Form | | | 12/11/2006 | | DONE |
|
|
|
|
BLD-Conference | 12/7/2006 | 12/7/2006 | 12/7/2006 | P | NR |
Tom Arcoraci
|
|
|
derrick - re: handrails - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Conference | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | FAIL |
Tom Arcoraci
|
|
|
derrick - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs 2 handrails and ext
|
BLD-Aging Inspection | 10/17/2006 | 10/17/2006 | 10/17/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/17/2006 | 8/17/2006 | 8/17/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 6/16/2006 | 6/16/2006 | 6/19/2006 | P | PART |
Jim Storey
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Wall cover | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/12/2006 at 10:40:31 AM. Contact: ###-####.
|
BLD-Energy code compliance | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/12/2006 at 10:39:52 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/6/2006 at 3:47:08 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/3/2006 at 12:31:49 PM. Contact: ###-####.
|
BLD-Aging Inspection | 2/16/2006 | 2/16/2006 | 2/16/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/14/2005 | 12/14/2005 | 12/14/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 10/13/2005 | 10/14/2005 | 10/14/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/13/2005 at 2:30:41 PM. Contact: ###-####.
|
BLD-Conference | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/10/2005 at 2:35:57 PM. Contact: ###-####.
|
BLD-Footing | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/10/2005 at 2:34:32 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 9/27/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/23/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/23/2005 | | DONE |
|
|
|
tlk to brian cooper ###-#### that his permit and fees are ready to be picked up
|
Plan assigned to (M_P) | 3/25/2005 | 3/25/2005 | 9/22/2005 | | PASS |
|
|
|
9/22/2005 11:04:11 M_P - activity updated through activity BLDA022 from case BLD05-00807.
|
Routing - PLAN CHECK | 9/20/2005 | | 9/22/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/22/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/22/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/19/2005 | | 9/20/2005 | | |
|
|
|
Routing to planning.
|
Routing - PLANNING | 9/19/2005 | | 9/19/2005 | | PASS |
|
|
|
|
Routing - FIRE | 9/1/2005 | | 9/19/2005 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 8/19/2005 | | 9/1/2005 | | |
|
|
|
Routing to fire.
|
Routing - PLAN CHECK | 8/10/2005 | | 8/19/2005 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 8/11/2005 | | DONE |
|
|
|
Received 1 Transmittal, 2 United Water sheets, & 2 Copys of sheet A2.1 Taken to Mike P.
|
Routing - FIRE | 7/29/2005 | | 8/10/2005 | | FAIL |
|
|
|
Architect did not respond to two of the 4 resubmittal comments. Revised review faxed to architect.
|
Plan resubmittals received | | | 8/5/2005 | | |
|
|
|
Received (2) copies of sheet A2.1, A2.4, A3.1, A3.2, A3.4, A4, A5, EM-1 and EM-2. Routed to Mike P.
|
Routing - PLAN CHECK | 7/20/2005 | | 7/29/2005 | | FAIL |
|
|
|
2nd review failed sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.
|
Routing - PUBLIC WORKS | 7/29/2005 | | 7/29/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/18/2005 | | 7/20/2005 | | FAIL |
|
|
|
Where sanitary sewer lines connect to public sewer they must be a min of 1 foot apart and be perpendicular to the main line. Contact Jim Pardy at ###-####
|
Routing - PLUMBING | 7/18/2005 | | 7/18/2005 | | PASS |
|
|
|
increase water service piping to 1 1/4". thermol expantion protection required.
|
Routing - PLAN CHECK | 7/18/2005 | | 7/18/2005 | | |
|
|
|
Routing to P.W.
|
Routing - PLAN CHECK | 5/27/2005 | | 7/18/2005 | | |
|
|
|
Routing to plumbing.
|
Plan resubmittals received | | | 7/8/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheets C1.1,A1,A2.1,A2.2,A3.1,A3,A3.2,A4,A5,EM-1,EM-2 Taken to Mike P
|
Routing - FIRE | 5/24/2005 | | 5/27/2005 | | PASS |
|
|
|
review faxed to architect
|
1st review completed | | | 5/27/2005 | | FAIL |
|
|
|
failed planning, public works, plumbing, plan check, and fire.
|
Case Summary (BLD) | | | 5/24/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 5/4/2005 | | 5/23/2005 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.
Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
|
Pending Assignment by MYS | 3/25/2005 | | 5/20/2005 | | DONE |
|
|
|
5/20/2005 08:20:12 M_P - activity updated through activity BLDA170 from case BLD05-00807.
|
Plan resubmittals received | | | 5/13/2005 | | DONE |
|
|
|
Received 2 Letters , 2 Design Criterias, 1 Response & 2 Copys of sheets A0,A2.1,A2.4,A3,A3.1,A3.4,A6,P-1,P-2,A4,A5,EM-1,EM-2 Taken to Mike P.
|
Routing - PLAN CHECK | 5/4/2005 | | 5/4/2005 | | HOLD |
|
|
|
Routed to Mike on 5/4/2005.
Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
|
Plan Reviewer's activity | | | 5/4/2005 | | HOLD |
|
|
|
Sent submittal letter to architect on 4/5/05 and had meeting with architect stating items which needed to be corrected prior to my review.
|
Routing - PLANNING | 4/19/2005 | | 4/20/2005 | | FAIL |
|
|
|
Failed for noncompliance w/ conditions of approval #2, 4, 5, 10.
|
Routing - PLUMBING | 4/14/2005 | | 4/19/2005 | | FAIL |
|
|
|
see bld05-00802 for comments
|
Routing - Erosion and Sediment | 4/13/2005 | | 4/14/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/7/2005 | | 4/7/2005 | | PASS |
|
|
|
|
Application received | | | 3/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/25/2005 | | |
|
|
|
|
Fee Review-notes | 3/25/2005 | 3/25/2005 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/7/2005 | | | | FAIL |
|
|
|
Failed by Brian Murphy - Requires drainage plan revisions. Contact at ###-####
Failed by Jim Pardy - Each building requires an individual connection to a main line as defined by DEQ.
|