Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00849
StatusExpired
Name ADVANTAGE CONSTRUCTION
Site Address 909 E RESERVE ST
Project NameMARQUIS CARE
Customer Number 
ePlanReviewNo
Description
(MARQUIS CARE AT SHAW MOUNTAIN) To establish a certificate of occupancy for the entire facility. To perform minor interior and exterior remodel to an existing nursing home per approved plans. Work includes code upgrades to the east wing corridor to create smoke partition walls & 1-hour roof/ceiling assembly in corridor for type VA construction per sec. 407, 2003 IBC; modification of select door assemblies for size increase, direction of swing and proper hardware (doors 11, 52, 53, 58, 59); to create a suite at the south end of the east wing by installing new door assembly (#31); modify doors 28, 91, 30, 113, 114, 115, 18, 19 & 8 per plans; to relocate the 2-hour fire wall to location shown between east and main wing, with 4 foot lower roof assembly a minimum of 1-hour roof ceiling construction on each side of 2-hour wall instead of parapet w/o openings in roof; create a new nurse station / office from patient room (#1); combine two patient rooms (#65 & # 67) to make new lounge / soft room with new exterior doors to fenced outdoor area & restroom (#65a) converted to storage; convert patient room (#45) to weight room and reduce exterior window & opening size; and install mock-up kitchen in dining / living room (#110) for reintroducing patients to basic home features to assist them in developing independence. All per approved plans, red-line notes thereon and all attached plan review conditions of all reviewing agencies. NOTE: BLD02-00194 for T.I. is still in effect with remodel still in progress. (drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/3/20083/3/20083/3/2008 PASS
DetailsDave Hannah
DOC - Permit Expired3/3/20083/3/20083/3/2008PPASS
DetailsDave Hannah
BLD-Final2/15/20072/16/20072/16/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/15/2007 at 1:26:11 PM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection2/15/20072/16/20072/16/2007APASS
DetailsForrest France
Corrections have been verified for completion, fire life safety inspeciton passed.
BLD-Final2/14/20072/15/20072/15/2007AFAIL
DetailsDave Hannah
ty; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs fire sign offs and smoke seals on doors
FIRE-Final Inspection2/14/20072/15/20072/15/2007AFAIL
DetailsForrest France
Post missing max. occupant load signs at two rooms in the new addition, provide approved hardware at the door to the SE day room as circled on approved plans.
FIRE-Final Inspection2/14/20072/14/20072/15/2007PCANC
DetailsTroy Cobbley
There was no time for inspection. Will need to reschedule.
FIRE-Conference7/25/20067/27/20067/27/2006ADONE
DetailsForrest France
On site confrence to discuss project related fire alarm, cooking hood, and fire life safety work issues necessary to final BLD permits and establish an occupancy certificate. 60 day timeline for completion established with building manager and contractor.
Meeting  7/27/2006 DONE
On-site meeting held today with Dan Frazee, new maintenance Dir for Marquee Care, Dave Whiting with ADT, Sam Rogers and Forrest France to review status of fire alarm system. An existing system is installed essentially throughout both wings of the building but some modifications are required. They do not have plans of the existing system which Dave Whiting indicated was installed in 1998 under a permit by the City. The west wing, remodeled under BLD05-00849 which includes an Alzheimer's unit, is not occupied pending approval of the building permit, which is still contingent upon completion of alarm modifications. The west wing is fully occupied without a C of O which is part of the scope of BLD05-00849. Agreement was reached on a deadline of 60 days to complete the fire alarm work and obtain necessary final inspections to obtain a C of O for the entire facility. This is based on two weeks for alarm vendor to prepare plans and submit for a permit, two weeks for us to review and approve a permit, and 30 days to complete the installation work.
Case Summary (BLD)  6/5/2006 DONE
Case Summary (BLD)  6/2/2006  
Attached Document  6/2/2006 FAIL
Received letter dated 6/1/06 requesting FD approval to occupy the newly remodeld area without fire alarm work being performed until 10/1/2006. Request denied. FD response letter is attached in Doc's as a PDF file; letter faxed to Mr. Rudd.
BLD-Framing/Rough-in2/2/20062/3/20062/3/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/2/2006 at 3:44:26 PM. Contact: ###-####. ceiling grid ok to cover
BLD-Conference1/31/20061/31/20062/1/2006PPASS
DetailsDave Hannah
harvey -###-####
Plan resubmittals received  12/30/2005 DONE
Letter from architect and accompanying 8-1/2" x 11" drawings received and forwarded to Dan Stuart.
BLD-Framing/Rough-in12/22/200512/23/200512/23/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/22/2005 at 3:17:22 PM. Contact: ###-####.ceiling in corr ok
BLD-Framing/Rough-in11/9/200511/9/200511/10/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/9/2005 at 10:48:13 AM. Contact: ###-####.lids in corr ok 2hr door needs 90 min grassing and smoke doors need 20 min
BLD-Framing/Rough-in9/20/20059/20/20059/21/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2005 at 9:33:11 AM. Contact: ###-####. mis framing north wing and nurses station ok to cover
BLD-Framing/Rough-in8/19/20058/19/20058/19/2005PPART
DetailsDave Hannah
harvey ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fire blocking on backside of corrodor walls
BLD-Framing/Rough-in8/1/20058/1/20058/1/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/1/2005 at 8:41:07 AM. Contact: ###-####. steel studs in game room at entry ok to cover
Issue PAID IN FULL permit  7/18/2005 DONE
Inspection Record Card- Bld  7/15/2005 DONE
Print Occupancy Form  7/15/2005 DONE
Permit Ready to Issue  7/15/2005 DONE
Telephone call  7/15/2005 DONE
called told Armondo permit is ready and fees
Routing - FIRE7/8/2005 7/14/2005 PASS
resubmittal acceptable. Revised review comments faxed to architect.
Routing - PLAN CHECK7/14/2005 7/14/2005 PASS
To permit desk.
PLANS/APPL TAKEN TO FRONT DESK  7/14/2005 PASS
To permit desk to issue.
Plan assigned to (DRS)3/31/2005 7/14/2005 PASS
7/14/2005 16:07:53 DRS - activity updated through activity BLDA022 from case BLD05-00849.
Routing - PLANNING7/8/2005 7/8/2005 PASS
Per note by Evelyn on Application cover sheet, there are no planning issues. Routing to fire.
Routing - PLAN CHECK5/17/2005 7/8/2005 PEND
Received and inserted new architectural, electrical, mechanical & plumbing plans with original plans. Routing plans to Planning then to fire code analyst for review.
Telephone call  7/8/2005 DONE
Called Gary Eichelberg to request certificate of value with all costs broken out, i.e. sprinkler modifications & alarm system modifications.
Plan resubmittals received  6/30/2005  
Received (2) copies of sheet A1.1, A1.2, A1.3, A2.1, A2.2, A2.3, A2.4, A2.5, A3.2, A6.1, M1.1, M2.1, M3.1, E1.0, E1.1, E2.0, E2.1 and E2.2. Routed to Dan S.
Routing - FIRE5/6/2005 5/17/2005 FAIL
faxed review to architect.
1st review completed  5/17/2005 FAIL
failed plan check and fire.
Plan resubmittals requested  5/6/2005 DONE
e-mailed and faxed copy of plan review report of items requiring correction to architect.
Routing - PLAN CHECK5/3/2005 5/6/2005 FAIL
e-mailed and faxed copy of plan review comments to architect for response.
Routing - Erosion and Sediment5/3/2005 5/3/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK4/5/2005 5/3/2005 PEND
Received ESC plans applicable to this permit and existing permit, BLD02-00194. Routed to ESC for review.
Telephone call  5/2/2005 DONE
Called and talked with Gary Eichelberg, architect, concerning the required corridor width and minimum clear widths at doors across corridors as required in the 1961, 1967, 1997 UBC's and 2000 & 2003 IBC. Plans still show incorrect code compliance per original approved plans & code's under which designed and approved and current plans being reviewed. I wondered what had been done to doors to be changed under BLD02-00194 to bring into compliance. Gary did not know. Details on submitted sheets I am currently reviewing still show uncorrected details that failed during last plan review. Gary will check into what is being done in field and I will require plan resubmittals showing correct width's.
Plan resubmittals received  4/7/2005 DONE
Received Letter, Taken to Dan S.
Routing - PLUMBING4/1/2005 4/5/2005 PASS
per plans ans 2003 upc
Routing - PUBLIC WORKS3/31/2005 4/1/2005 PASS
Plans ACCEPTED BY PLAN TECH  3/31/2005  
Plan resubmittals received  3/31/2005 DONE
Received 3 Copys of sheets A1.3,A2.3,A3.2 Taken to Dan S.
Application received  3/30/2005  
Recd Pcfee & Taken To Pln CK  3/30/2005 DONE
Fee Review-notes3/30/20053/30/2005