Third Notice BLD | 6/14/2006 | 6/14/2006 | 8/28/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/9/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/5/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11009 issued 5-5-06 to the Ann Taylor Loft.
|
BLD-Final | 5/1/2006 | 5/2/2006 | 5/2/2006 | P | PASS |
Dave Hannah
|
|
|
Kirk; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for perm occ
|
Permanent Occupancy | | 5/2/2006 | 5/2/2006 | | DONE |
|
|
|
|
BLD-Final | 4/20/2006 | 4/21/2006 | 4/24/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung needs to fix lock on front door
|
FIRE-Final Inspection | 4/20/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Forrest France
|
|
|
Life safety is acceptable.
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert # 5301 extended for 90 days per Jenifer until 5-2-06
|
BLD-Final | 2/3/2006 | 2/6/2006 | 2/7/2006 | A | FAIL |
Dave Hannah
|
|
|
Kirk -- pending fire finals for FIR05-00531 and FIR05-00520; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong still needs fire sign offs
|
Temporary occupancy | | | 11/3/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5301 issued 11-3-05 to the Ann Taylor Loft.
|
BLD-Final | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2005 at 8:18:35 PM. Contact: ###-####.ok for temp occ ok for perm after locks on front door are flaged and shell and core are finaled and other trades go perm
|
BLD-Final | 10/30/2005 | 10/31/2005 | 11/1/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2005 at 8:18:35 PM. Contact: ###-####.needs fire signoffs
|
FIRE-Final Inspection | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Forrest France
|
|
|
Temp. occupancy approved per D.Hanneman, final pending knox box install and alarm resubmittals for changes from approved drawings.
|
FIRE-Final Inspection | 10/28/2005 | 10/31/2005 | 10/31/2005 | A | FAIL |
Forrest France
|
|
|
Provide knox box and key as required, final pending shell sprinkler and alarm approval.
|
Code Occupancy Approval | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Conference | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | PASS |
Dave Hannah
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked project with contractor for pre final
|
BLD-Final | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 8:03:46 AM. Contact: ###-####.
|
BLD-Final | 9/27/2005 | 9/27/2005 | 9/28/2005 | P | PASS |
Dave Hannah
|
|
|
ceiling grid ok to drop in panals
|
BLD-Framing/Rough-in | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PART |
Dave Hannah
|
|
|
kirk --celing insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/26/2005 | | |
|
|
|
need insp for bld on ceiling
|
BLD-Framing/Rough-in | 9/15/2005 | 9/16/2005 | 9/16/2005 | A | PART |
Dave Hannah
|
|
|
kirk Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok in areas that 7/8 wall angle after all other trades sign off areas that have 3/8 wall angle will be changed to 7/8
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 7:09:58 AM. Contact: ###-####. ok to cover walls f/r plywood ok and all fire proofing on columns ok
|
BLD-Framing/Rough-in | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PART |
Dave Hannah
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok all but for around coulmns need ta reaply fire proofing also need to finish installing all fire treated ply wood
|
Issue PAID IN FULL permit | | | 7/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2005 | | DONE |
|
|
|
called Linda(?) with Retail Construction Services told her recieved check in mail, paid and issued permits. She said Bruce Karsten is coming today to pick up.
|
Telephone call | | | 6/30/2005 | | DONE |
|
|
|
talked to tim schenk at 1/800/541/0821 is ready
|
Routing - PLANNING | 5/25/2005 | | 5/25/2005 | | |
|
|
|
Approve
|
Routing - PLAN CHECK | 5/25/2005 | | 5/25/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2005 | | |
|
|
|
|
Telephone call | | | 5/25/2005 | | DONE |
|
|
|
lft ms with tim schenk ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (CJW) | 4/1/2005 | | 5/25/2005 | | PASS |
|
|
|
5/25/2005 16:08:34 CJW - activity updated through activity BLDA022 from case BLD05-00850.
|
Routing - PLAN CHECK | 4/20/2005 | | 5/24/2005 | | |
|
|
|
Sent back to Planning
|
1st review completed | | | 4/20/2005 | | FAIL |
|
|
|
failed planning
|
Routing - FIRE | 4/15/2005 | | 4/20/2005 | | PASS |
|
|
|
review faxed to architect.
|
Routing - PLANNING | 4/12/2004 | | 4/15/2005 | | FAIL |
|
|
|
Need DR approval for exterior tenant improvements per DRH03-61. Can be done as a Zoning Certificate. Contacted architect 4-15-05.
|
Routing - PLAN CHECK | 4/4/2005 | | 4/12/2005 | | PASS |
|
|
|
The IBC plan review was started on April 8, 2005 and was finished on April 12. The drawings were approved with "red lines" on the drawings. See the plan review report.
|
Routing - PUBLIC WORKS | 4/1/2005 | | 4/4/2005 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/30/2005 | | 4/1/2005 | | DONE |
|
|
|
4/1/2005 16:58:31 MYS - activity updated through activity BLDA172 from case BLD05-00850.
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2005 | | |
|
|
|
|
Application received | | | 3/30/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2005 | | |
|
|
|
|
Fee Review-notes | 3/30/2005 | 3/30/2005 | | | |
|
|
|
|