Third Notice BLD | 1/20/2006 | 1/20/2006 | 3/2/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 12/28/2005 | 1/20/2006 | | DONE |
|
|
|
|
First Notice | | 10/27/2005 | 12/6/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/10/2005 | | |
|
|
|
|
Permanent Occupancy | | 7/7/2005 | 7/7/2005 | | DONE |
|
|
|
|
BLD-Final | 7/7/2005 | 7/7/2005 | 7/7/2005 | | DONE |
|
|
|
all corrections made ok.
|
DOC - Permit Finaled | | | 7/7/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/7/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10655 issued 7-7-05 to The Loft on the 2nd floor of the Adelman Bldg.
|
FIRE-Final Inspection | 5/20/2005 | 5/23/2005 | 5/23/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy Cobbley
|
|
|
mark; Phone #: ###-#### New door at kitchen will be supplied within three weeks. Door between the bar and the elevator lobby has been removed. Per Mark this door is also being replace. This door and its hardware will be inspected with the new kitchen doo
|
Meeting | | | 4/21/2005 | | DONE |
|
|
|
Meeting with Renn Ross. He wants all items on correction notice except door replacement to be done by Friday afternoon. Fire cannot allow another Friday night crowd without these basic life safety deficiencies corrected. Agrees they need some type of acceptable means of egress to use the mechanical space above the cooler for dry goods storage due to frequent occupancy by staff; they can provide this, along with replacing the kitchen door, within a couple of weeks to accommodate work schedules.
|
Meeting | | | 4/21/2005 | | DONE |
|
|
|
Met with David Eisenhauer, owner/partner. Reviewed each item on correction list. Explained the life safety hazard each of these deficiencies create and why Fire must require these items to be corrected before the next Friday night event. He agreed to have all items on correction list except #2 corrected and satisfactorily inspected by 4pm tomorrow (4/22) and understands Fire cannot allow them to be open after 4pm tomorrow if these items are not satisfactorily corrected. They are using the compressor space above the cooler for dry goods, smocks, towels, personal coats and misc storage; storage is to the ceiling. He indicated they plan to provide a fixed fire-escape-type ladder for access/egress. I agreed to allow until May 13 (3 weeks) for this ladder installation and the kitchen door replacement to be completed. They will maintain storage 18" below level of sprinkler heads.
|
FIRE-Final Inspection | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | FAIL |
Troy Cobbley
|
|
|
Pocket doors to be locked open during business hours. Provide signage stating this at the doors. New door into kitchen does not meet IFC 1008.1.1. Provide emergency lighting at top of the north stairs. Test all other emergency lights in elevator lobby. Provide emergency lighting for the dance area. Provide ADA approved door hardware on kitchen door and on exit door between the bar and elevator lobby. See IFC 1008.1.8.1 and remove the dead bolt. Double doors (inactive leaf) from the dance area to the elevator lobby must be locked open during business hours. Provide signage stating this at the doors. Relocate exit sign to be above the active leaf.
|
BLD-Final | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | PART |
Dave Hannah
|
|
|
Ok for temp. occupancy. No outstanding structural issues, need final sign-offs from all agencies prior to issuing final CO.
|
Temporary occupancy | | | 4/15/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5232 issued 4-15-05 to The Loft in the Adelman Bldg. on the 2nd floor.
|
Meeting | | | 4/15/2005 | | DONE |
|
|
|
Special visit made to accommodate a rush request from Bruce Poe for a TOC for his client. Approved by Fire for TOC by R. Ross, subject to several fire related deficiencies to be corrected within the TOC period. A follow up visit will be made early next week by the PDS/Fire inspector to issue a formal correction notice specifying items to be corrected.
|
Plan assigned to (R_H) | 4/4/2005 | | 4/14/2005 | | PASS |
|
|
|
4/14/2005 07:46:57 RMH - activity updated through activity BLDA022 from case BLD05-00855.
|
Routing - PLAN CHECK | 4/13/2005 | | 4/14/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/14/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/14/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/14/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/14/2005 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 4/14/2005 | | DONE |
|
|
|
|
Routing - FIRE | 4/7/2005 | | 4/13/2005 | | PASS |
|
|
|
review faxed to architect.
|
1st review completed | | | 4/13/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/12/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/7/2005 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/6/2005 | | 4/7/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 4/7/2005 | | 4/7/2005 | | PEND |
|
|
|
No corrections required by the building department review, Routed plans to the fire department on 4/7/05 Permit pending fire departments review and approval.
|
Routing - PUBLIC WORKS | 4/4/2005 | | 4/6/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/3/2005 | | |
|
|
|
|
Application received | | | 3/31/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/31/2005 | | DONE |
|
|
|
|
Fee Review-notes | 3/31/2005 | 3/31/2005 | | | |
|
|
|
|