BLD-Final | 1/19/2006 | 1/20/2006 | 1/20/2006 | P | PASS |
Tom Arcoraci
|
|
|
Builder has and faxed me a copy of Res. C/O done on 11/30/05. Activities show no final inspection? phone # for Mr. Taylor ###-#### ///1/19/06 LEG
|
DOC - Permit Finaled | 1/20/2006 | 1/20/2006 | 1/20/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Tom Arcoraci
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/20/2005 | 9/22/2005 | 9/22/2005 | A | FAIL |
Tom Arcoraci
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 9/15/2005 | 9/19/2005 | 9/19/2005 | P | FAIL |
Tom Arcoraci
|
|
|
craig Note: late as possible; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles not ready
|
BLD-Foundation | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 7:39:04 AM. Contact: ###-####.
|
BLD-Footing | 8/8/2005 | 8/8/2005 | 8/8/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 6:50:46 AM. Contact: ###-####.
|
BLD-Footing | 8/5/2005 | 8/5/2005 | 8/5/2005 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/5/2005 at 6:39:59 AM. Contact: ###-####. exca ok
|
Issue PAID IN FULL permit | | | 7/20/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/7/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/3/2005 | 6/2/2005 | 6/3/2005 | | PASS |
|
|
|
6/3/2005 13:38:03 SAM - activity updated through activity BLDA022 from case BLD05-00885.
|
Routing - PLAN CHECK | 5/10/2005 | | 6/3/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/2/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/2/2005 | | DONE |
|
|
|
16:00 I called and left a message for the designer to call me. I need to know what size beam he would like by the stairs.
|
Routing - PUBLIC WORKS | 5/10/2005 | | 5/10/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 5/10/2005 | | 5/10/2005 | | PASS |
|
|
|
Okay per revised drawings.
|
Routing - PLANNING | 4/29/2005 | | 4/29/2005 | | FAIL |
|
|
|
Applicant only submitted one set of plans. We will need two sets for each of the two parcels building permits have been submitted for, resulting in the need for FOUR SETS.
|
Routing - PLANNING | 4/6/2005 | | 4/6/2005 | | FAIL |
|
|
|
Side setback must be 5' and driveway exceeds that allowed for substandard lots in the front setback. Left message w/ applicant at 3:50p.m. CER
|
Routing - PLANNING Land Div | 4/4/2005 | | 4/6/2005 | | PASS |
|
|
|
Reviewed w/ D. Abo. Parcels ok. CER
|
Application received | | | 4/3/2005 | | |
|
|
|
|