Permit NumberBLD05-00916
StatusFinaled
Name STEED CONSTRUCTION
Site Address 10051 W EMERALD ST
Project NameEmerald Tech Center Bldg #11
Customer Number 
ePlanReviewNo
Description
Emerald Tech Center - Building #11 (Shell Only) - To construct a new 13,140 sq. ft, one story concrete tilt-up exterior walls with steel roof system office and storage shell building with a 140 sq. ft. mechanical room at the south side of the building. This is a shell building only. There is no occupancy allowed under this permit. Separate tenant improvement permits are required to finish this building for occupancy. All construction per the approved plans and attached comment list. DRH04-31/CUP04-00107/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20071/26/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice10/17/200610/17/200612/27/2006 DONE
DetailsMike Jordan
BLD-Final10/17/200610/17/200610/17/2006PPASS
DetailsMike Jordan
DOC - Permit Finaled10/17/200610/17/200610/17/2006PPASS
DetailsMike Jordan
All letters have been received. Shell and core ok. L of C issued.
FIRE-Final Inspection10/13/200610/16/200610/16/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final10/12/200610/13/200610/13/2006APART
DetailsMike Jordan
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp given. Will meet with contractor today to get final aff. letter from special insp. agency and letter from engineer. Life/safety also needs to final.
Override - Parcel Holds1/1/19001/1/190010/13/2006  
FIRE-Final Inspection10/12/200610/12/200610/12/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the knox box is provided.
Override - Parcel Holds1/1/19001/1/190010/12/2006  
Override - Parcel Holds1/1/19001/1/190010/12/2006  
BLD-Conference8/29/20068/29/20068/29/2006PDONE
DetailsMike Jordan
Recieved phone call from Dan Stuart in plan review noting that he had a TI for bldg. but shell and core has not yet been finaled or Fire/life/safety. A c/n has been posted.
BLD-Aging Inspection7/28/20067/28/20067/31/2006 NR
DetailsMike Jordan
BLD-Aging Inspection5/5/20065/5/20065/5/2006 NR
DetailsMike Jordan
Code Occupancy Approval12/6/200512/6/200512/6/2005PPASS
DetailsCarol Montgomery
A copy of the landscape plan that was in the packet on site has been delivered to City Hall for file DRH05-00031. Meets compliance. Signed Final
Code Occupancy Approval12/6/200512/6/200512/6/2005PCANC
DetailsCarol Montgomery
Duplicate inspection record
PubWorks Occupancy Approval12/1/200512/1/200512/1/2005 DONE
Drainage project complete, signed occupancy permit 12/01/05. F.Gitts
BLD-Framing/Rough-in9/20/20059/21/20059/21/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/20/2005 at 1:49:52 PM. Contact: ###-####.
Frame at windows and equipment rm ok
BLD-Concrete8/1/20058/2/20058/2/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/1/2005 at 3:44:49 PM. Contact: ###-####.
Approx 5 conc tilt up panels.....OK pending MTI special insp tests and approvals.
BLD-Footing6/15/20056/15/20056/15/2005PPART
DetailsTom Arcoraci
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles spec insp req
BLD-Final6/3/20056/3/20056/3/2005PDEFR
DetailsMike Jordan
roof drain inspection///mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to call public works or plumbing.
(F) Reprint permit  5/31/2005  
BLD-Final5/27/20055/27/20055/27/2005PDEFR
DetailsJim Sly
roof drain inspcetion///jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need Public Works to inspect drainage and seepage pits.
Issue PAID IN FULL permit  5/27/2005  
Inspection Record Card- Bld  5/25/2005 DONE
Permit Ready to Issue  5/25/2005 DONE
Telephone call  5/25/2005 DONE
Spoke with Elaine and told her that permit is ready, fees and that we need ACHD////5/25/05 9:15am BAS
Routing - FIRE5/23/2005 5/24/2005 PASS
Received a resubmittal that included the hydrant flow. I called Brandi Johns and requested the information for comment #3, water pressure and flow for automatic sprinklers from United Water. She will fax it to me when she gets it.
Plan resubmittals received  5/24/2005 DONE
Received United Water water pressure and flow for automatic sprinklers information from Brandi Johns.
Routing - PLAN CHECK5/24/2005 5/24/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/24/2005 DONE
Plan assigned to (JCM)4/7/2005 5/24/2005 PASS
5/24/2005 09:44:10 JCM - activity updated through activity BLDA022 from case BLD05-00916.
Routing - PLAN CHECK5/20/2005 5/23/2005  
Routing - PLANNING Land Div5/19/2005 5/19/2005 PASS
Approved for Parcel B on ROS04-00017. ROS 6508 recorded on May 13, 2004.
Routing Off Site - STRUCTURAL5/2/2005 5/6/2005 PASS
Called PDQ for pick up. - Received faxed letter from the consulting structural engineer approving resubmitted structural documents. JCM
Routing - PLANNING Land Div5/5/2005 5/6/2005 FAIL
Need to provide copy of recorded deed to match Notice of Buildable Parcel and need new Tax Parcel # from Ada County Assessor.
Routing - PLANNING5/2/2005 5/5/2005 PASS
Routing - PLAN CHECK4/28/2005 5/2/2005  
Plan resubmittals received  5/2/2005 DONE
Received Transmittal Document ,1 United Water sheet,1 Response,& 6 Copys of sheets L 1,C-6 & 4 Copys of sheets S1.0,S3.1,S7.2 Taken to John M.
Routing - FIRE4/25/2005 4/28/2005 FAIL
Resubmittal of hydrant and water flows for sprinkler system
1st review completed  4/28/2005 FAIL
Failed planning, structural and fire
Routing - PLANNING4/19/2005 4/25/2005 FAIL
CUP04-00107 Karen G. Plans failed - need property lines to match ROS 6508, need compact parking stalls labeled, need public easement for sidewalk located on site on Emerald (Wes to check sidewalks actual location and design - possible meandering, if so not shown). Called Wes.

DRH04-00031 Sara S. Approved per DRH05-00031. Passed plans on to Karen G. 4/21/05

Routing - PLAN CHECK4/25/2005 4/25/2005 PASS
John M.
Routing - PLUMBING4/13/2005 4/19/2005 PASS
per plans and 2003 upc
Plan resubmittals requested  4/15/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL4/7/2005 4/14/2005 FAIL
Called PDQ for pick up.
Routing - Erosion and Sediment4/12/2005 4/13/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS4/7/2005 4/12/2005 PASS
Plan resubmittals received  4/8/2005 DONE
Received Trasnsmittal,1 letter,1 copy of receipt,3 Geotechnical report, & 3 Copys of sheets A0,A2.1,A3.1,A7.1,A8.2,E2.1L Taken to John M.
(F) Reprint permit  4/7/2005 DONE
Telephone call  4/7/2005  
Called Wes Steel, left message that we need 2 soils reports.///DLD
Routing - PLANNING Land Div4/7/2005 4/7/2005 FAIL
Need to provide copy of recorded deed and new Tax Parcel #. Talked to Bob Camp at Habitec ###-####. Also called Engineering Northwest and left message.
Plans ACCEPTED BY PLAN TECH  4/7/2005  
Called Wes Steel, left message that we need 2 soils reports. Sent plans on ///DLD
Plan routing begun/NEW & ADDTN  4/7/2005  
Application received  4/6/2005