Third Notice BLD | 7/18/2007 | 7/18/2007 | 10/1/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 4/7/2005 | 4/7/2005 | 10/1/2008 | | DONE |
Cathy Brown
|
|
|
|
Second Notice BLD | 7/5/2007 | 7/5/2007 | 7/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/15/2007 | 7/5/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/15/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11665 issued 6-15-07 to Edwards Theaters 9 Screen Cinema in BODO BLdg. #7.
|
Permanent Occupancy | | 3/13/2007 | 3/13/2007 | | DONE |
|
|
|
|
BLD-Final | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PASS |
Dave Hannah
|
|
|
James Woodbury ###-#### ok for perm occ
|
BLD-Aging Inspection | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | PASS |
Dave Hannah
|
|
|
fyi 410 need final sch
|
FIRE-Final Inspection | 3/5/2007 | 3/6/2007 | 3/7/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Other | 11/8/2005 | 11/10/2005 | 11/14/2005 | P | DONE |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Final | 11/10/2005 | 11/10/2005 | 11/14/2005 | P | PART |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp occ issued c/n on site also needs other trades to sign off perm and shell finaled c.c
|
FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanniman's permission. An additional emergency light needs to be added in the west projector room and fire extinguishers installed. Per contractor these items will be completed by the evening of 11-11-05. The fire alarm and fire sprinkler permits need to be finaled.
|
Temporary occupancy | | | 11/10/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5305 issued 11-10-05 to Edwards Theaters 9 Screen Cinema in the BODO Bldg. # 7.
|
FIRE-Final Inspection | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | FAIL |
Forrest France
|
|
|
Door is not installed yet at box office storage room below escalators, provide fire extinguisher at first floor elevator lobby, repair emergency light at stair landing by theatre #7, temporary max occupant load signs have been installed, door hardware is missing at mezz door, inspection concluded at this time project is not ready for final inspection.
|
BLD-Framing/Rough-in | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | PART |
Dave Hannah
|
|
|
Dave,please call Alex by 9am to discuss the 12x12 glass openings.; Phone #: ###-#### Internet Inspection Request from: Ben Kos ok to use glass that is spected by door manufactor
|
BLD-Final | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | NR |
Dave Hannah
|
|
|
john --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie still needs other trades to sign off
|
BLD-Final | 11/3/2005 | 11/3/2005 | 11/4/2005 | P | PART |
Dave Hannah
|
|
|
Please call Dennis Re: Final Inspection Internet Inspection Request from: Alex Monge walked project with dinnis but still needs other trades to signoff temp
|
FIRE-Final Inspection | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | FAIL |
Forrest France
|
|
|
See correction notice for a list of defficient items, not all items reviewed at this inspection, several issues remain.
|
BLD-Other | 10/25/2005 | 10/27/2005 | 10/31/2005 | P | CANC |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos out of time
|
BLD-Other | 10/17/2005 | 10/20/2005 | 10/24/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos checking double stair ok to proceed
|
Inspection Record Card- Bld | | | 10/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2005 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/19/2005 | 10/19/2005 | 10/19/2005 | A | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
|
BLD-Other | 10/17/2005 | 10/18/2005 | 10/19/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
|
BLD-Framing/Rough-in | 10/10/2005 | 10/13/2005 | 10/14/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 10/10/2005 | 10/11/2005 | 10/12/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos proofit meeting
|
BLD-Other | 10/3/2005 | 10/6/2005 | 10/7/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos tickit both and front entry way at ground floor ok to cover but still need to fire proof pipes on west wall
|
BLD-Framing/Rough-in | 10/5/2005 | 10/6/2005 | 10/6/2005 | A | PART |
Dave Hannah
|
|
|
Please call Dennis Harter in the AM. Thanks.....10:00 Internet Inspection Request from: Alex Monge tickit both area
|
BLD-Other | 10/3/2005 | 10/4/2005 | 10/5/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 9/26/2005 | 9/29/2005 | 9/30/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 9/26/2005 | 9/27/2005 | 9/28/2005 | P | DONE |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos ada doors and landings
|
BLD-Framing/Rough-in | 9/19/2005 | 9/22/2005 | 9/23/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 9/19/2005 | 9/20/2005 | 9/21/2005 | P | PART |
Dave Hannah
|
|
|
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos 2hr fire protection under main stairs
|
BLD-Framing/Rough-in | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ben Kos looked at ground floor hallway wall framing every thing oki but need arch to ok top of wall attachment deff than plans
|
BLD-Framing/Rough-in | 9/16/2005 | 9/16/2005 | 9/19/2005 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Conference | 9/13/2005 | 9/15/2005 | 9/16/2005 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ben Kos rest room area ok to cover
|
BLD-Framing/Rough-in | 9/12/2005 | 9/13/2005 | 9/13/2005 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ben Kos needs to patch fire proofing in restrooms area
|
BLD-Framing/Rough-in | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ben Kos
|
BLD-Framing/Rough-in | 8/29/2005 | 9/1/2005 | 9/2/2005 | P | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walked project with dinnis
|
BLD-Framing/Rough-in | 8/29/2005 | 8/30/2005 | 8/30/2005 | P | NR |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/29/2005 | 8/29/2005 | 8/30/2005 | P | CANC |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/22/2005 | 8/25/2005 | 8/30/2005 | P | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exit #2 door size carl w working with arc
|
BLD-Framing/Rough-in | 8/22/2005 | 8/23/2005 | 8/24/2005 | P | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore stair tower no 2 crew working on walls
|
BLD-Framing/Rough-in | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore crews working on stair towers
|
BLD-Conference | 8/13/2005 | 8/15/2005 | 8/15/2005 | A | PART |
Dave Hannah
|
|
|
Concern with Stair# 3 intermediate landing and column interference. please review before we construct. Talk to Alex or Dennis. Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 8/8/2005 | 8/11/2005 | 8/11/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/9/2005 | 8/9/2005 | 8/10/2005 | P | DONE |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/5/2005 | 8/5/2005 | 8/8/2005 | P | PART |
Dave Hannah
|
|
|
wall penetration//dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa plumbing penetrations in floor top ok crew will do bottom later
|
BLD-Framing/Rough-in | 8/1/2005 | 8/4/2005 | 8/4/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/1/2005 | 8/2/2005 | 8/3/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa walked project with george
|
BLD-Framing/Rough-in | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/21/2005 | 7/25/2005 | 7/25/2005 | A | PART |
Dave Hannah
|
|
|
see dennis framing ok to date
|
BLD-Framing/Rough-in | 7/18/2005 | 7/21/2005 | 7/21/2005 | A | PART |
Tom Arcoraci
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip ok
|
BLD-Framing/Rough-in | 7/19/2005 | 7/19/2005 | 7/19/2005 | P | PART |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | CANC |
Tom Arcoraci
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/8/2005 | 7/14/2005 | 7/14/2005 | A | PART |
Dave Hannah
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 7/8/2005 | 7/12/2005 | 7/12/2005 | A | PART |
Dave Hannah
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 7/5/2005 | 7/7/2005 | 7/8/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa all areas as of today ok
|
BLD-Framing/Rough-in | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Dave Hannah
|
|
|
Rough framing inspection. Internet Inspection Request from: Alex Monge second floor framing ok to cover
|
BLD-Framing/Rough-in | 6/24/2005 | 6/24/2005 | 6/27/2005 | P | PART |
Dave Hannah
|
|
|
Partial framing inspection for wall close-up. We also would like to discuss a regular schedule for inspections.; Phone #: ###-#### Internet Inspection Request from: Alex Monge int steel stud walls ok to cover
|
Issue PAID IN FULL permit | | | 6/23/2005 | | |
|
|
|
|
Plan assigned to (CJW) | 4/12/2005 | | 6/20/2005 | | PASS |
|
|
|
6/20/2005 15:20:47 CJW - activity updated through activity BLDA022 from case BLD05-00922.
|
Routing - PLANNING | 6/20/2005 | | 6/20/2005 | | PASS |
|
|
|
Approved, except that a separate sign permit required for signage prior to installation of "Edwards Theater" signs.
|
Routing - PLAN CHECK | 6/17/2005 | | 6/20/2005 | | DONE |
|
|
|
To Planning
|
Routing - PLAN CHECK | 6/20/2005 | | 6/20/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/20/2005 | | |
|
|
|
|
Telephone call | | | 6/20/2005 | | DONE |
|
|
|
tlk to alex ###-#### that permit and fees are ready to be picked up
|
Routing - FIRE | 6/13/2005 | | 6/17/2005 | | PASS |
|
|
|
Resubmittal not complete but approved per "red" annotations and revised review comments; faxed to architect.
|
Routing - PLAN CHECK | 5/11/2005 | | 6/13/2005 | | PASS |
|
|
|
Approved after resubmittal review.
|
Plan resubmittals received | | | 6/8/2005 | | DONE |
|
|
|
Received 1 Transmittal,1 resopnse sheet, 1 Plan Review Report,1 Fire Code Review,& 2 Copys of sheets A1.1,A.1.3,A.3.1,A.4.1,A.5.1,A.5.2,A.5.3,A.5.9,A.6.1,A.6.2,A.9.1,A.9.2,A.9.3,A.9.4,A.9.5,A.9.6,A.10.1,A.11.1,A.11.2,A.12.1,A.13.1A.14.1A.15.1,A.16.1,A.17.1,A.18.2,A.18.3,S1.0,S1.1,S2.0,S.0L,S2.1,S3.0,S3.1,S3.2,M2.1,M2.2,P2.1,P3.1,P3.2,P4.1,E2.1,E3.1,E5.2,E5.3,E7.2 Taken to Carl W.
|
Plan resubmittals received | | | 6/8/2005 | | DONE |
|
|
|
Received 4 Transmittal Letters 4 Responses ,& 4 Copys of sheet S2.4 Taken to Carl W.
|
Plan resubmittals received | | | 6/2/2005 | | |
|
|
|
Received (4) copies of suppliemental structural calculations for theater signage support. Routed to Carl W.
|
Routing - FIRE | 5/5/2005 | | 5/11/2005 | | FAIL |
|
|
|
review comments attached and faxed to archtitect.
|
1st review completed | | | 5/11/2005 | | FAIL |
|
|
|
failed Plan check and Fire.
|
Routing - PLAN CHECK | 4/20/2005 | | 5/5/2005 | | FAIL |
|
|
|
The IBC plan review was started on April 21, 2005 and was finished on May 5, 2005. Resubmitted drawings were required. See the plan review report.
|
Routing - PLUMBING | 4/15/2005 | | 4/20/2005 | | PASS |
|
|
|
provide a floor sink to discharge the grease trap into or a floor sink upstream of the grease trap to discharge the sink into to achieve an air gap. 120 deg. max. hot water to hand sinks in concessions area. install cleanouts at the ends of the horizontal wastes at riser diagram P/4. add a water supply to the automatic soap dispensors at the mop sinks. R.P.s may be required on the water lines serving the chillers. thermol expantion protection will be required.
|
Routing - PUBLIC WORKS | 4/12/2005 | | 4/15/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2005 | | DONE |
|
|
|
Ok to take in plans with the 2000 lighting / mechanical comp per Marlene S.
|
Application received | | | 4/7/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/7/2005 | | DONE |
|
|
|
|