Permit Information
Permit NumberBLD05-00922
StatusFinaled
Name EDWARDS THEATRES 9 SCREEN CINEMA
Site Address 760 W BROAD ST
Project NameEDWARDS THEATRE BODO 7
Customer Number 
ePlanReviewNo
Description
(EDWARDS THEATRES 9 SCREEN CINEMA - BODO BLDG #7) This building is fire sprinklered for fire area and for the multitheater complex. To construct a 56,493 square foot multitheater complex (2,407 square foot 1st story, 45,536 square foot 2nd story, 8,550 square foot 2nd story mezzanine) within an existing 138,293 square foot building. Work is to include 2-hr fire barrier walls, interior nonbearing walls, open stairways, 2-hr enclosed stairways, 2 public restrooms accessible to the disabled, 1 unisex restroom accessible to the disabled, 1 employee restroom accessible to the disabled, 1-hr exit passageways, elevated floors, suspended ceilings, millwork, and finishes. All work shall comply with the approved drawings, the plan review report, and applicable codes. The fire sprinkler system shall comply with 2002 NFPA 13 as regulated by the Fire Department. Construction of "EDWARDS" sign NOT allowed untill Design Review approval. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD7/18/20077/18/200710/1/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Fee Review-notes4/7/20054/7/200510/1/2008 DONE
DetailsCathy Brown
Second Notice BLD7/5/20077/5/20077/18/2007 DONE
First Notice has not been responded to.
First Notice 6/15/20077/5/2007 DONE
Permanent occupancy  6/15/2007 DONE
Perm. Occ. Cert. # 11665 issued 6-15-07 to Edwards Theaters 9 Screen Cinema in BODO BLdg. #7.
Permanent Occupancy 3/13/20073/13/2007 DONE
Details
BLD-Final3/7/20073/8/20073/8/2007APASS
DetailsDave Hannah
James Woodbury ###-#### ok for perm occ
BLD-Aging Inspection3/7/20073/7/20073/7/2007PPASS
DetailsDave Hannah
fyi 410 need final sch
FIRE-Final Inspection3/5/20073/6/20073/7/2007APASS
DetailsForrest France
Fire life safety finaled.
BLD-Other11/8/200511/10/200511/14/2005PDONE
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Final11/10/200511/10/200511/14/2005PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp occ issued c/n on site also needs other trades to sign off perm and shell finaled c.c
FIRE-Final Inspection11/9/200511/10/200511/10/2005APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. An additional emergency light needs to be added in the west projector room and fire extinguishers installed. Per contractor these items will be completed by the evening of 11-11-05. The fire alarm and fire sprinkler permits need to be finaled.
Temporary occupancy  11/10/2005 DONE
Temp. Occ. Cert. # 5305 issued 11-10-05 to Edwards Theaters 9 Screen Cinema in the BODO Bldg. # 7.
FIRE-Final Inspection11/7/200511/7/200511/7/2005PFAIL
DetailsForrest France
Door is not installed yet at box office storage room below escalators, provide fire extinguisher at first floor elevator lobby, repair emergency light at stair landing by theatre #7, temporary max occupant load signs have been installed, door hardware is missing at mezz door, inspection concluded at this time project is not ready for final inspection.
BLD-Framing/Rough-in11/4/200511/7/200511/7/2005APART
DetailsDave Hannah
Dave,please call Alex by 9am to discuss the 12x12 glass openings.; Phone #: ###-#### Internet Inspection Request from: Ben Kos ok to use glass that is spected by door manufactor
BLD-Final11/3/200511/4/200511/4/2005ANR
DetailsDave Hannah
john --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie still needs other trades to sign off
BLD-Final11/3/200511/3/200511/4/2005PPART
DetailsDave Hannah
Please call Dennis Re: Final Inspection Internet Inspection Request from: Alex Monge walked project with dinnis but still needs other trades to signoff temp
FIRE-Final Inspection11/3/200511/4/200511/4/2005AFAIL
DetailsForrest France
See correction notice for a list of defficient items, not all items reviewed at this inspection, several issues remain.
BLD-Other10/25/200510/27/200510/31/2005PCANC
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos out of time
BLD-Other10/17/200510/20/200510/24/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos checking double stair ok to proceed
Inspection Record Card- Bld  10/21/2005 DONE
Print Occupancy Form  10/21/2005 DONE
BLD-Framing/Rough-in10/19/200510/19/200510/19/2005APART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
BLD-Other10/17/200510/18/200510/19/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
BLD-Framing/Rough-in10/10/200510/13/200510/14/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in10/10/200510/11/200510/12/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos proofit meeting
BLD-Other10/3/200510/6/200510/7/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos tickit both and front entry way at ground floor ok to cover but still need to fire proof pipes on west wall
BLD-Framing/Rough-in10/5/200510/6/200510/6/2005APART
DetailsDave Hannah
Please call Dennis Harter in the AM. Thanks.....10:00 Internet Inspection Request from: Alex Monge tickit both area
BLD-Other10/3/200510/4/200510/5/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/26/20059/29/20059/30/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/26/20059/27/20059/28/2005PDONE
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos ada doors and landings
BLD-Framing/Rough-in9/19/20059/22/20059/23/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/19/20059/20/20059/21/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos 2hr fire protection under main stairs
BLD-Framing/Rough-in9/19/20059/19/20059/19/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos looked at ground floor hallway wall framing every thing oki but need arch to ok top of wall attachment deff than plans
BLD-Framing/Rough-in9/16/20059/16/20059/19/2005PCANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Conference9/13/20059/15/20059/16/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos rest room area ok to cover
BLD-Framing/Rough-in9/12/20059/13/20059/13/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos needs to patch fire proofing in restrooms area
BLD-Framing/Rough-in9/12/20059/13/20059/13/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in8/29/20059/1/20059/2/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walked project with dinnis
BLD-Framing/Rough-in8/29/20058/30/20058/30/2005PNR
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/29/20058/29/20058/30/2005PCANC
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/22/20058/25/20058/30/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exit #2 door size carl w working with arc
BLD-Framing/Rough-in8/22/20058/23/20058/24/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore stair tower no 2 crew working on walls
BLD-Framing/Rough-in8/18/20058/19/20058/19/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore crews working on stair towers
BLD-Conference8/13/20058/15/20058/15/2005APART
DetailsDave Hannah
Concern with Stair# 3 intermediate landing and column interference. please review before we construct. Talk to Alex or Dennis. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in8/8/20058/11/20058/11/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/9/20058/9/20058/10/2005PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/8/20058/9/20058/9/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/5/20058/5/20058/8/2005PPART
DetailsDave Hannah
wall penetration//dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa plumbing penetrations in floor top ok crew will do bottom later
BLD-Framing/Rough-in8/1/20058/4/20058/4/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/1/20058/2/20058/3/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa walked project with george
BLD-Framing/Rough-in7/27/20057/28/20057/28/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/21/20057/25/20057/25/2005APART
DetailsDave Hannah
see dennis framing ok to date
BLD-Framing/Rough-in7/18/20057/21/20057/21/2005APART
DetailsTom Arcoraci
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip ok
BLD-Framing/Rough-in7/19/20057/19/20057/19/2005PPART
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in7/18/20057/19/20057/19/2005ACANC
DetailsTom Arcoraci
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/8/20057/14/20057/14/2005APART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/8/20057/12/20057/12/2005APART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/5/20057/7/20057/8/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa all areas as of today ok
BLD-Framing/Rough-in6/29/20056/30/20056/30/2005APASS
DetailsDave Hannah
Rough framing inspection. Internet Inspection Request from: Alex Monge second floor framing ok to cover
BLD-Framing/Rough-in6/24/20056/24/20056/27/2005PPART
DetailsDave Hannah
Partial framing inspection for wall close-up. We also would like to discuss a regular schedule for inspections.; Phone #: ###-#### Internet Inspection Request from: Alex Monge int steel stud walls ok to cover
Issue PAID IN FULL permit  6/23/2005  
Plan assigned to (CJW)4/12/2005 6/20/2005 PASS
6/20/2005 15:20:47 CJW - activity updated through activity BLDA022 from case BLD05-00922.
Routing - PLANNING6/20/2005 6/20/2005 PASS
Approved, except that a separate sign permit required for signage prior to installation of "Edwards Theater" signs.
Routing - PLAN CHECK6/17/2005 6/20/2005 DONE
To Planning
Routing - PLAN CHECK6/20/2005 6/20/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/20/2005 DONE
Permit Ready to Issue  6/20/2005  
Inspection Record Card- Bld  6/20/2005 DONE
Print Occupancy Form  6/20/2005  
Telephone call  6/20/2005 DONE
tlk to alex ###-#### that permit and fees are ready to be picked up
Routing - FIRE6/13/2005 6/17/2005 PASS
Resubmittal not complete but approved per "red" annotations and revised review comments; faxed to architect.
Routing - PLAN CHECK5/11/2005 6/13/2005 PASS
Approved after resubmittal review.
Plan resubmittals received  6/8/2005 DONE
Received 1 Transmittal,1 resopnse sheet, 1 Plan Review Report,1 Fire Code Review,& 2 Copys of sheets A1.1,A.1.3,A.3.1,A.4.1,A.5.1,A.5.2,A.5.3,A.5.9,A.6.1,A.6.2,A.9.1,A.9.2,A.9.3,A.9.4,A.9.5,A.9.6,A.10.1,A.11.1,A.11.2,A.12.1,A.13.1A.14.1A.15.1,A.16.1,A.17.1,A.18.2,A.18.3,S1.0,S1.1,S2.0,S.0L,S2.1,S3.0,S3.1,S3.2,M2.1,M2.2,P2.1,P3.1,P3.2,P4.1,E2.1,E3.1,E5.2,E5.3,E7.2 Taken to Carl W.
Plan resubmittals received  6/8/2005 DONE
Received 4 Transmittal Letters 4 Responses ,& 4 Copys of sheet S2.4 Taken to Carl W.
Plan resubmittals received  6/2/2005  
Received (4) copies of suppliemental structural calculations for theater signage support. Routed to Carl W.
Routing - FIRE5/5/2005 5/11/2005 FAIL
review comments attached and faxed to archtitect.
1st review completed  5/11/2005 FAIL
failed Plan check and Fire.
Routing - PLAN CHECK4/20/2005 5/5/2005 FAIL
The IBC plan review was started on April 21, 2005 and was finished on May 5, 2005. Resubmitted drawings were required. See the plan review report.
Routing - PLUMBING4/15/2005 4/20/2005 PASS
provide a floor sink to discharge the grease trap into or a floor sink upstream of the grease trap to discharge the sink into to achieve an air gap. 120 deg. max. hot water to hand sinks in concessions area. install cleanouts at the ends of the horizontal wastes at riser diagram P/4. add a water supply to the automatic soap dispensors at the mop sinks. R.P.s may be required on the water lines serving the chillers. thermol expantion protection will be required.
Routing - PUBLIC WORKS4/12/2005 4/15/2005 PASS
Plans ACCEPTED BY PLAN TECH  4/8/2005 DONE
Ok to take in plans with the 2000 lighting / mechanical comp per Marlene S.
Application received  4/7/2005  
Recd Pcfee & Taken To Pln CK  4/7/2005 DONE