Case Summary (BLD) | | | 3/24/2015 | | DONE |
|
|
|
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | PASS |
Dave Hannah
|
|
|
Barb----Dave this was given temp on 5-2-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 5-2-07. Please let me know...thanks Phone #: ###-#### ok to go perm
|
Letter of compliance | | | 8/14/2008 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 8/14/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Joe R Venneman
|
|
|
Landscaping meets bld requirements
|
Print Occupancy Form | | | 4/18/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/27/2008 | 3/27/2008 | 3/28/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Aging Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Final | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | NR |
Dave Hannah
|
|
|
daryl Phone #: ###-#### need fire to go perm
|
Case Summary (BLD) | | | 7/20/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 7/20/2007 | | |
|
|
|
|
Temporary occupancy | | | 5/2/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5578 issued 5-2-07 to the Cityside Lofts parking garage.
|
BLD-Final | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PART |
Dave Hannah
|
|
|
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
|
FIRE-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | NR |
Forrest France
|
|
|
Need project related fire sprinkler final prior to life safety inspection request.
|
PubWorks Occupancy Approval | 5/1/2007 | 5/1/2007 | 5/1/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | | PART |
|
|
|
Okayed for Temporary occupancy.
|
BLD-Final | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | FAIL |
Dave Hannah
|
|
|
Darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades signed off walked project made a punch list
|
BLD-Other | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PART |
Dave Hannah
|
|
|
Darryl ceiling grid; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover after other trades ok
|
Plan resubmittals received | | | 4/25/2006 | | |
|
|
|
Received 1 copy of cover transmittal letter & 3 copies of A10.1 and taken to Mike Phillips
|
BLD-Concrete | 3/21/2006 | 3/21/2006 | 3/23/2006 | P | PART |
Dave Hannah
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north pt slabe
|
BLD-Concrete | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PART |
Dave Hannah
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north pt slab
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 3/20/2006 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/17/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/3/2006 | 1/3/2006 | 3/10/2006 | | PASS |
|
|
|
3/10/2006 10:56:22 M_P - activity updated through activity BLDA022 from case BLD05-00926.
|
Routing - PLAN CHECK | 3/8/2006 | | 3/10/2006 | | PASS |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/10/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 3/10/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/10/2006 | | DONE |
|
|
|
PLAN MODIFICATION :
|
Case Summary (BLD) | | | 3/10/2006 | | DONE |
|
|
|
PLAN MODIFICATION:
|
Override - Parcel Holds | | | 3/10/2006 | | |
|
|
|
|
Print Occupancy Form | | | 3/10/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/10/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/10/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2006 | | DONE |
|
|
|
talked to john price at ###-#### permit is ready
|
Override - Parcel Holds | | | 3/10/2006 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 3/10/2006 | | DONE |
|
|
|
|
Routing - PLUMBING | 3/7/2006 | | 3/8/2006 | | PASS |
|
|
|
PLAN MODIFICATION * Received resubmittals. provide for suds relief. parking garage only
|
Routing Off Site - STRUCTURAL | 3/7/2006 | | 3/8/2006 | | PASS |
|
|
|
PLAN MODIFICATION: Called Action Courrier for pick up
|
Plan resubmittals received | | | 3/7/2006 | | |
|
|
|
Received 1 copy of transmittal letter, 3 copies of the following S0.1, S0.2, S1.0, S1.1, S1.2, S2.0, S2.1, S3.0, S3.1 and taken to Mike P.
|
Routing - PLAN CHECK | 3/2/2006 | | 3/7/2006 | | |
|
|
|
PLAN MODIFICATION * Routing to Plumbing.
|
Plan resubmittals received | | | 3/3/2006 | | DONE |
|
|
|
Received 1 transmittal, 3 copys of sheets PP.1,P2.2,P2.3,P2.4,P2.5,P2.6,P3.0,P3.1,P3.2,P3.3,P4.0,P5.0,P6.0 taken to Mike P.
|
Routing - PLUMBING | 3/1/2006 | | 3/2/2006 | | FAIL |
|
|
|
PLAN MODIFICATION. provide a complete plumbing plan for the north end apartments for all floors. provide for suds relief.
|
Routing - PLAN CHECK | 2/10/2006 | | 3/1/2006 | | PEND |
|
|
|
PLAN MOD * Waiting for others to approve prior to issuing permit.
|
Routing - PLAN CHECK | 3/1/2006 | | 3/1/2006 | | |
|
|
|
Routed to plumbing!
|
Routing Off Site - STRUCTURAL | 2/10/2006 | | 2/28/2006 | | FAIL |
|
|
|
PLAN MOD. Called Action Couriers for pick up
Additional information required for further review.
|
Routing - PLANNING | 2/14/2006 | | 2/21/2006 | | PASS |
|
|
|
PLAN MODIFICATION. Approved.
|
Plan resubmittals received | | | 2/15/2006 | | |
|
|
|
Received 3 copies of the following P2.0, P2.1, P5.0, P2.1(1st floor PLM plan dated 2-06 and taken to Mike P.
|
Routing - PLUMBING | 2/10/2006 | | 2/14/2006 | | FAIL |
|
|
|
PLAN MOD provide plumbing plans
|
Routing - PUBLIC WORKS | 2/10/2006 | | 2/10/2006 | | PASS |
|
|
|
PLAN MOD
|
Plan resubmittals received | | | 2/8/2006 | | |
|
|
|
1 Copy of transmittal letter, 3 copies of structural calcs and 4 copies of ST1.1 and taken to Mike P
|
Routing Off Site - STRUCTURAL | 1/5/2006 | | 1/12/2006 | | FAIL |
|
|
|
PLAN MOD. Called PDQ for pick up
Need additional plans to reflect upper floor loads and calculations prior to review.
|
Plan Modification Accepted | | | 1/3/2006 | | |
|
|
|
Plan Modification excepted for modifications to concrete deck,columns,stair,elevator at north end of building only.
revisions made to sheet S1.0 Plans routed to Mike P.
|
(F) Reprint permit | | | 10/10/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 10/5/2005 | | 10/7/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/7/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2005 | | DONE |
|
|
|
Left message with Charlie (GC) that permit is ready & fees///10/07/05 3:50pm BAS
|
Telephone call | | | 10/7/2005 | | DONE |
|
|
|
Left message for Steve Hosak that permit is ready///10/07/05 3:55pm BAS
|
Issue PAID IN FULL permit | | | 10/7/2005 | | |
|
|
|
|
Plan assigned to (M_P) | 4/29/2005 | | 10/7/2005 | | PASS |
|
|
|
10/7/2005 14:30:36 M_P - activity updated through activity BLDA022 from case BLD05-00926.
|
Routing - Erosion and Sediment | 10/5/2005 | | 10/5/2005 | | PASS |
|
|
|
ESC modification re-submittal approved.
|
Routing - PLANNING | 10/4/2005 | | 10/4/2005 | | PASS |
|
|
|
Conditions of approval with CUP04-87 have been met. All conditions of approval remain in effect, and no change in use is approved at this time. CER
|
Routing - PLANNING | 8/22/2005 | | 8/26/2005 | | FAIL |
|
|
|
Awaiting final copy of recorded easement before issuing permit. Applicant's attorney contacted. CER
Recorded easement okay, awaiting request for phasing and approval from DR.
|
Routing - PLAN CHECK | 8/10/2005 | | 8/22/2005 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLAN CHECK | 8/22/2005 | | 8/22/2005 | | |
|
|
|
Routing to Planning
|
Routing - FIRE | 7/28/2005 | | 8/10/2005 | | PASS |
|
|
|
resubmittal acceptable; revised comments faxed to architect.
|
Plan resubmittals received | | | 8/2/2005 | | |
|
|
|
Received (3) copies of sheet A.2, A2.1, A9 and E8. Routed to Mike P.
|
Routing Off Site - STRUCTURAL | 7/27/2005 | | 8/1/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/15/2005 | | 7/28/2005 | | FAIL |
|
|
|
Second review failed, sent correction report to architect requesting additional informaiton be submitted for further review.
|
Plan resubmittals received | | | 7/26/2005 | | DONE |
|
|
|
Received 1 Response & 3 Copys of sheets A1.1,A2.0,A2.1,S0.2,S1.0,S2.1,S3.0,S3.1,SW1.0,SW3.0,SW3.1,SW4.0 Taken to Mike P.
|
Routing Off Site - STRUCTURAL | 6/24/2005 | | 7/26/2005 | | FAIL |
|
|
|
Routed resubmittal that was received on 6/23/05 .
2nd review failed, faxed comments to architect further review required by outside engineerig firm.
|
Routing - FIRE | 7/14/2005 | | 7/15/2005 | | FAIL |
|
|
|
Revised plan review comments to reflect approval of FD access roadways. Remainder of 6/15/05 resubmittal items have not yet been responded to by architect. REvised comments faxed to architect.
|
Plan resubmittals received | | | 7/8/2005 | | |
|
|
|
Received (3) copies of sheet A0.1, A1.0, A1.1, A10.1, A10.2, A2.1, A5.0, A8.0, A8.2, A9.0, SW1.0, S1.0, M2.0, M2.1 and C1.0. Routed to Mike P.
|
Plan resubmittals received | | | 6/23/2005 | | |
|
|
|
Received (3) copies of sheet A1.0, A1.1, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A4.0, A4.1, S0.1, S0.2, S1.0, S1.1, S1.2, S2.0, S2.1, S3.0, S3.1, SW0.1, SW3.0, SW3.1, SW4.0 and SW5.0. Also received (2) copies of calcs from Fine Engineering and (3) copies of calcs from Treasure Valley Engineers. Routed to Mike P.
|
1st review completed | | | 6/16/2005 | | FAIL |
|
|
|
failed planning, ESC, plan check and fire.
|
Routing - PLAN CHECK | 6/16/2005 | | 6/16/2005 | | HOLD |
|
|
|
Waiting for resubmittals prior to rerouting.
|
Routing - FIRE | 6/9/2005 | | 6/16/2005 | | FAIL |
|
|
|
Review comments faxed to architect.
|
Plan resubmittals received | | | 6/13/2005 | | |
|
|
|
Received (3) copies of sheet A1.0 and A1.1. Routed to Mike P.
|
Routing - PLAN CHECK | 6/2/2005 | | 6/9/2005 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 5/16/2005 | | 6/2/2005 | | FAIL |
|
|
|
Approved per DRH04-00241 for grading, site work, and parking garage permit only. Marty S.
CUP04-00087 Pending review by Karen G.
Plans do not meet the conditions of approval related to bicycle parking, accessible parking space, and patio setback. Left message and faxed memo to applicant. CER
|
Routing Off Site - STRUCTURAL | 5/4/2005 | | 5/17/2005 | | FAIL |
|
|
|
Called PDQ for pick up.
Structural comments failed faxing comments to architect additional review required by outside engineering firm.
|
Plan Reviewer's activity | | | 5/17/2005 | | DONE |
|
|
|
Faxing outside structural review to architect.
|
Routing - PLUMBING | 5/5/2005 | | 5/16/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 5/11/2005 | | DONE |
|
|
|
Received ESC re-submittal.
|
Routing - Erosion and Sediment | 5/11/2005 | | 5/11/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Plan resubmittals received | | | 5/6/2005 | | DONE |
|
|
|
recieved via fax 1 cover page, 4 page letter from Stapley Engineering to plan review comments
|
Plan resubmittals received | | | 5/6/2005 | | DONE |
|
|
|
Received Via fax , 1 Facsimile Cover Sheet / Note from John P. to Steve W. Taken to Mike P.
|
Routing - Erosion and Sediment | 5/5/2005 | | 5/5/2005 | | FAIL |
|
|
|
ESC plan does not meet conditions per BMC 8-17. Informed PD and Tamura. Checklist completed. RP is required because contractor has been called out.
|
Routing - PUBLIC WORKS | 4/29/2005 | | 5/5/2005 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/29/2005 | | 5/4/2005 | | |
|
|
|
Called PDQ for pick up
|
Plan routing begun/NEW & ADDTN | | | 4/29/2005 | | |
|
|
|
|
(F) Reprint permit | | | 4/29/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/29/2005 | | 4/29/2005 | | PASS |
|
|
|
One parcel with one Tax Parcel #.
|
Plans ACCEPTED BY PLAN TECH | | | 4/11/2005 | | |
|
|
|
|
Application received | | | 4/7/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/7/2005 | | DONE |
|
|
|
|
Fee Review-notes | 4/7/2005 | 4/7/2005 | | | |
|
|
|
|