Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-00928
StatusFinaled
Name GEORGE FISCHER CONSTRUCTION
Site Address 910 N ORCHARD ST
Project NameBOISE CREDIT UNION
Customer Number 
ePlanReviewNo
Description
(BOISE CREDIT UNION) Exterior remodel to an existing building to replace exterior stairs, provide a new roof structure over existing second story balcony/deck, and refinish deck surface per approved plans, structural engineering, and CZC05-00040. Work to include miscellaneous demolition work, some new roof structure framing, new steel stairway with supports and reinforced concrete footings, new handrails, new guards, some new roof covering work, and electrical work. Special Inspection required for structural steel welding. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD8/18/20068/18/200612/22/2006 DONE
Second Notice has not been responded to.
Second Notice BLD7/7/20067/7/20068/18/2006 DONE
First Notice has not been responded to.
First Notice6/9/20066/9/20067/7/2006 DONE
DetailsJim Storey
BLD-Final6/9/20066/9/20066/9/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/9/2006 at 6:59:26 AM. Contact: ###-####.
DOC - Permit Finaled6/9/20066/9/20066/9/2006PPASS
DetailsJim Storey
BLD-Final6/5/20066/6/20066/6/2006PCANC
DetailsDave Hannah
larry Note: call 1/2 hr prior please; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection6/5/20066/6/20066/6/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final5/24/20065/25/20065/25/2006PNR
DetailsJim Storey
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need fire and framing c/n idem
FIRE-Final Inspection5/19/20065/19/20065/19/2006PFAIL
DetailsTroy Cobbley
Provide blank instead of the keyed lock on the exterior door.
BLD-Conference5/17/20065/18/20065/18/2006AFAIL
DetailsJim Storey
larry call 1hour prior to insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection5/17/20065/17/20065/17/2006PFAIL
DetailsTroy Cobbley
No approved plans on site. No inspection performed.
BLD-Final5/17/20065/17/20065/17/2006PCANC
DetailsTony Young
LARRY nOTE: LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final5/17/20065/17/20065/17/2006PCANC
DetailsTony Young
Larry Fischer, earl afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final5/16/20065/17/20065/17/2006AFAIL
DetailsTony Young
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need to call for a conf.,,, stairs not per code
BLD-Foundation4/11/20064/11/20064/11/2006PCANC
DetailsTom Arcoraci
BLD-Foundation4/10/20064/11/20064/11/2006APART
DetailsTom Arcoraci
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in3/27/20063/28/20063/28/2006APART
DetailsTom Arcoraci
larry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie arhc to ok changes as built
Issue PAID IN FULL permit  2/10/2006 DONE
Ready Permit EXTENDED  2/8/2006 DONE
Permit application extended until April 10, 2006. Plan review process took longer than expected and winter weather delayed start of project.
Telephone call  1/5/2006 DONE
talked to larry fischer at ###-#### & said he had sent a letter to jenifer g. to request an extension
Telephone call  1/3/2006 DONE
left mess again for larry fischer at ###-#### that he could file for an extension & use the same plans if not changing anything
Telephone call  9/22/2005 DONE
Inspection Record Card- Bld  9/21/2005 DONE
Permit Ready to Issue  9/21/2005 DONE
Routing - PLAN CHECK8/2/2005 9/20/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/20/2005 PASS
Plan assigned to (JCB)4/15/2005 9/20/2005 PASS
9/20/2005 16:33:52 JCB - activity updated through activity BLDA022 from case BLD05-00928.
Plan resubmittals received  9/19/2005  
Received (2) copies of sheet A1, A2 and A3. Routed to Jason B.
Plan resubmittals received  9/12/2005 DONE
Received 1 Letter to Larry Fisher, 1 calc sheet, & 2 Copys of sheets E1,1,2,3,4,5, Taken to Jason B.
Telephone call  8/16/2005 DONE
Called and left message with Ron Hexum, architect. Only one copy of shop drawings of steel stairway provided? (No professional stamp on plans.) Small footing/column detail provided with no professional stamp. No updated architectural sheet provided.
Plan resubmittals received  8/10/2005  
Received (1) copy of sheet E1, 1, 2, 3, 4 and 5. Routed to Jason B.
Routing - Erosion and Sediment8/1/2005 8/2/2005 PASS
ESC plan waiver request approved with attached conditions.
Routing - PLAN CHECK6/7/2005 8/1/2005 FAIL
Cannot approve project with resubmittals provided. Sheet A3 does not match the submitted structural engineering. Will route plans to ESC for approval.
Telephone call  8/1/2005 DONE
Called contractor to let him know sheet A3 did not match the submitted structural engineering. To be addressed. Architect also called and stated he would contact the structural engineer and address.
Plan resubmittals received  7/28/2005  
Received (2) sets of sheet A1, A2 and A3. Routed to Jason B.
Plan resubmittals requested  6/6/2005 DONE
Plan resubmittals and written response required again.
Routing - PLAN CHECK5/5/2005 6/6/2005 FAIL
Second plan review e-mailed to architect and faxed to contractor. Some issues from original plan review report not adequately addressed or not even addressed at all.
Plan resubmittals received  6/1/2005 DONE
Received 2 Copys of sheets A1,A2,A3 Taken to Jason B.
Plan resubmittals received  5/24/2005 DONE
Resubmittals received and forwarded to Jason: Structural response cover letter, 1 copy of general structural notes, 2 copies of structural calcs for deck & stair, and 2 copies of plan sheets A1, A2 and A3.
1st review completed  5/5/2005 FAIL
failed ESC and plan check.
Routing - FIRE5/3/2005 5/5/2005 PASS
No review comments required.
Routing - Erosion and Sediment5/3/2005 5/3/2005 FAIL
Talked with Steve Webb and an Erosion/Sediment Control Permit is required. ESC application and waiver letter to be submitted.
Plan resubmittals requested  5/3/2005 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK4/19/2005 5/3/2005 FAIL
Plan review e-mailed and sent to architect. A copy also faxed to contractor. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PLANNING4/15/2005 4/19/2005 PASS
Approved per CZC05-00040
Recd Pcfee & Taken To Pln CK  4/13/2005 DONE
Plans ACCEPTED BY PLAN TECH  4/13/2005  
Application received  4/8/2005  
Fee Review-notes4/13/20054/13/2005