Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00962
StatusFinaled
Name STATUS HOMES INC
Site Address 11470 W SILVERCITY CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1598sq.ft. Two story single family dwelling (518sq.ft. Main level / 1080sq.ft. Upper level) with a 35sq.ft. Covered front porch, and a 472sq.ft. Attached two car garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/28/20061/30/20061/30/2006APASS
DetailsMike Jordan
Internet Inspection Request from: Carey Allen
DOC - Permit Finaled1/30/20061/30/20061/30/2006PPASS
DetailsMike Jordan
BLD-Final1/23/20061/26/20061/26/2006ANR
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Carey Allen. Needs elec. final.
BLD-Energy code compliance12/7/200512/7/200512/7/2005PPASS
DetailsMike Jordan
carey ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/7/200512/7/200512/7/2005PPASS
DetailsMike Jordan
carey ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Received and reviewed engineering for garage header. ok.
BLD-Framing/Rough-in12/5/200512/5/200512/5/2005PFAIL
DetailsJim Storey
karey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need 3@16 mlb per plan or eng./ fire blk ceilling linr at attic chase 2nd floor and return air duct
BLD-Framing/Rough-in12/2/200512/2/200512/2/2005PFAIL
DetailsMike Jordan
karey; Phone #: ###-#### . Provide approved plans and truss engineering for inspection.
BLD-Final12/2/200512/2/200512/2/2005PCANC
DetailsMike Jordan
karey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs framing
BLD-Foundation10/5/200510/7/200510/7/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/5/2005 at 3:57:45 PM. Contact: ###-####.
BLD-Footing10/5/200510/6/200510/6/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/5/2005 at 3:57:29 PM. Contact: ###-####.
Issue PAID IN FULL permit  9/26/2005 DONE
Plan assigned to (SRZ)9/16/20059/16/20059/19/2005 PASS
9/19/2005 10:07:16 SRZ - activity updated through activity BLDA022 from case BLD05-00962.
Case Summary (BLD)  9/19/2005  
PLANS/APPL TAKEN TO FRONT DESK  9/19/2005 DONE
ONE SET RED-LINED
Inspection Record Card- Bld  9/19/2005 DONE
Permit Ready to Issue  9/19/2005 DONE
Telephone call  9/19/2005 DONE
called ###-#### and told kim permit is ready and fees
Routing - PLAN CHECK8/29/2005 9/19/2005 PASS
Plan assigned to (SAM)4/11/20054/11/20059/16/2005 DONE
Routing - PUBLIC WORKS8/26/2005 8/29/2005 PASS
Routing - PLANNING8/26/2005 8/26/2005 PASS
Plan resubmittals received  8/25/2005  
Received (2) complete sets of plans. Routed to Cody R.
Routing - PLANNING6/16/2005 6/16/2005 FAIL
Revised Plans failed: Home is shown in the 15' rear setback.
Routing - PLANNING6/7/2005 6/7/2005 FAIL
Fail: Parking is not setback 20' from edge of common drive, as required by plat note.
Routing - PLANNING5/9/2005 5/9/2005 FAIL
At 8:00 a.m. I returned telephone message left by applicant on 5/6/05. Various issues with five sets of plans they had submitted. Requested they stop in to review. As of 3:45 p.m., have not heard back. Spoke w/ another representative of Status Homes last week, and relayed the same information. CER
Routing - PLANNING4/11/2005 4/12/2005 FAIL
Left message w/ applicant at 9:30a.m. regarding issues with access from common driveway, and setback at the 50' avg. lot width. CER
Application received  4/11/2005