Permit Information
Permit NumberBLD05-00976
StatusFinaled
Name DOUBLE L CONSTRUCTION LLC
Site Address 523 W BROAD ST
Project NameBOISE WEEKLY
Customer Number 
ePlanReviewNo
Description
(BOISE WEEKLY) Remodel to an existing 3,209 sq. ft. building changing occupancy from assembly use to office use for a new tenant per approved plans and CZC05-00079. Work to include miscellaneous interior demolition work, some new interior walls and doors, interior finish, some new skylight installations, mechanical work, and electrical work. The East wall of this space is an existing 2-hour rated fire wall with an existing 90 minute rated door in the wall. The South exterior wall is existing one-hour rated per location on property line with a 30" minimum parapet and no openings. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/20051/4/2006 DONE
Second Notice has not been responded to.
Second Notice BLD10/10/200510/10/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 9/21/200510/10/2005 DONE
Permanent occupancy  9/21/2005 DONE
Perm. Occ. Cert. # 10737 issued 9-21-05 to the Boise Weekly.
BLD-Final9/15/20059/15/20059/15/2005PPASS
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ
Permanent Occupancy 9/15/20059/15/2005 DONE
Details
BLD-Final8/1/20058/1/20058/1/2005PPART
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Letitia ok for temp occ needs to finish elec and onnings
FIRE-Final Inspection8/1/20058/1/20058/1/2005PPASS
DetailsForrest France
Fire life safety passed inspection.
BLD-Conference7/29/20057/29/20058/1/2005PDONE
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Conference7/28/20057/28/20057/28/2005PDONE
DetailsForrest France
On site discussion with Kent the GC regarding duct smoke detection, remote annunciators, egress lighting, building address, door hardware and location of fire extinguishers.
BLD-Energy code compliance7/25/20057/26/20057/26/2005APASS
DetailsDave Hannah
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/12/20057/13/20057/13/2005PPASS
DetailsDave Hannah
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate
BLD-Conference7/5/20057/6/20057/6/2005ADONE
DetailsDave Hannah
walked the project
BLD-Conference7/5/20057/5/20057/5/2005PCANC
DetailsTom Arcoraci
kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Conference6/30/20057/1/20057/1/2005ACANC
DetailsTony Young
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wants 425
FIRE-Conference6/30/20057/1/20057/1/2005ADONE
DetailsForrest France
On site discussion with Kent the GC regarding requirements for the main entry/exit door hardware, swing direction and clear width.
Issue PAID IN FULL permit  6/3/2005 DONE
Routing - PLAN CHECK5/19/2005 6/1/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/1/2005 PASS
Inspection Record Card- Bld  6/1/2005 DONE
Print Occupancy Form  6/1/2005 DONE
Permit Ready to Issue  6/1/2005 DONE
Telephone call  6/1/2005 DONE
tlk to cathy sewell ###-#### that permit and fees are ready to be picked up
Plan assigned to (JCB)4/15/2005 6/1/2005 PASS
6/1/2005 10:39:16 JCB - activity updated through activity BLDA022 from case BLD05-00976.
Plan resubmittals received  5/25/2005  
Received (2) copies of sheet A2.1, E2.0L and E3.1. Also (1) copy of the response letter and the skylight specs were submitted. Routed to Jason B.
1st review completed  5/19/2005 FAIL
failed plan check.
Routing - FIRE5/12/2005 5/19/2005 PASS
review was not faxed to architect as no fax number was given.
Routing - PLANNING5/10/2005 5/12/2005 PASS
Sarah. Then route to Fire Dept.
Approved per CZC05-00079.
Plan resubmittals requested  5/10/2005 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK4/15/2005 5/10/2005 FAIL
Plan review report sent and e-mailed to architect. Plan resubmittals and written response required for further review. Plans to route to Sarah in Planning and then to the Fire Dept.
Pending Assignment by MYS4/12/2005 4/15/2005 DONE
4/15/2005 12:29:04 MYS - activity updated through activity BLDA184 from case BLD05-00976.
Plans ACCEPTED BY PLAN TECH  4/14/2005 DONE
Application received  4/12/2005  
Recd Pcfee & Taken To Pln CK  4/12/2005  
Fee Review-notes4/12/20054/12/2005