BLD-Final | 8/25/2006 | 8/25/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
Jeff W. ###-####
|
BLD-Final | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
jeff- ###-#### for occ--call 1st before insp
|
DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 8/29/2006 | 8/29/2006 | 8/29/2006 | | BOND |
|
|
|
Grading was not done according to the approved plan. Contractor has bonded $6,000.00 to ensure that corrections are made. Grading and drainage is conditionally approved.
|
BLD-Final | 8/23/2006 | 8/24/2006 | 8/24/2006 | P | NR |
Dave Hannah
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs terry records final
|
BLD-Energy code compliance | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Dave Hannah
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Energy code compliance | 4/12/2006 | 4/12/2006 | 4/12/2006 | P | NR |
Mike Jordan
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 3rd floor was complete, noted to contractor ok to start sheetrock on 3rd floor only. Also reveiwed engineering for posts in garage and beams on main level. Beams in main level ok, additional post werre added in garage as per engineering.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Mike Jordan
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n have beenresolved except for engineering paperwork, which will be on site for energy code insp. ok to insulate.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | FAIL |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Note: please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles c/n on site do not insulate
|
BLD-Foundation | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 9:36:45 PM. Contact: ###-####.8 side walls ok to pour
|
BLD-Foundation | 8/16/2005 | 8/17/2005 | 8/18/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####.
|
BLD-Footing | 8/18/2005 | 8/18/2005 | 8/18/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####. ok to pour
|
BLD-Foundation | 8/12/2005 | 8/15/2005 | 8/16/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####. no plans on site
|
PubWorks Subgrade Approval | 4/13/2005 | 4/13/2005 | 8/16/2005 | | PASS |
|
|
|
Footing subgrade approved. 8/16/05
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 6/13/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/12/2005 | 5/18/2005 | 5/19/2005 | | PASS |
|
|
|
5/19/2005 09:42:53 SAM - activity updated through activity BLDA022 from case BLD05-00983.
|
Routing - PLAN CHECK | 5/5/2005 | | 5/19/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 5/19/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2005 | | DONE |
|
|
|
Only one set approved do to red-lining.
|
Override - Activity Holds | | | 5/19/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 5/19/2005 | | |
|
|
|
|
Override - Activity Holds | | | 5/19/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/19/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/19/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Telephone call | | | 5/19/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 4/19/2005 | | 5/4/2005 | | FAIL |
|
|
|
Routed to fire to get approval.
|
Routing - FIRE | 5/4/2005 | | 5/4/2005 | | PASS |
|
|
|
acceptable per revised sheet A2.1 received 4/21/2005 noting that a 13D system will be installed.
|
Routing - PLANNING | 4/25/2005 | | 4/25/2005 | | PASS |
|
|
|
Must limit chimney per plans to 35' tall. Revised submittals show this required change.
|
Plan resubmittals received | | | 4/21/2005 | | DONE |
|
|
|
Received 3 Copys of sheets A2.1,A2.2,A2.3 & 1 Letter to Sam R. Taken to Steve M.
|
Plan Reviewer's activity | | | 4/19/2005 | | DONE |
|
|
|
Faxed Fire Department review to Jeff Wallace on 4/19/05. Fax ####-####
|
Routing - Erosion and Sediment | 4/18/2005 | | 4/19/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 4/19/2005 | | 4/19/2005 | | FAIL |
|
|
|
Inadequate FD access. This flag lot requires an approved private FD access roadway. The driveway, extending 150' from Roanoke, needs to be widened to 20' wide and paved to withstand 70,000 lbs GVW. An acceptable alternative would be to install a 13 D fire sprinkler system. Plan review report written and attached to plans.
|
Routing - PLANNING | 4/13/2005 | | 4/18/2005 | | FAIL |
|
|
|
Jeff Wallace came in looking for his blg. plans. The plans were found within a stack of residentail plans in E. Grime's office. The plans had not been routed to me, the assigned planner of the hillside review still showed "plannign" had rcvd. them on 4/13. The plans still lack reduction in height details. Failed and routed to ESC.
|
Routing - PUBLIC WORKS GRADING | 4/12/2005 | | 4/13/2005 | | PASS |
|
|
|
Approved as Category 1 by CFH05-00009
|
Routing - PUBLIC WORKS | 4/13/2005 | | 4/13/2005 | | PASS |
|
|
|
|
Application received | | | 4/12/2005 | | |
|
|
|
|