BLD-Final | 11/8/2005 | 11/9/2005 | 11/9/2005 | P | PASS |
Jim Sly
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued.
|
DOC - Permit Finaled | 11/9/2005 | 11/9/2005 | 11/9/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/12/2005 at 10:33:40 AM.
|
BLD-Framing/Rough-in | 7/11/2005 | 7/12/2005 | 7/12/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/11/2005 at 4:26:03 PM. Contact: ###-####. c/n made ok
|
BLD-Framing/Rough-in | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/11/2005 at 8:31:29 AM. Contact: ###-####. c/n posted,, ok to insulate
|
BLD-Framing/Rough-in | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/8/2005 at 8:53:40 AM. Contact: ###-####. insulaters were on the job,,, called contractor,, pulled insulaters off job,, c/n posted to call for conf. and to have plans and engineering on job,, to do frame inspection
|
BLD-Framing/Rough-in | 7/7/2005 | 7/7/2005 | 7/8/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2005 at 10:35:27 AM. Contact: ###-####. needs plumbing r/i and seal package installed
|
Inspection Record Card- Bld | | | 5/27/2005 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 5/27/2005 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/27/2005 | | DONE |
|
|
|
had to re-issue permit made changes
|
Case Summary (BLD) | | | 5/26/2005 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 5/16/2005 | | DONE |
|
|
|
customer is changing plans put back into pending status
|
BLD-Foundation | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PART |
Tony Young
|
|
|
rob ###-####; Internet Inspection Request from: Letitia Mesa
|
CHANGE STATUS TO (ISS) | | | 5/11/2005 | | DONE |
|
|
|
already pd for permit
|
BLD-Footing | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PART |
Tony Young
|
|
|
###-#### doug
added rebar 5/10/2005 3:17:03 PM
|
Issue PAID IN FULL permit | | | 5/10/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 5/10/2005 | | DONE |
|
|
|
per darla change status to pending - back out fees on 5/10/2005 - cmc
|
BLD-Footing | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | CANC |
Tony Young
|
|
|
###-#### doug - doug cancelled 10:30 am
|
Plan assigned to (SRZ) | 5/9/2005 | 5/9/2005 | 5/9/2005 | | PASS |
|
|
|
5/9/2005 14:27:19 SRZ - activity updated through activity BLDA022 from case BLD05-00995.
|
Plan assigned to (SAM) | 4/14/2005 | 4/14/2005 | 5/9/2005 | | PASS |
|
|
|
5/9/2005 14:27:19 SRZ - activity updated through activity BLDA022 from case BLD05-00995.
|
Routing - PLAN CHECK | 4/22/2005 | | 5/9/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2005 | | DONE |
|
|
|
|
BLD-Footing | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PART |
Tony Young
|
|
|
chris ###-####
early start,, appears ok 5/6/2005 11:06:56 AM
|
Early Start Permit | | | 4/27/2005 | | DONE |
|
|
|
I had Rob sign early start permit and gave him a copy. No changes will be made to the site plan as earlier discussed.
|
Routing - PUBLIC WORKS | 4/21/2005 | | 4/22/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/19/2005 | | 4/21/2005 | | PASS |
|
|
|
verified lot split
|
Routing - PLANNING | 4/19/2005 | | 4/21/2005 | | PASS |
|
|
|
initially failed - but redlined site plan to ok 19' setback from 28th street under original lots of record standards. Site dimensions do not match dimensions of lot split. ok as noted. eeg.
|
Application received | | | 4/14/2005 | | |
|
|
|
|