BLD-Final | 5/10/2006 | 5/11/2006 | 5/11/2006 | A | PASS |
Tony Young
|
|
|
robert -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PASS |
Tom Arcoraci
|
|
|
robert; Phone #: ###-#### cell ####-#### please call if needed Internet Inspection Request from: Cathy Chiles ok mpending elec
|
BLD-Foundation | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | PASS |
Mike Jordan
|
|
|
wes; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Concrete | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PASS |
Mike Jordan
|
|
|
west; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 4/21/2005 | 4/21/2005 | 8/10/2005 | | DONE |
|
|
|
Subgradwe approved by the geotechnical engineer. 8/10/05
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 7/28/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/28/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/16/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 5/16/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 5/16/2005 | | |
|
|
|
|
Override - Activity Holds | | | 5/16/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 4/25/2005 | | |
|
|
|
called builder to request the required engineering for foundations in the hillside area. 4.25.2005 3:30p.m.
|
Routing - PUBLIC WORKS GRADING | 4/21/2005 | | 4/21/2005 | | PASS |
|
|
|
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Routing - Erosion and Sediment | 4/21/2005 | | 4/21/2005 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Application received | | | 4/20/2005 | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
Perry P.
|
Routing - PLAN CHECK | 4/21/2005 | | | | |
|
|
|
|