Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01062
StatusExpired
Name DIRK DUNHAM CONSTRUCTION INC
Site Address 3633 N LA MESITA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
*** HILLSIDE*** This fully engineered project in the foothills area is for approx 230s.f. addition to the family room on the main level and 230s.f. to the mastersuite on the upper level along with a 180s.f. redwood deck off of the main level addition. The Erosion and Sediment Control plan is passed by sgw. R-1B setbacks ok per eeg. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City."
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/5/200510/6/200510/6/2005ANR
DetailsTony Young
Please call John Barnet the home owner to make sure he is home. Thanks Dirk (###-####); Phone #: ###-#### x Internet Inspection Request from: Dirk
need hillside sign-off 1st
Dunham
BLD-Wall cover7/6/20057/8/20057/8/2005APASS
DetailsTony Young
Tony, Could you call me and let me know when you will be coming so I can meet you there? If you could give me at least thirty minutes would be great.

Thanks

Dirk Dunham; Phone #: ###-#### Internet Inspection Request from: Dirk Dunham
BLD-Framing/Rough-in7/5/20057/6/20057/6/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/5/2005 at 3:40:40 PM. Contact: ###-####. ,,, ok to insulate,, verify seal package,, venting method for roof,, straps to existing
BLD-Foundation6/2/20056/3/20056/3/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/2/2005 at 2:05:54 PM. Contact: ###-####.
BLD-Footing6/2/20056/2/20056/2/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/2/2005 at 10:11:01 AM. Contact: ###-####. as per new engineering
PubWorks Subgrade Approval4/21/20054/21/20056/2/2005 DONE
The footing subgrade has been approved by the geotechnical engineer WITH QUALIFICATIONS as described in the letter attached to this case in documents. TR 6/2/05

A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
Override - Activity Holds  5/12/2005  
Issue PAID IN FULL permit  5/12/2005 DONE
Print Occupancy Form  5/12/2005 DONE
Routing - PLAN CHECK4/4/2005 5/6/2005 PASS
Perry P.
Case Summary (BLD)  5/6/2005  
PLANS/APPL TAKEN TO FRONT DESK  5/6/2005 DONE
Override - Activity Holds  5/6/2005  
Inspection Record Card- Bld  5/6/2005 DONE
Override - Activity Holds  5/6/2005  
Inspection Record Card- Bld  5/6/2005 DONE
Override - Activity Holds  5/6/2005  
Permit Ready to Issue  5/6/2005 DONE
Telephone call  5/6/2005 DONE
lft vm with Dirk Dunham const ###-#### that permit and fees are ready to be picked up
Plan resubmittals received  5/4/2005 DONE
Received 1 ESC Application & 2 Narrtives Taken to Steve W.
Routing - Erosion and Sediment5/4/2005 5/4/2005 PASS
ESC plan approved with attached conditions.
Routing - Erosion and Sediment4/21/2005 4/22/2005 FAIL
ESC plan waiver request denied. Informed applicant.
Application received  4/21/2005  
Routing - PUBLIC WORKS GRADING4/21/2005 4/21/2005 PASS
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####