Third Notice BLD | 2/22/2007 | 2/22/2007 | 2/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/7/2007 | 2/7/2007 | 2/22/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/25/2007 | 2/7/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/25/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11409 issued 1-25-07 to St. Al's Family Maternity Center.
|
BLD-Final | 1/19/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 1/19/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
Permanent Occupancy | | 1/22/2007 | 1/22/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need fire alarm and fire sprinkler finaled first.
|
BLD-Final | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | NR |
Tom Arcoraci
|
|
|
carl - late afternoon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Other | 11/30/2006 | 12/1/2006 | 11/30/2006 | A | CANC |
Tom Arcoraci
|
|
|
see Karl
|
BLD-Aging Inspection | 11/17/2006 | 11/17/2006 | 11/17/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 9/29/2006 | | |
|
|
|
Received 1 cover transmittal, 2 copies of the following sheets--E-9, E-10, HR-1HR-2, HR-3, HR-4, HR-5, HR-7, B78, ST1, ST2, ST3, ST4, ST5, ST6 as deferred submittals and taken to Dan Stuart
|
Plan resubmittals received | | | 9/21/2006 | | |
|
|
|
Received deferred resubmittals; transmittal sheet, copy of proposed deferred submittals, 2 copies of the following: Wausau Window and Wall Systems (29 pgs/ea), calculations for Exterior Framing - Structural, specifications for Exterior Stud Wall System, specifications for Firestopping, specifications for Air Barriers(firestop for electrical penetration), specifications for Air Barriers(firestop for floor & wall penetration), specifications for Preformed Wall Panels, specifications for Curtian Wall System, specifications for Plant-Precast Architectural Concrete, specifications for Fireproofing; 4 copies of the following pages: E-9, E-10, B78, ST1, ST2, ST3, ST4, ST5, ST6; 2 copies of the following pages: HR1, HR2, HR3, HR4, HR5, HR6, 05-21(sheet 1), 05-21(sheet 2), D1.1, 1.1, 1.2, 2.1, 2.2, 4.1, T1, P1, P2, E1, E2, E3, E4, E5, D1; taken to Dan Stuart
|
FIRE-Final Inspection | 9/13/2006 | 9/14/2006 | 9/15/2006 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
FIRE-Final Inspection | 9/13/2006 | 9/13/2006 | 9/15/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the phase II (remodeled existing area) is complete. The new FMC building is complete.
|
BLD-Final | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PART |
Tom Arcoraci
|
|
|
richard cal 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie handrail at ext ,ramp at south ext and barrier under stair tower
|
Temporary occupancy | | | 9/15/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5445 issued 9-14-06 to St. Al's Family Maternity Center.
|
BLD-Wall cover | 8/25/2006 | 8/25/2006 | 8/25/2006 | P | PASS |
Tom Arcoraci
|
|
|
rich - Note: above ceiling fire wall inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Wall cover | 7/19/2006 | 7/19/2006 | 7/19/2006 | P | PASS |
Tom Arcoraci
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | PART |
Dave Hannah
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley hard lid in entry way ok to cover
|
BLD-Other | 6/15/2006 | 6/15/2006 | 6/15/2006 | P | CANC |
Dave Hannah
|
|
|
Rich, above ceiling firewall; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 3/21/2006 | 3/22/2006 | 3/22/2006 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/21/2006 at 12:43:00 PM. Contact: ###-####. 2nd floor walls ok excp washer box and some elec back to back
|
Plan resubmittals received | | | 3/17/2006 | | |
|
|
|
Received from Action Courrier 2 transmittal cover letter, 1 copy of product data sheet, 1 copy of material safety data sheet and taken to Dan S.
|
BLD-Framing/Rough-in | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | PART |
Tom Arcoraci
|
|
|
rich george; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover int walls on 1st floor ok to one side 2nd floor and partial cover at south end needs to address floor sink pents 2 of them at floor ceiling
|
BLD-Framing/Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PART |
Tom Arcoraci
|
|
|
rich george; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to one side
|
BLD-Framing/Rough-in | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | PART |
Tom Arcoraci
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ext walls ok for insul
|
BLD-Framing/Rough-in | 1/11/2006 | 1/11/2006 | 1/11/2006 | P | PART |
Tom Arcoraci
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie par ok for cover
|
Plan resubmittals received | | | 11/1/2005 | | |
|
|
|
Received (2) copies of sheet E-9, E-10, B78, ST1, ST2, ST3, ST4, ST5, ST6, HR1, HR2, HR3, HR4, HR5 and HR6. Routed to Dan S.
|
Issue PAID IN FULL permit | | | 10/20/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/20/2005 | | DONE |
|
|
|
Received 1 letter to George S., 1 elevation @ beam penetration,1 plan scetion@ beam /2 hr wall taken to Dan S.
|
Telephone call | | | 10/17/2005 | | DONE |
|
|
|
left mess for jeff cramer at ###-#### that permit is ready
|
Plan resubmittals received | | | 10/17/2005 | | |
|
|
|
Received 1 Letter to George S.,1 beam /2 hr wall,beam penetration. taken to Dan S.
|
Routing - PLAN CHECK | 10/12/2005 | | 10/14/2005 | | PASS |
|
|
|
Approved as noted on and all attached plan review conditions as part of the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2005 | | PASS |
|
|
|
Ready to issue.
|
Inspection Record Card- Bld | | | 10/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/14/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 10/14/2005 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 4/29/2005 | | 10/14/2005 | | PASS |
|
|
|
10/14/2005 15:38:27 DRS - activity updated through activity BLDA022 from case BLD05-01063.
|
Routing - FIRE | 9/20/2005 | | 10/12/2005 | | PASS |
|
|
|
resubmittal acceptable. review faxed to architect.
|
Additional plans submitted | | | 9/27/2005 | | DONE |
|
|
|
Received ONE COPY of engineering for stairs and ONE COPY of sheets E-9, E-10, B78, ST1, ST2, ST3, ST4, ST5 & ST6 for review.
|
Plan resubmittals received | | | 9/20/2005 | | |
|
|
|
Received (2) copies of sheet MH-101-5 and MP-101-5. Routed to Dan S.
|
Routing - PLAN CHECK | 6/24/2005 | | 9/20/2005 | | PEND |
|
|
|
Routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 9/19/2005 | | DONE |
|
|
|
Received cover letter of explanation and two copies of Sheets A-101A, A102A, A103A, P101A-5, P102A-5 & PP-103A-5 in response to fire code analyst plan review comments. Inserted into plans and routed back to fire code analyst for re-review.
|
Plan resubmittals received | | | 8/18/2005 | | DONE |
|
|
|
Received 1Transmittal,2 Response Letters, 2 Door Schedules & 2 Copys of sheets G-002,A-102A,A-214,A-401,A-511,AC-101A,AC-102A,IFF-102A,MH-101A-5,MH-102A-5,EL-102A-2 Taken to Dan S.
|
Routing - PLAN CHECK | 6/17/2005 | | 6/24/2005 | | FAIL |
|
|
|
Plans being re-routed to plumbing code review analyst. Received plumbing code resubmittals 6/24/05 with copies attached to plans.
|
Plan resubmittals received | | | 6/24/2005 | | DONE |
|
|
|
Received Transmittal , 1 Plumbing Plan Revirw, & 2 Copys of sheets M-802-5,P-101D-5,P10FA-5,M802-5 Taken to Dan S.
|
Routing - PLUMBING | 6/24/2005 | | 6/24/2005 | | PASS |
|
|
|
per plans and 2003 upc.
|
Routing - FIRE | 6/10/2005 | | 6/17/2005 | | FAIL |
|
|
|
review faxed to architect.
|
1st review completed | | | 6/17/2005 | | FAIL |
|
|
|
failed plumbing, plan check and fire.
|
Plan resubmittals requested | | | 6/10/2005 | | DONE |
|
|
|
Copy of plan review conditions requiring response from architect e-mailed to Jeff Cramer, HDR, for response.
|
Routing - PLAN CHECK | 5/13/2005 | | 6/10/2005 | | FAIL |
|
|
|
Resubmittals required. Routing to fire code analyst for review.
|
Routing - PLUMBING | 5/4/2005 | | 5/13/2005 | | FAIL |
|
|
|
provide double wall heat exchanger with leak detection for water heaters. extend 6" waste main south to the next 4" branch to the east. provide existing loading on the med. gas and vacuum system at tie in.
|
Routing - PLANNING | 5/2/2005 | | 5/4/2005 | | PASS |
|
|
|
Approved per DRH05-00002.
|
Routing - PUBLIC WORKS | 4/29/2005 | | 5/2/2005 | | PASS |
|
|
|
|
Pending Assignment by MYS | 4/21/2005 | | 4/29/2005 | | DONE |
|
|
|
4/29/2005 11:45:25 MYS - activity updated through activity BLDA168 from case BLD05-01063.
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2005 | | |
|
|
|
|
Application received | | | 4/21/2005 | | |
|
|
|
Told Jeff he will need the ESC plan with this submittle
|
Recd Pcfee & Taken To Pln CK | | | 4/21/2005 | | |
|
|
|
|
Fee Review-notes | 4/21/2005 | 4/21/2005 | | | |
|
|
|
|