BLD-Final | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | PASS |
Mike Jordan
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 8/2/2005 | 8/3/2005 | 8/3/2005 | P | PASS |
Tom Arcoraci
|
|
|
truss eng. regarding attic truss blocking is on job site. this is a insulation inspection before cover; Phone #: ###-#### Internet Inspection Request from: larry hobbs
|
BLD-Framing/Rough-in | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | FAIL |
Tom Arcoraci
|
|
|
would like to request a framing inspection for this job. thanks; Phone #: ###-#### Internet Inspection Request from: larry hobbs cn posted
|
BLD-Foundation | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Tom Arcoraci
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 5/17/2005 | 5/18/2005 | 5/18/2005 | P | PASS |
Tom Arcoraci
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 5/16/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 5/11/2005 | 5/11/2005 | 5/12/2005 | | PASS |
|
|
|
5/12/2005 10:10:00 SRZ - activity updated through activity BLDA022 from case BLD05-01066.
|
Case Summary (BLD) | | | 5/12/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2005 | | DONE |
|
|
|
called told permit was ready and fees
|
Routing - PLAN CHECK | 4/22/2005 | | 5/12/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2005 | | 4/22/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 4/21/2005 | | 4/21/2005 | | PASS |
|
|
|
Side setback must be 10' as scaled. The 9'-3" dimension does not relate.
|
Application received | | | 4/21/2005 | | |
|
|
|
|